| 1 | 132-6003 |
EMBANKMENT (FINAL)(ORD COMP)(TY B) | 205 | CY |
$40.00 |
$25.00 |
$110.00 |
$110.00 |
| 2 | 134-6004 |
BACKFILL (TY A OR B) | 173 | STA |
$225.00 |
$250.00 |
$275.00 |
$310.00 |
| 3 | 164-6033 |
DRILL SEEDING (PERM) (RURAL) (SANDY) | 22,733 | SY |
$0.4500 |
$0.2100 |
$0.2500 |
$0.1800 |
| 4 | 168-6001 |
VEGETATIVE WATERING | 191 | MG |
$75.00 |
$20.00 |
$85.00 |
$40.00 |
| 5 | 314-6010 |
EMULS ASPH (EROSN CONT)(SS-1) | 5,683 | GAL |
$4.25 |
$3.90 |
$3.00 |
$6.00 |
| 6 | 351-6002 |
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6") | 7,000 | SY |
$55.70 |
$55.00 |
$55.00 |
$90.00 |
| 7 | 354-6021 |
PLANE ASPH CONC PAV(0" TO 2") | 7,749 | SY |
$7.00 |
$4.25 |
$4.00 |
$10.00 |
| 8 | 432-6045 |
RIPRAP (MOW STRIP)(4 IN) | 37 | CY |
$502.00 |
$1,416.00 |
$1,300.00 |
$875.00 |
| 9 | 500-6001 |
MOBILIZATION | 1 | LS |
$197,745.54 |
$214,000.00 |
$250,000.00 |
$160,000.00 |
| 10 | 502-6001 |
BARRICADES, SIGNS AND TRAFFIC HANDLING | 3 | MO |
$4,800.00 |
$15,247.81 |
$30,000.00 |
$12,500.00 |
| 11 | 506-6041 |
BIODEG EROSN CONT LOGS (INSTL) (12") | 200 | LF |
$4.50 |
$7.08 |
$10.00 |
$6.50 |
| 12 | 506-6043 |
BIODEG EROSN CONT LOGS (REMOVE) | 200 | LF |
$2.00 |
$2.36 |
$2.00 |
$2.30 |
| 13 | 533-6001 |
RUMBLE STRIPS (SHOULDER) | 15,305 | LF |
$0.2200 |
$0.3400 |
$0.5500 |
$0.5000 |
| 14 | 533-6002 |
RUMBLE STRIPS (CENTERLINE) | 17,050 | LF |
$0.2200 |
$0.3400 |
$0.2500 |
$0.5000 |
| 15 | 540-6001 |
MTL W-BEAM GD FEN (TIM POST) | 250 | LF |
$30.00 |
$53.10 |
$29.75 |
$31.00 |
| 16 | 540-6021 |
MTL THRIE-BEAM GD FEN (TIM POST) | 4 | EA |
$2,178.00 |
$2,360.00 |
$2,600.00 |
$1,700.00 |
| 17 | 540-6037 |
MTL BM GD FEN TRANS (ANCHOR PLATE) | 2 | EA |
$750.00 |
$1,829.00 |
$1,200.00 |
$1,100.00 |
| 18 | 542-6001 |
REMOVE METAL BEAM GUARD FENCE | 200 | LF |
$6.00 |
$5.90 |
$6.20 |
$8.00 |
| 19 | 542-6002 |
REMOVE TERMINAL ANCHOR SECTION | 4 | EA |
$275.00 |
$590.00 |
$460.00 |
$340.00 |
| 20 | 542-6004 |
RM MTL BM GD FENCE TRANS (THRIE-BEAM) | 4 | EA |
$485.00 |
$590.00 |
$460.00 |
$340.00 |
| 21 | 544-6001 |
GUARDRAIL END TREATMENT (INSTALL) | 4 | EA |
$2,850.00 |
$4,720.00 |
$4,000.00 |
$3,200.00 |
| 22 | 644-6001 |
IN SM RD SN SUP&AM TY10BWG(1)SA(P) | 2 | EA |
$582.50 |
$2,950.00 |
$770.00 |
$2,000.00 |
| 23 | 644-6060 |
IN SM RD SN SUP&AM TYTWT(1)WS(P) | 1 | EA |
$350.00 |
$2,950.00 |
$670.00 |
$2,000.00 |
| 24 | 644-6076 |
REMOVE SM RD SN SUP&AM | 1 | EA |
$183.00 |
$236.00 |
$120.00 |
$500.00 |
| 25 | 658-6062 |
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI) | 12 | EA |
$50.00 |
$33.00 |
$31.00 |
$45.00 |
| 26 | 662-6110 |
WK ZN PAV MRK SHT TERM (TAB)TY Y | 921 | EA |
$2.00 |
$1.20 |
$5.00 |
$0.7500 |
| 27 | 666-6093 |
REFL PAV MRK TY I (W)(RR XING)(100MIL) | 1 | EA |
$660.00 |
$710.36 |
$740.00 |
$650.00 |
| 28 | 666-6309 |
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL) | 31,662 | LF |
$0.7200 |
$0.7900 |
$0.8500 |
$0.7000 |
| 29 | 666-6318 |
RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL) | 3,346 | LF |
$0.7200 |
$0.8900 |
$0.9500 |
$0.7500 |
| 30 | 666-6321 |
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL) | 11,200 | LF |
$0.7200 |
$0.7900 |
$0.8500 |
$0.7000 |
| 31 | 668-6076 |
PREFAB PAV MRK TY C (W) (24") (SLD) | 108 | LF |
$13.00 |
$16.82 |
$17.50 |
$15.00 |
| 32 | 668-6085 |
PREFAB PAV MRK TY C (W) (WORD) | 1 | EA |
$45.00 |
$398.84 |
$420.00 |
$390.00 |
| 33 | 672-6009 |
REFL PAV MRKR TY II-A-A | 378 | EA |
$4.00 |
$5.55 |
$5.80 |
$6.00 |
| 34 | 3077-6058 |
SP MIXES SP-D SAC-A PG70-28 | 9,124 | TON |
$140.00 |
$129.10 |
$175.00 |
$165.00 |
| 35 | 3084-6001 |
BONDING COURSE | 4,946 | GAL |
$3.65 |
$5.65 |
$1.00 |
$7.00 |
| 36 | 6185-6002 |
TMA (STATIONARY) | 60 | DAY |
$330.00 |
$275.00 |
$150.00 |
$200.00 |
| 37 | 6185-6005 |
TMA (MOBILE OPERATION) | 12 | DAY |
$541.00 |
$1.00 |
$150.00 |
$200.00 |