| 1 | 104-7006 |
REMOV CONC (RIPRAP) | 3 | SY |
$30.00 |
$225.00 |
$154.69 |
$500.00 |
$25.00 |
$250.00 |
| 2 | 104-7011 |
REMOV CONC (DRIVEWAYS) | 1,478 | SY |
$30.00 |
$15.00 |
$11.60 |
$35.00 |
$25.00 |
$40.00 |
| 3 | 110-7001 |
EXCAV (ROADWAY) | 16,872 | CY |
$15.00 |
$12.75 |
$10.96 |
$22.00 |
$25.00 |
$16.00 |
| 4 | 132-7002 |
EMBANK (FNL)(DC)(TY A) | 7,624 | CY |
$20.00 |
$14.00 |
$4.40 |
$15.00 |
$25.00 |
$22.00 |
| 5 | 164-7034 |
BROADCAST SEED (PERM_RURAL_CLAY) | 14.2 | AC |
$1,800.00 |
$1,000.00 |
$806.70 |
$725.00 |
$1,500.00 |
$790.00 |
| 6 | 168-7001 |
VEGETATIVE WATERING | 919 | TGL |
$10.00 |
$50.00 |
$47.85 |
$25.00 |
$42.00 |
$40.00 |
| 7 | 247-7176 |
FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS) | 6,298 | CY |
$76.00 |
$62.00 |
$70.14 |
$80.00 |
$90.00 |
$70.00 |
| 8 | 310-7004 |
PRIME COAT (MC-30) | 5,038 | GAL |
$5.00 |
$7.00 |
$5.88 |
$8.00 |
$10.00 |
$8.00 |
| 9 | 344-7021 |
SP MIXES SP-C SAC-B PG70-22 | 18,991 | TON |
$120.00 |
$120.96 |
$142.78 |
$128.00 |
$140.00 |
$150.00 |
| 10 | 344-7077 |
TACK COAT | 19,075 | GAL |
$3.50 |
$5.00 |
$2.32 |
$5.00 |
$6.00 |
$5.00 |
| 11 | 354-7032 |
PLANE ASPH CONC PAV(0" TO 2") | 15,806 | SY |
$3.00 |
$2.25 |
$5.23 |
$3.00 |
$2.00 |
$7.00 |
| 12 | 354-7033 |
PLANE ASPH CONC PAV(0" TO 3") | 3,967 | SY |
$3.00 |
$3.75 |
$4.21 |
$3.00 |
$2.00 |
$7.00 |
| 13 | 354-7052 |
PLANE ASPH CONC PAV(3") | 3,890 | SY |
|
$3.75 |
$4.05 |
$3.00 |
$2.00 |
$7.00 |
| 14 | 400-7006 |
CUT & RESTORING PAV | 60 | SY |
|
$195.00 |
$74.72 |
$125.00 |
$200.00 |
$100.00 |
| 15 | 401-7001 |
FLOWABLE BACKFILL | 27 | CY |
|
$280.00 |
$335.08 |
$225.00 |
$600.00 |
$320.00 |
| 16 | 402-7001 |
TRENCH EXCAVATION PROTECTION | 80 | LF |
|
$120.00 |
$1.34 |
$50.00 |
$50.00 |
$55.00 |
| 17 | 420-7009 |
CL A CONC (PLUG) | 2 | EA |
|
$4,500.00 |
$680.81 |
$5,000.00 |
$3,000.00 |
$2,600.00 |
| 18 | 420-7011 |
CL B CONC (MISC) | 32 | CY |
|
$650.00 |
$340.54 |
$500.00 |
$800.00 |
$1,100.00 |
| 19 | 432-7002 |
RIPRAP (CONC)(5 IN) | 123 | CY |
$250.00 |
$775.00 |
$1,706.95 |
$625.00 |
$700.00 |
$900.00 |
| 20 | 432-7013 |
RIPRAP (MOW STRIP)(4 IN) | 194 | CY |
|
$725.00 |
$641.09 |
$650.00 |
$700.00 |
$900.00 |
| 21 | 432-7043 |
RIPRAP (STONE PROTECTION)(18 IN) | 198 | CY |
|
$200.00 |
$595.77 |
$225.00 |
$500.00 |
$275.00 |
| 22 | 451-7049 |
