| 1 | 316-6001 |
ASPH (MULTI OPTION) | 18,358 | GAL |
$5.00 |
$3.14 |
$3.16 |
$3.85 |
| 2 | 316-6175 |
AGGR(TY-B GR-4 SAC-B) | 348 | CY |
$110.00 |
$209.59 |
$129.76 |
$160.00 |
| 3 | 344-6120 |
SUPERPAVE MIXTURES SP-D SAC-B PG70-22 | 4,390 | TON |
$100.00 |
$99.50 |
$106.56 |
$110.00 |
| 4 | 351-6004 |
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8") | 4,915 | SY |
$50.00 |
$68.13 |
$66.00 |
$65.00 |
| 5 | 354-6045 |
PLANE ASPH CONC PAV (2") | 39,907 | SY |
$1.50 |
$1.77 |
$1.77 |
$1.95 |
| 6 | 500-6001 |
MOBILIZATION | 1 | LS |
$98,210.84 |
$89,279.60 |
$89,176.35 |
$130,000.00 |
| 7 | 502-6001 |
BARRICADES, SIGNS AND TRAFFIC HANDLING | 3 | MO |
$10,000.00 |
$14,897.50 |
$6,709.14 |
$10,000.00 |
| 8 | 506-6040 |
BIODEG EROSN CONT LOGS (INSTL) (8") | 440 | LF |
$5.00 |
$4.29 |
$5.12 |
$5.00 |
| 9 | 506-6043 |
BIODEG EROSN CONT LOGS (REMOVE) | 440 | LF |
$2.00 |
$0.5400 |
$2.10 |
$1.00 |
| 10 | 530-6005 |
DRIVEWAYS (ACP) | 5,497 | SY |
$30.00 |
$22.27 |
$39.05 |
$23.50 |
| 11 | 662-6095 |
WK ZN PAV MRK REMOV (Y)4"(SLD) | 17,290 | LF |
$1.00 |
$1.01 |
$0.8900 |
$1.05 |
| 12 | 662-6110 |
WK ZN PAV MRK SHT TERM (TAB)TY Y | 221 | EA |
$2.00 |
$4.34 |
$5.17 |
$10.00 |
| 13 | 666-6048 |
REFL PAV MRK TY I (W)24"(SLD)(100MIL) | 798 | LF |
$13.00 |
$8.91 |
$7.86 |
$9.20 |
| 14 | 666-6303 |
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL) | 9,281 | LF |
$0.4000 |
$0.5500 |
$0.5400 |
$0.5700 |
| 15 | 666-6315 |
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL) | 17,290 | LF |
$0.4000 |
$0.5500 |
$0.5400 |
$0.5700 |
| 16 | 672-6009 |
REFL PAV MRKR TY II-A-A | 221 | EA |
$3.50 |
$6.38 |
$7.25 |
$6.60 |
| 17 | 6185-6002 |
TMA (STATIONARY) | 60 | DAY |
$185.00 |
$302.15 |
$1.21 |
$228.00 |
| 18 | 6185-6003 |
TMA (MOBILE OPERATION) | 24 | HR |
$50.00 |
$25.00 |
$1.21 |
$114.00 |