| 1 | 104-6017 |
REMOVING CONC (DRIVEWAYS) | 344 | SY |
$15.00 |
$35.00 |
$38.00 |
$40.00 |
|
| 2 | 132-6003 |
EMBANKMENT (FINAL)(ORD COMP)(TY B) | 991 | CY |
$30.00 |
$45.00 |
$48.00 |
$45.00 |
|
| 3 | 134-6004 |
BACKFILL (TY A OR B) | 262 | STA |
$120.00 |
$138.52 |
$225.00 |
$359.00 |
|
| 4 | 164-6001 |
BROADCAST SEED (PERM) (RURAL) (SANDY) | 34,773 | SY |
$0.1000 |
$0.2000 |
$0.4200 |
$0.1400 |
|
| 5 | 168-6001 |
VEGETATIVE WATERING | 298 | MG |
$25.00 |
$60.00 |
$78.00 |
$205.00 |
|
| 6 | 314-6010 |
EMULS ASPH (EROSN CONT)(SS-1) | 5,818 | GAL |
$3.75 |
$5.10 |
$5.25 |
$2.80 |
|
| 7 | 351-6001 |
FLEXIBLE PAVEMENT STRUCTURE REPAIR(5") | 42,178 | SY |
$30.00 |
$36.75 |
$42.00 |
$38.25 |
|
| 8 | 354-6051 |
PLANE ASPH CONC PAV (0" TO 1 1/2") | 5,826 | SY |
$1.75 |
$3.49 |
$5.25 |
$15.00 |
|
| 9 | 432-6045 |
RIPRAP (MOW STRIP)(4 IN) | 432 | CY |
$500.00 |
$620.01 |
$625.00 |
$567.00 |
|
| 10 | 500-6001 |
MOBILIZATION | 1 | LS |
$318,736.95 |
$434,737.74 |
$125,000.00 |
$240,000.00 |
|
| 11 | 502-6001 |
BARRICADES, SIGNS AND TRAFFIC HANDLING | 5 | MO |
$10,000.00 |
$40,000.00 |
$30,000.00 |
$16,000.00 |
|
| 12 | 506-6040 |
BIODEG EROSN CONT LOGS (INSTL) (8") | 1,300 | LF |
$5.00 |
$6.00 |
$4.50 |
$2.45 |
|
| 13 | 506-6043 |
BIODEG EROSN CONT LOGS (REMOVE) | 1,300 | LF |
$1.00 |
$1.00 |
$1.50 |
$1.00 |
|
| 14 | 530-6004 |
DRIVEWAYS (CONC) | 344 | SY |
$85.00 |
$120.91 |
$125.00 |
$132.33 |
|
| 15 | 530-6005 |
DRIVEWAYS (ACP) | 2,270 | SY |
$35.00 |
$9.95 |
$29.00 |
$32.00 |
|
| 16 | 530-6016 |
DRIVEWAYS (BASE) | 1,285 | SY |
$20.00 |
$40.54 |
$37.00 |
$89.38 |
|
| 17 | 533-6003 |
RUMBLE STRIPS (SHOULDER) ASPHALT | 52,358 | LF |
$0.2000 |
$0.0800 |
$0.1000 |
$0.0800 |
|
| 18 | 533-6004 |
RUMBLE STRIPS (CENTERLINE) ASPHALT | 26,179 | LF |
$0.2000 |
$0.1400 |
$0.1600 |
$0.1400 |
|
| 19 | 540-6001 |
MTL W-BEAM GD FEN (TIM POST) | 8,700 | LF |
$25.00 |
$18.75 |
$26.50 |
$24.00 |
|
| 20 | 540-6006 |
MTL BEAM GD FEN TRANS (THRIE-BEAM) | 12 | EA |
$2,250.00 |
$1,585.00 |
$2,100.00 |
$1,950.00 |
|
| 21 | 540-6037 |
MTL BM GD FEN TRANS (ANCHOR PLATE) | 12 | EA |
$800.00 |
$830.00 |
$1,025.00 |
$950.00 |
|
| 22 | 542-6001 |
REMOVE METAL BEAM GUARD FENCE | 8,625 | LF |
$2.00 |
$1.50 |
$2.15 |
$2.00 |
|
| 23 | 542-6002 |
REMOVE TERMINAL ANCHOR SECTION | 8 | EA |
$200.00 |
$150.00 |
$220.00 |
$200.00 |
|
| 24 | 544-6001 |
GUARDRAIL END TREATMENT (INSTALL) | 12 | EA |
$3,200.00 |
$2,631.00 |
$3,250.00 |
$2,950.00 |
|
| 25 | 658-6067 |
INSTL DEL ASSM (D-DW)SZ 1(BRF)GF2 | 105 | EA |
$30.00 |
$36.00 |
$24.00 |
$22.00 |
|
| 26 | 662-6111 |
WK ZN PAV MRK SHT TERM (TAB)TY Y-2 | 2,636 | EA |
$1.00 |
$0.4000 |
$2.50 |
$2.00 |
|
| 27 | 666-6303 |
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL) | 52,704 | LF |
$0.3000 |
$0.4500 |
$0.5000 |
$0.4400 |
|
| 28 | 666-6312 |
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL) | 3,720 | LF |
$0.3000 |
$0.4500 |
$0.5000 |
$0.4700 |
|
| 29 | 666-6315 |
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL) | 30,851 | LF |
$0.3000 |
$0.4500 |
$0.5000 |
$0.4400 |
|
| 30 | 668-6016 |
PREFAB PAV MRK TY B (W)(12")(SLD) | 64 | LF |
$25.00 |
$10.75 |
$11.50 |
$20.00 |
|
| 31 | 672-6009 |
REFL PAV MRKR TY II-A-A | 572 | EA |
$5.00 |
$4.40 |
$4.50 |
$3.60 |
|
| 32 | 752-6007 |
TREE REMOVAL (18" - 24" DIA) | 4 | EA |
$1,250.00 |
$1,500.00 |
$2,200.00 |
$2,000.00 |
|
| 33 | 752-6015 |
TREE AND BRUSH REMOVAL | 2 | AC |
$10,000.00 |
$5,000.00 |
$14,000.00 |
$13,000.00 |
|
| 34 | 3077-6059 |
SP MIXES SP-D SAC-B PG70-28 | 9,599 | TON |
$105.00 |
$125.75 |
$130.00 |
$135.00 |
|
| 35 | 3084-6001 |
BONDING COURSE | 6,981 | GAL |
$3.25 |
$4.17 |
$3.50 |
$4.80 |
|
| 36 | 6056-6001 |
PREFORMED IN-LANE(TRANS) RUMBLE STRIP | 320 | LF |
$15.00 |
$15.00 |
$7.50 |
$4.00 |
|
| 37 | 6185-6002 |
TMA (STATIONARY) | 112 | DAY |
$250.00 |
$397.70 |
$350.00 |
$386.00 |
|
| 38 | 6185-6005 |
TMA (MOBILE OPERATION) | 9 | DAY |
$300.00 |
$789.50 |
$700.00 |
$1,130.00 |
|