RETROFIT RAIL (TY T131RC) | 562 | LF |
|
$260.00 |
$251.09 |
$275.00 |
$185.00 |
$205.00 |
| 23 | 460-7019 |
CMP AR (GAL STL DES 4) | 16 | LF |
$475.00 |
$210.00 |
$184.22 |
$325.00 |
$500.00 |
$265.00 |
| 24 | 464-7005 |
RC PIPE (CL III)(24 IN) | 1,608 | LF |
$130.00 |
$135.00 |
$100.28 |
$125.00 |
$135.00 |
$125.00 |
| 25 | 464-7007 |
RC PIPE (CL III)(30 IN) | 1,002 | LF |
$120.00 |
$195.00 |
$114.14 |
$150.00 |
$170.00 |
$170.00 |
| 26 | 467-7326 |
SET (TY II) (24 IN) (RCP) (4: 1) (C) | 2 | EA |
|
$2,200.00 |
$1,319.59 |
$5,500.00 |
$2,500.00 |
$2,200.00 |
| 27 | 467-7328 |
SET (TY II) (24 IN) (RCP) (6: 1) (P) | 50 | EA |
$2,677.00 |
$2,650.00 |
$1,575.89 |
$3,000.00 |
$2,750.00 |
$2,300.00 |
| 28 | 467-7346 |
SET (TY II) (30 IN) (RCP) (4: 1) (C) | 2 | EA |
|
$5,550.00 |
$1,824.14 |
$5,500.00 |
$3,000.00 |
$2,500.00 |
| 29 | 467-7348 |
SET (TY II) (30 IN) (RCP) (6: 1) (P) | 34 | EA |
$4,000.00 |
$6,200.00 |
$3,749.64 |
$3,500.00 |
$3,500.00 |
$4,300.00 |
| 30 | 467-7436 |
SET (TY II) (DES 4) (CMP) (4: 1) (C) | 2 | EA |
$4,000.00 |
$2,700.00 |
$4,103.49 |
$6,000.00 |
$5,500.00 |
$3,000.00 |
| 31 | 476-7012 |
JACK BOR OR TUN PIPE(30 IN)(RC)(CL III) | 132 | LF |
|
$2,830.00 |
$1,589.21 |
$2,000.00 |
$2,000.00 |
$2,200.00 |
| 32 | 496-7004 |
REMOV STR (SET) | 30 | EA |
$1,065.00 |
$600.00 |
$414.52 |
$1,500.00 |
$1,100.00 |
$530.00 |
| 33 | 496-7007 |
REMOV STR (PIPE) | 750 | LF |
$50.00 |
$15.00 |
$13.80 |
$50.00 |
$50.00 |
$25.00 |
| 34 | 500-7001 |
MOBILIZATION | 1 | LS |
$545,000.00 |
$285,000.00 |
$421,212.77 |
$650,000.00 |
$770,000.00 |
$750,000.00 |
| 35 | 502-7001 |
BARRICADES, SIGNS AND TRAFFIC HANDLING | 13 | MO |
$15,000.00 |
$10,000.00 |
$3,642.18 |
$20,000.00 |
$21,000.00 |
$29,800.00 |
| 36 | 503-7002 |
PORTABLE CHANGEABLE MESSAGE SIGN | 2 | EA |
|
$8,500.00 |
$7,346.98 |
$12,000.00 |
$18,500.00 |
$20,000.00 |
| 37 | 505-7001 |
TMA (STATIONARY) | 234 | DAY |
$280.00 |
$275.00 |
$39.32 |
$350.00 |
$470.00 |
$250.00 |
| 38 | 505-7003 |
TMA (MOBILE OPERATION) | 28 | DAY |
$500.00 |
$275.00 |
$609.87 |
$100.00 |
$470.00 |
$400.00 |
| 39 | 506-7004 |
ROCK FILTER DAMS (INSTALL) (TY 4) | 20 | LF |
|
$125.00 |
$153.45 |
$95.00 |
$95.00 |
$125.00 |
| 40 | 506-7011 |
ROCK FILTER DAMS (REMOVE) | 20 | LF |
|
$50.00 |
$55.17 |
$25.00 |
$55.00 |
$36.00 |
| 41 | 506-7039 |
