| 1 | 100-6002 |
PREPARING ROW | 4 | STA |
$4,000.00 |
$103,500.00 |
$35,000.00 |
| 2 | 105-6045 |
REMOVING STAB BASE AND ASPH PAV (2"-8") | 2,946 | SY |
$20.00 |
$7.30 |
$21.00 |
| 3 | 110-6001 |
EXCAVATION (ROADWAY) | 1,120 | CY |
$20.00 |
$70.00 |
$94.00 |
| 4 | 110-6002 |
EXCAVATION (CHANNEL) | 1,139 | CY |
$22.00 |
$30.00 |
$94.00 |
| 5 | 132-6005 |
EMBANKMENT (FINAL)(ORD COMP)(TY C) | 1,875 | CY |
$25.00 |
$30.00 |
$94.00 |
| 6 | 150-6002 |
BLADING | 20 | HR |
$150.00 |
$170.00 |
$156.00 |
| 7 | 160-6003 |
FURNISHING AND PLACING TOPSOIL (4") | 6,923 | SY |
$3.00 |
$1.25 |
$4.60 |
| 8 | 164-6023 |
CELL FBR MLCH SEED(PERM)(RURAL)(CLAY) | 6,923 | SY |
$1.00 |
$0.7500 |
$0.7500 |
| 9 | 164-6029 |
CELL FBR MLCH SEED(TEMP)(WARM) | 1,731 | SY |
$1.00 |
$1.00 |
$1.00 |
| 10 | 164-6031 |
CELL FBR MLCH SEED(TEMP)(COOL) | 1,731 | SY |
$1.00 |
$1.00 |
$1.00 |
| 11 | 168-6001 |
VEGETATIVE WATERING | 233.5 | MG |
$75.00 |
$65.00 |
$32.20 |
| 12 | 169-6001 |
SOIL RETENTION BLANKETS (CL 1) (TY A) | 2,025 | SY |
$3.00 |
$2.00 |
$2.00 |
| 13 | 247-6057 |
FL BS (CMP IN PLC)(TYE GR1-2)(FNAL POS) | 1,076 | CY |
$100.00 |
$135.00 |
$180.60 |
| 14 | 260-6012 |
LIME(HYD,COM OR QK)(SLRY)OR QK(DRY) | 80 | TON |
$295.00 |
$296.00 |
$440.00 |
| 15 | 260-6027 |
LIME TRT (EXST MATL)(8") | 4,978 | SY |
$5.00 |
$7.00 |
$9.60 |
| 16 | 316-6029 |
ASPH (RC-250) | 959 | GAL |
$7.50 |
$10.00 |
$10.30 |
| 17 | 316-6202 |
AGGR(TY-E GR-5 SAC-B) | 36 | CY |
$240.00 |
$240.00 |
$552.50 |
| 18 | 316-6246 |
AGGR(TY-PE GR-3 SAC-B) | 58 | CY |
$190.00 |
$240.00 |
$580.00 |
| 19 | 316-6400 |
ASPH (AC-15P OR AC-10-2TR OR CRS-2P) | 1,916 | GAL |
$5.00 |
$10.00 |
$10.30 |
| 20 | 400-6005 |
CEM STABIL BKFL | 146 | CY |
$200.00 |
$140.00 |
$250.56 |
| 21 | 409-6002 |
PRESTR CONC PIL (18 IN SQ) | 900 | LF |
$200.00 |
$110.00 |
$432.00 |
| 22 | 409-6004 |
PRESTR CONC PIL (24 IN SQ) | 1,566 | LF |
$220.00 |
$180.00 |
$652.85 |
| 23 | 420-6013 |
CL C CONC (ABUT) | 56.6 | CY |
$1,500.00 |
$940.00 |
$1,619.98 |
| 24 | 420-6029 |
CL C CONC (CAP) | 103.3 | CY |
$1,550.00 |
$1,600.00 |
$1,943.98 |
| 25 | 422-6001 |
REINF CONC SLAB | 18,400 | SF |
$25.00 |
$23.00 |
$37.61 |
| 26 | 425-6035 |
PRESTR CONC GIRDER (TX28) | 2,382 | LF |
$320.00 |
$185.00 |
$186.84 |
| 27 | 432-6031 |
RIPRAP (STONE PROTECTION)(12 IN) | 643 | CY |
$200.00 |
$215.00 |
$264.60 |
| 28 | 432-6033 |
RIPRAP (STONE PROTECTION)(18 IN) | 1,085 | CY |
$195.00 |
$215.00 |
$264.60 |
| 29 | 450-6023 |
RAIL (TY SSTR) | 848 | LF |
$120.00 |
$77.00 |
$129.60 |
| 30 | 454-6018 |
SEALED EXPANSION JOINT (4 IN) (SEJ - M) | 137 | LF |
$185.00 |
$200.00 |
$162.00 |
| 31 | 496-6010 |