TEMP SEDMT CONT FENCE (INSTALL) | 4,025 | LF |
$6.50 |
$5.00 |
$5.08 |
$7.00 |
$5.00 |
$4.50 |
| 42 | 506-7041 |
TEMP SEDMT CONT FENCE (REMOVE) | 4,025 | LF |
$2.00 |
$1.50 |
$0.5300 |
$2.00 |
$1.50 |
$1.00 |
| 43 | 506-7044 |
BIODEG EROSN CONT LOGS (INSTL) (12") | 960 | LF |
$10.00 |
$7.50 |
$6.14 |
$10.00 |
$7.00 |
$6.00 |
| 44 | 506-7046 |
BIODEG EROSN CONT LOGS (REMOVE) | 960 | LF |
$2.80 |
$2.00 |
$1.60 |
$2.00 |
$1.00 |
$1.00 |
| 45 | 512-7001 |
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1) | 1,080 | LF |
|
$120.00 |
$116.64 |
$115.00 |
$80.00 |
$95.00 |
| 46 | 512-7025 |
PORT CTB (MOVE)(SGL SLP)(TY 1) | 1,080 | LF |
|
$18.00 |
$4.32 |
$10.00 |
$10.00 |
$40.00 |
| 47 | 512-7037 |
PORT CTB (STKPL)(SGL SLP)(TY 1) | 1,080 | LF |
|
$25.00 |
$15.82 |
$20.00 |
$20.00 |
$40.00 |
| 48 | 530-7001 |
INTERSECTIONS (CONC) | 1,101 | SY |
$125.00 |
$167.00 |
$137.23 |
$80.00 |
$150.00 |
$215.00 |
| 49 | 530-7002 |
INTERSECTIONS (ACP) | 134 | SY |
$30.00 |
$45.00 |
$113.79 |
$25.00 |
$50.00 |
$100.00 |
| 50 | 530-7006 |
DRIVEWAYS (CONC) | 263 | SY |
$100.00 |
$167.00 |
$153.45 |
$120.00 |
$150.00 |
$190.00 |
| 51 | 530-7015 |
DRIVEWAYS (BASE) | 5,505 | SY |
$25.00 |
$15.00 |
$33.44 |
$25.00 |
$40.00 |
$40.00 |
| 52 | 533-7001 |
MILL RUMBLE STRIPS (ASPHALT) (SHLDR) | 34,111 | LF |
$0.2500 |
$0.2500 |
$0.2400 |
$0.2500 |
$0.6000 |
$0.5600 |
| 53 | 533-7002 |
MILL RUMBLE STRIPS (ASPH) (CENTERLINE) | 1,075 | LF |
|
$0.2800 |
$0.2700 |
$0.2500 |
$0.6000 |
$0.5600 |
| 54 | 540-7001 |
MTL W-BEAM GD FEN (TIM POST) | 1,487.5 | LF |
|
$31.00 |
$29.38 |
$30.00 |
$24.00 |
$30.00 |
| 55 | 540-7005 |
MTL BEAM GD FEN TRANS (THRIE-BEAM) | 4 | EA |
|
$4,760.00 |
$4,541.04 |
$5,000.00 |
$1,900.00 |
$1,600.00 |
| 56 | 542-7001 |
REMOVE METAL BEAM GUARD FENCE | 2,200 | LF |
|
$2.20 |
$2.14 |
$2.00 |
$3.50 |
$3.50 |
| 57 | 544-7001 |
GUARDRAIL END TREATMENT (INSTALL) | 10 | EA |
|
$3,920.00 |
$3,739.68 |
$4,000.00 |
$3,100.00 |
$3,000.00 |
| 58 | 544-7003 |
GUARDRAIL END TREATMENT (REMOVE) | 10 | EA |
|
$28.00 |
$26.71 |
$25.00 |
$275.00 |
$600.00 |
| 59 | 545-7002 |
CRASH CUSH ATTEN (MOVE & RESET) | 1 | EA |
|
$2,250.00 |
$1,705.33 |
$2,000.00 |
$825.00 |
$1,000.00 |
| 60 | 545-7003 |
CRASH CUSH ATTEN (STKPL) | 1 | EA |
|
$1,700.00 |
$1,705.33 |
$1,500.00 |
$825.00 |
$1,000.00 |
| 61 | 545-7014 |
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3) | 1 | EA |
|
$13,500.00 |
$2,945.33 |
$15,000.00 |
$5,825.00 |
$9,000.00 |
| 62 | 560-7002 |
MAILBOX INSTALL-S (TWG-POST) TY 2 | 37 | EA |
$350.00 |
$320.00 |
$270.33 |
$250.00 |
$250.00 |
$260.00 |
| 63 | 644-7001 |
IN SM RD SN SUP&AM TY10BWG(1)SA(P) | 30 | EA |
$800.00 |
$745.00 |
$709.47 |
$1,000.00 |
$950.00 |
$1,000.00 |
| 64 | 644-7004 |
IN SM RD SN SUP&AM TY10BWG(1)SA(T) | 7 | EA |
$975.00 |
$940.00 |
$895.39 |
$1,000.00 |
$950.00 |
$1,000.00 |
| 65 | 644-7028 |
IN SM RD SN SUP&AM TYS80(1)SA(T) | 1 | EA |
|
$1,100.00 |
$958.43 |
$1,000.00 |
$950.00 |
$1,000.00 |
| 66 | 644-7035 |
IN SM RD SN SUP&AM TYS80(1)SA(U-WC) | 1 | EA |
|
$1,300.00 |
$1,233.03 |
$1,000.00 |
$950.00 |
$1,000.00 |
| 67 | 644-7073 |
REMOVE SM RD SN SUP&AM | 30 | EA |
$115.00 |
$110.00 |
$93.00 |
$100.00 |
$100.00 |
$110.00 |
| 68 | 658-7009 |
INSTL DEL ASSM (D-SW)SZ 2(WC)GND | 58 | EA |
$55.00 |
$55.00 |
$48.08 |
$80.00 |
$80.00 |
$85.00 |
| 69 | 658-7019 |
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI) | 33 | EA |
|
$51.00 |
$48.08 |
$80.00 |
$40.00 |
$45.00 |
| 70 | 658-7056 |
INSTL OM ASSM (OM-2Y)(WC)GND | 4 | EA |
$150.00 |
$61.00 |
$57.70 |
$80.00 |
$80.00 |
$85.00 |
| 71 | 662-7082 |
WK ZN PAV MRK REMOV (W)(ARROW) | 4 | EA |
|
$200.00 |
$160.27 |
$175.00 |
$75.00 |
$80.00 |
| 72 | 662-7100 |
WK ZN PAV MRK REMOV (Y)6"(SLD) | 56,174 | LF |
$1.00 |
$0.2000 |
$0.6200 |
$0.2500 |
$0.5000 |
$0.5500 |
| 73 | 662-7114 |
WK ZN PAV MRK SHT TERM (TAB)TY Y-2 | 2,395 | EA |
$2.00 |
$2.25 |
$2.52 |
$1.00 |
$1.00 |
$0.7500 |
| 74 | 666-7024 |
REFL PAV MRK TY I (W)8"(SLD)(100MIL) | 952 | LF |
|
$1.35 |
$1.60 |
$1.25 |
$0.9500 |
$1.00 |
| 75 | 666-7411 |
REFL PAV MRK TY I (W)6"(SLD)(100MIL) | 34,507 | LF |
$1.30 |
$0.5700 |
$0.5900 |
$0.5000 |
$0.6000 |
$0.6400 |
| 76 | 666-7420 |
REFL PAV MRK TY I (Y)6"(BRK)(100MIL) | 6,909 | LF |
$1.30 |
$0.5700 |
$0.6000 |
$0.5000 |
$0.6100 |
$0.6500 |
| 77 | 666-7423 |
REFL PAV MRK TY I (Y)6"(SLD)(100MIL) | 36,579 | LF |
$1.30 |
$0.5700 |
$0.5900 |
$0.5000 |
$0.6000 |
$0.6400 |
| 78 | 668-7089 |
PREFAB PM TY C (W)(24")(SLD) | 178 | LF |
$25.00 |
$22.50 |
$15.39 |
$20.00 |
$17.50 |
$19.00 |
| 79 | 668-7091 |
PREFAB PM TY C (W)(ARROW) | 52 | EA |
$270.00 |
$255.00 |
$229.72 |
$225.00 |
$200.00 |
$220.00 |
| 80 | 668-7103 |