REMOV STR (BRIDGE 100 - 499 FT LENGTH) | 1 | EA |
$115,000.00 |
$1,000,000.00 |
$593,994.20 |
| 32 | 500-6001 |
MOBILIZATION | 1 | LS |
$342,119.00 |
$620,000.00 |
$750,000.00 |
| 33 | 502-6001 |
BARRICADES, SIGNS AND TRAFFIC HANDLING | 9 | MO |
$3,800.00 |
$8,000.00 |
$1,612.65 |
| 34 | 506-6001 |
ROCK FILTER DAMS (INSTALL) (TY 1) | 60 | LF |
$50.00 |
$75.30 |
$75.30 |
| 35 | 506-6011 |
ROCK FILTER DAMS (REMOVE) | 60 | LF |
$15.00 |
$12.00 |
$12.00 |
| 36 | 506-6038 |
TEMP SEDMT CONT FENCE (INSTALL) | 2,409 | LF |
$4.00 |
$4.25 |
$4.25 |
| 37 | 506-6039 |
TEMP SEDMT CONT FENCE (REMOVE) | 2,409 | LF |
$1.00 |
$0.7500 |
$0.7500 |
| 38 | 540-6001 |
MTL W-BEAM GD FEN (TIM POST) | 462.5 | LF |
$25.00 |
$30.40 |
$25.09 |
| 39 | 540-6006 |
MTL BEAM GD FEN TRANS (THRIE-BEAM) | 4 | EA |
$2,300.00 |
$2,780.00 |
$2,012.00 |
| 40 | 542-6001 |
REMOVE METAL BEAM GUARD FENCE | 555 | LF |
$4.00 |
$3.80 |
$2.50 |
| 41 | 544-6001 |
GUARDRAIL END TREATMENT (INSTALL) | 4 | EA |
$3,300.00 |
$3,241.85 |
$3,086.00 |
| 42 | 544-6003 |
GUARDRAIL END TREATMENT (REMOVE) | 4 | EA |
$300.00 |
$433.55 |
$343.00 |
| 43 | 644-6060 |
IN SM RD SN SUP&AM TYTWT(1)WS(P) | 3 | EA |
$550.00 |
$422.10 |
$910.00 |
| 44 | 644-6076 |
REMOVE SM RD SN SUP&AM | 3 | EA |
$100.00 |
$100.05 |
$100.00 |
| 45 | 658-6014 |
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI) | 10 | EA |
$80.00 |
$31.28 |
$20.00 |
| 46 | 658-6062 |
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI) | 4 | EA |
$35.00 |
$37.03 |
$20.00 |
| 47 | 658-6100 |
INSTL OM ASSM (OM-2Z)(WFLX)GND(BI) | 4 | EA |
$35.00 |
$55.43 |
$125.00 |
| 48 | 666-6174 |
REFL PAV MRK TY II (W) 6" (SLD) | 800 | LF |
$1.00 |
$0.2200 |
$0.2200 |
| 49 | 666-6210 |
REFL PAV MRK TY II (Y) 6" (SLD) | 800 | LF |
$1.00 |
$0.2200 |
$0.2200 |
| 50 | 672-6009 |
REFL PAV MRKR TY II-A-A | 33 | EA |
$6.00 |
$5.00 |
$5.00 |
| 51 | 678-6002 |
PAV SURF PREP FOR MRK (6") | 1,600 | LF |
$1.00 |
$0.1000 |
$0.1000 |
| 52 | 3076-6001 |
D-GR HMA TY-B PG64-22 | 1,034 | TON |
$150.00 |
$200.00 |
$164.50 |
| 53 | 3076-6042 |
D-GR HMA TY-D SAC-B PG70-22 | 496 | TON |
$160.00 |
$200.00 |
$235.40 |
| 54 | 3076-6066 |
TACK COAT | 920 | GAL |
$5.00 |
$10.00 |
$18.80 |
| 55 | 4027-6001 |
TEMP CONSTRUCTION ACCESS | 1 | LS |
$300,000.00 |
$1,300,000.00 |
$1,298,996.74 |
| 56 | 6001-6002 |
PORTABLE CHANGEABLE MESSAGE SIGN | 3 | EA |
$9,200.00 |
$20,000.00 |
$17,000.00 |
| 57 | 6439-6008 |
HPPM-RIB W/RET REQ TYI(W)6"(SLD)100MIL | 2,584 | LF |
$1.00 |
$1.40 |
$1.40 |
| 58 | 6439-6016 |
HPPM-RIB W/RET REQ TYI(Y)6"(SLD)100MIL | 2,584 | LF |
$1.00 |
$1.40 |
$1.40 |
| 59 | 800-6001 |
NO. OF WORKING DAYS | 10,462 | $/D |
$280.00 |
$200.00 |
$280.00 |