PREFAB PM TY C (W)(WORD) | 4 | EA |
|
$255.00 |
$459.45 |
$225.00 |
$240.00 |
$250.00 |
| 81 | 672-7002 |
REFL PAV MRKR TY I-C | 37 | EA |
|
$5.65 |
$8.55 |
$5.00 |
$5.50 |
$6.00 |
| 82 | 672-7004 |
REFL PAV MRKR TY II-A-A | 1,027 | EA |
$7.00 |
$5.65 |
$6.14 |
$5.00 |
$5.50 |
$6.00 |
| 83 | 677-7001 |
ELIM EXT PM & MRKS (4") | 34,612 | LF |
$1.00 |
$0.3000 |
$0.3700 |
$0.2500 |
$0.6400 |
$0.6500 |
| 84 | 677-7008 |
ELIM EXT PM & MRKS (24") | 640 | LF |
|
$3.40 |
$3.21 |
$3.00 |
$4.00 |
$4.50 |
| 85 | 677-7009 |
ELIM EXT PM & MRKS (ARROW) | 6 | EA |
|
$115.00 |
$106.85 |
$100.00 |
$80.00 |
$85.00 |
| 86 | 677-7011 |
ELIM EXT PM & MRKS (TPL ARROW) | 3 | EA |
|
$1,650.00 |
$106.85 |
$125.00 |
$80.00 |
$85.00 |
| 87 | 760-7001 |
DITCH CLEANING AND RESHAPING (FOOT) | 123 | LF |
|
$40.00 |
$4.76 |
$40.00 |
$100.00 |
$75.00 |
| 2 | 104-7011 |
REMOV CONC (DRIVEWAYS) | 661 | SY |
$30.00 |
|
|
|
|
|
| 3 | 110-7001 |
EXCAV (ROADWAY) | 5,827 | CY |
$15.00 |
|
|
|
|
|
| 4 | 132-7002 |
EMBANK (FNL)(DC)(TY A) | 6,230 | CY |
$20.00 |
|
|
|
|
|
| 5 | 164-7034 |
BROADCAST SEED (PERM_RURAL_CLAY) | 4.9 | AC |
$1,800.00 |
|
|
|
|
|
| 6 | 168-7001 |
VEGETATIVE WATERING | 544 | TGL |
$10.00 |
|
|
|
|
|
| 7 | 247-7176 |
FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS) | 3,470 | CY |
$76.00 |
|
|
|
|
|
| 8 | 310-7004 |
PRIME COAT (MC-30) | 2,776 | GAL |
$5.00 |
|
|
|
|
|
| 9 | 344-7021 |
SP MIXES SP-C SAC-B PG70-22 | 11,383 | TON |
$120.00 |
|
|
|
|
|
| 10 | 344-7077 |
TACK COAT | 11,658 | GAL |
$3.50 |
|
|
|
|
|
| 11 | 354-7032 |
PLANE ASPH CONC PAV(0" TO 2") | 14,853 | SY |
$3.00 |
|
|
|
|
|
| 12 | 354-7033 |
PLANE ASPH CONC PAV(0" TO 3") | 2,667 | SY |
$3.00 |
|
|
|
|
|
| 13 | 354-7052 |
PLANE ASPH CONC PAV(3") | 3,890 | SY |
$3.00 |
|
|
|
|
|
| 14 | 400-7006 |
CUT & RESTORING PAV | 60 | SY |
$150.00 |
|
|
|
|
|
| 15 | 401-7001 |
FLOWABLE BACKFILL | 27 | CY |
$450.00 |
|
|
|
|
|
| 16 | 402-7001 |
TRENCH EXCAVATION PROTECTION | 80 | LF |
$5.00 |
|
|
|
|
|
| 17 | 420-7009 |
CL A CONC (PLUG) | 2 | EA |
$2,000.00 |
|
|
|
|
|
| 18 | 420-7011 |
CL B CONC (MISC) | 32 | CY |
$900.00 |
|
|
|
|
|
| 19 | 432-7002 |
RIPRAP (CONC)(5 IN) | 105 | CY |
$250.00 |
|
|
|
|
|
| 20 | 432-7013 |
RIPRAP (MOW STRIP)(4 IN) | 194 | CY |
$200.00 |
|
|
|
|
|
| 21 | 432-7043 |
RIPRAP (STONE PROTECTION)(18 IN) | 198 | CY |
$250.00 |
|
|
|
|
|
| 22 | 451-7049 |
RETROFIT RAIL (TY T131RC) | 286 | LF |
$50.00 |
|
|
|
|
|
| 24 | 464-7005 |
RC PIPE (CL III)(24 IN) | 180 | LF |
$130.00 |
|
|
|
|
|
| 26 | 467-7326 |
SET (TY II) (24 IN) (RCP) (4: 1) (C) | 2 | EA |
$9,000.00 |
|
|
|
|
|
| 27 | 467-7328 |
SET (TY II) (24 IN) (RCP) (6: 1) (P) | 4 | EA |
$2,677.00 |
|
|
|
|
|
| 28 | 467-7346 |
SET (TY II) (30 IN) (RCP) (4: 1) (C) | 2 | EA |
$11,000.00 |
|
|
|
|
|
| 31 | 476-7012 |
JACK BOR OR TUN PIPE(30 IN)(RC)(CL III) | 132 | LF |
$1,700.00 |
|
|
|
|
|
| 33 | 496-7007 |
REMOV STR (PIPE) | 122 | LF |
$50.00 |
|
|
|
|
|
| 36 | 503-7002 |
PORTABLE CHANGEABLE MESSAGE SIGN | 2 | EA |
$10,000.00 |
|
|
|
|
|
| 38 | 505-7003 |
TMA (MOBILE OPERATION) | 18 | DAY |
$500.00 |
|
|
|
|
|
| 39 | 506-7004 |
ROCK FILTER DAMS (INSTALL) (TY 4) | 20 | LF |
$100.00 |
|
|
|
|
|
| 40 | 506-7011 |
ROCK FILTER DAMS (REMOVE) | 20 | LF |
$15.00 |
|
|
|
|
|
| 41 | 506-7039 |
TEMP SEDMT CONT FENCE (INSTALL) | 2,275 | LF |
$6.50 |
|
|
|
|
|
| 42 | 506-7041 |
TEMP SEDMT CONT FENCE (REMOVE) | 2,275 | LF |
$2.00 |
|
|
|
|
|
| 43 | 506-7044 |
BIODEG EROSN CONT LOGS (INSTL) (12") | 200 | LF |
$10.00 |
|
|
|
|
|
| 44 | 506-7046 |
BIODEG EROSN CONT LOGS (REMOVE) | 200 | LF |
$2.80 |
|
|
|
|
|
| 45 | 512-7001 |
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1) | 1,080 | LF |
$40.00 |
|
|
|
|
|
| 46 | 512-7025 |
PORT CTB (MOVE)(SGL SLP)(TY 1) | 1,080 | LF |
$15.00 |
|
|
|
|
|
| 47 | 512-7037 |
PORT CTB (STKPL)(SGL SLP)(TY 1) | 1,080 | LF |
$15.00 |
|
|
|
|
|
| 48 | 530-7001 |
INTERSECTIONS (CONC) | 544 | SY |
$125.00 |
|
|
|
|
|
| 50 | 530-7006 |
DRIVEWAYS (CONC) | 106 | SY |
$100.00 |
|
|
|
|
|
| 51 | 530-7015 |
DRIVEWAYS (BASE) | 2,719 | SY |
$25.00 |
|
|
|
|
|
| 52 | 533-7001 |
MILL RUMBLE STRIPS (ASPHALT) (SHLDR) | 21,061 | LF |
$0.2500 |
|
|
|
|
|
| 53 | 533-7002 |
MILL RUMBLE STRIPS (ASPH) (CENTERLINE) | 1,075 | LF |
$0.2500 |
|
|
|
|
|
| 54 | 540-7001 |
MTL W-BEAM GD FEN (TIM POST) | 1,487.5 | LF |
$35.00 |
|
|
|
|
|
| 55 | 540-7005 |
MTL BEAM GD FEN TRANS (THRIE-BEAM) | 4 | EA |
$3,500.00 |
|
|
|
|
|
| 56 | 542-7001 |
REMOVE METAL BEAM GUARD FENCE | 2,200 | LF |
$3.50 |
|
|
|
|
|
| 57 | 544-7001 |
GUARDRAIL END TREATMENT (INSTALL) | 10 | EA |
$3,500.00 |
|
|
|
|
|
| 58 | 544-7003 |
GUARDRAIL END TREATMENT (REMOVE) | 10 | EA |
$250.00 |
|
|
|
|
|
| 59 | 545-7002 |
CRASH CUSH ATTEN (MOVE & RESET) | 1 | EA |
$1,500.00 |
|
|
|
|
|
| 60 | 545-7003 |
CRASH CUSH ATTEN (STKPL) | 1 | EA |
$500.00 |
|
|
|
|
|
| 61 | 545-7014 |
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3) | 1 | EA |
$6,500.00 |
|
|
|
|
|
| 62 | 560-7002 |
MAILBOX INSTALL-S (TWG-POST) TY 2 | 14 | EA |
$350.00 |
|
|
|
|
|
| 63 | 644-7001 |
IN SM RD SN SUP&AM TY10BWG(1)SA(P) | 20 | EA |
$800.00 |
|
|
|
|
|
| 64 | 644-7004 |
IN SM RD SN SUP&AM TY10BWG(1)SA(T) | 3 | EA |
$975.00 |
|
|
|
|
|
| 65 | 644-7028 |
IN SM RD SN SUP&AM TYS80(1)SA(T) | 1 | EA |
$1,000.00 |
|
|
|
|
|
| 66 | 644-7035 |
IN SM RD SN SUP&AM TYS80(1)SA(U-WC) | 1 | EA |
$1,025.00 |
|
|
|
|
|
| 67 | 644-7073 |
REMOVE SM RD SN SUP&AM | 19 | EA |
$115.00 |
|
|
|
|
|
| 69 | 658-7019 |
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI) | 33 | EA |
$55.00 |
|
|
|
|
|
| 70 | 658-7056 |
INSTL OM ASSM (OM-2Y)(WC)GND | 2 | EA |
$150.00 |
|
|
|
|
|
| 71 | 662-7082 |
WK ZN PAV MRK REMOV (W)(ARROW) | 4 | EA |
$200.00 |
|
|
|
|
|
| 72 | 662-7100 |
WK ZN PAV MRK REMOV (Y)6"(SLD) | 43,124 | LF |
$1.00 |
|
|
|
|
|
| 73 | 662-7114 |
WK ZN PAV MRK SHT TERM (TAB)TY Y-2 | 1,090 | EA |
$2.00 |
|
|
|
|
|
| 74 | 666-7024 |
REFL PAV MRK TY I (W)8"(SLD)(100MIL) | 952 | LF |
$1.30 |
|
|
|
|
|
| 75 | 666-7411 |
REFL PAV MRK TY I (W)6"(SLD)(100MIL) | 21,457 | LF |
$1.30 |
|
|
|
|
|
| 76 | 666-7420 |
REFL PAV MRK TY I (Y)6"(BRK)(100MIL) | 4,270 | LF |
$1.30 |
|
|
|
|
|
| 77 | 666-7423 |
REFL PAV MRK TY I (Y)6"(SLD)(100MIL) | 22,214 | LF |
$1.30 |
|
|
|
|
|
| 78 | 668-7089 |
PREFAB PM TY C (W)(24")(SLD) | 106 | LF |
$25.00 |
|
|
|
|
|
| 79 | 668-7091 |
PREFAB PM TY C (W)(ARROW) | 32 | EA |
$270.00 |
|
|
|
|
|
| 80 | 668-7103 |
PREFAB PM TY C (W)(WORD) | 4 | EA |
$350.00 |
|
|
|
|
|
| 81 | 672-7002 |
REFL PAV MRKR TY I-C | 37 | EA |
$6.00 |
|
|
|
|
|
| 82 | 672-7004 |
REFL PAV MRKR TY II-A-A | 566 | EA |
$7.00 |
|
|
|
|
|
| 83 | 677-7001 |
ELIM EXT PM & MRKS (4") | 21,562 | LF |
$1.00 |
|
|
|
|
|
| 84 | 677-7008 |
ELIM EXT PM & MRKS (24") | 640 | LF |
$5.00 |
|
|
|
|
|
| 85 | 677-7009 |
ELIM EXT PM & MRKS (ARROW) | 6 | EA |
$85.00 |
|
|
|
|
|
| 86 | 677-7011 |
ELIM EXT PM & MRKS (TPL ARROW) | 3 | EA |
$85.00 |
|
|
|
|
|
| 87 | 760-7001 |
DITCH CLEANING AND RESHAPING (FOOT) | 123 | LF |
$10.00 |
|
|
|
|
|