| 1 | 110-6001 |
EXCAVATION (ROADWAY) | 6,392 | CY |
$20.00 |
$30.00 |
$26.00 |
$28.70 |
| 2 | 110-6002 |
EXCAVATION (CHANNEL) | 36 | CY |
$50.00 |
$100.00 |
$54.50 |
$250.00 |
| 3 | 132-6004 |
EMBANKMENT (FINAL)(DENS CONT)(TY B) | 6,491 | CY |
$38.00 |
$65.00 |
$51.00 |
$62.70 |
| 4 | 134-6004 |
BACKFILL (TY A OR B) | 10 | STA |
$445.00 |
$550.00 |
$485.00 |
$750.00 |
| 5 | 164-6009 |
BROADCAST SEED (TEMP) (WARM) | 57,501 | SY |
$0.1200 |
$0.1200 |
$0.1300 |
$0.1400 |
| 6 | 164-6011 |
BROADCAST SEED (TEMP) (COOL) | 57,501 | SY |
$0.1200 |
$0.1200 |
$0.1400 |
$0.1500 |
| 7 | 164-6033 |
DRILL SEEDING (PERM) (RURAL) (SANDY) | 115,000 | SY |
$0.1400 |
$0.1100 |
$0.1200 |
$0.1300 |
| 8 | 168-6001 |
VEGETATIVE WATERING | 924 | MG |
$30.00 |
$20.00 |
$27.00 |
$35.00 |
| 9 | 275-6001 |
CEMENT | 831 | TON |
$277.50 |
$290.00 |
$315.00 |
$354.00 |
| 10 | 275-6019 |
CEMENT TREAT (SUBGRADE)(6") | 76,467 | SY |
$5.00 |
$3.40 |
$5.40 |
$9.86 |
| 11 | 310-6009 |
PRIME COAT (MC-30) | 18,080 | GAL |
$5.00 |
$6.00 |
$5.15 |
$6.60 |
| 12 | 314-6010 |
EMULS ASPH (EROSN CONT)(SS-1) | 23,000 | GAL |
$4.50 |
$4.50 |
$4.05 |
$4.00 |
| 13 | 351-6004 |
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8") | 5,000 | SY |
$80.00 |
$75.00 |
$83.00 |
$80.00 |
| 14 | 354-6021 |
PLANE ASPH CONC PAV(0" TO 2") | 3,361 | SY |
$5.00 |
$7.00 |
$8.85 |
$7.50 |
| 15 | 354-6030 |
PLANE ASPH CONC PAV(0" TO 8") | 1,493 | SY |
$8.00 |
$10.00 |
$13.50 |
$12.00 |
| 16 | 432-6045 |
RIPRAP (MOW STRIP)(4 IN) | 64 | CY |
$700.00 |
$800.00 |
$925.00 |
$1,053.00 |
| 17 | 438-6006 |
CLEANING AND SEALING JOINTS (CL 3) | 200 | LF |
$54.00 |
$76.00 |
$48.00 |
$120.50 |
| 18 | 451-6019 |
RETROFIT RAIL (TY T631) | 212 | LF |
$120.00 |
$152.00 |
$160.00 |
$169.65 |
| 19 | 460-6002 |
CMP (GAL STL 18 IN) | 552 | LF |
$100.00 |
$94.00 |
$110.00 |
$87.75 |
| 20 | 467-6348 |
SET (TY II) (18 IN) (CMP) (6: 1) (P) | 32 | EA |
$1,700.00 |
$1,250.00 |
$1,600.00 |
$1,872.00 |
| 21 | 480-6001 |
CLEAN EXIST CULVERTS | 6 | EA |
$2,500.00 |
$1,650.00 |
$2,700.00 |
$5,000.00 |
| 22 | 496-6004 |
REMOV STR (SET) | 4 | EA |
$1,000.00 |
$650.00 |
$1,100.00 |
$351.00 |
| 23 | 496-6007 |
REMOV STR (PIPE) | 552 | LF |
$15.00 |
$30.00 |
$13.00 |
$15.25 |
| 24 | 500-6001 |
MOBILIZATION | 1 | LS |
$629,949.88 |
$590,000.00 |
$775,000.00 |
$705,335.00 |
| 25 | 502-6001 |
BARRICADES, SIGNS AND TRAFFIC HANDLING | 11 | MO |
$4,500.00 |
$10,500.00 |
$28,500.00 |
$24,979.50 |
| 26 | 506-6038 |
TEMP SEDMT CONT FENCE (INSTALL) | 3,100 | LF |
$3.50 |
$3.10 |
$3.25 |
$3.51 |
| 27 | 506-6039 |
TEMP SEDMT CONT FENCE (REMOVE) | 3,100 | LF |
$1.25 |
$0.9200 |
$0.9800 |
$1.05 |
| 28 | 506-6041 |
BIODEG EROSN CONT LOGS (INSTL) (12") | 5,400 | LF |
$4.75 |
$3.10 |
$3.25 |
$3.51 |
| 29 | 506-6043 |
BIODEG EROSN CONT LOGS (REMOVE) | 5,400 | LF |
$1.00 |
$0.8200 |
$0.8700 |
$1.00 |
| 30 | 530-6005 |
DRIVEWAYS (ACP) | 957 | SY |
$50.00 |
$69.00 |
$42.50 |
$94.15 |
| 31 | 530-6016 |
DRIVEWAYS (BASE) | 2,526 | SY |
$25.00 |
$25.00 |
$23.00 |
$40.00 |
| 32 | 533-6001 |
RUMBLE STRIPS (SHOULDER) | 69,400 | LF |
$0.1500 |
$0.2100 |
$0.1000 |
$0.2700 |
| 33 | 533-6002 |
RUMBLE STRIPS (CENTERLINE) | 34,700 | LF |
$0.3000 |
$0.3200 |
$0.1400 |
$0.2700 |
| 34 | 540-6001 |
MTL W-BEAM GD FEN (TIM POST) | 462.5 | LF |
$25.00 |
$29.00 |
$30.50 |
$32.76 |
| 35 | 540-6014 |
SHORT RADIUS | 25 | LF |
$55.33 |
$38.00 |
$38.50 |
$41.54 |
| 36 | 540-6015 |
DRIVEWAY TERMINAL ANCHOR SECTION | 1 | EA |
$1,093.67 |
$1,400.00 |
$1,400.00 |
$1,521.00 |
| 37 | 540-6020 |
MTL W - BEAM GD FEN (LOW FILL CULVERT) | 100 | LF |
$101.00 |
$75.00 |
$76.00 |
$81.90 |
| 38 | 540-6033 |
MTL BM GD FEN (LONG SPAN SYSTEM) | 2 | EA |
$1,200.00 |
$1,800.00 |
$1,800.00 |
$1,959.75 |
| 39 | 542-6001 |
REMOVE METAL BEAM GUARD FENCE | 411 | LF |
$5.00 |
$3.20 |
$3.25 |
$3.51 |
| 40 | 542-6002 |
REMOVE TERMINAL ANCHOR SECTION | 6 | EA |
$261.20 |
$320.00 |
$325.00 |
$351.00 |
| 41 | 544-6001 |
GUARDRAIL END TREATMENT (INSTALL) | 11 | EA |
$3,100.00 |
$3,500.00 |
$3,600.00 |
$3,890.25 |
| 42 | 560-6004 |
MAILBOX INSTALL-S (TWG-POST) TY 2 | 1 | EA |
$450.00 |
$290.00 |
$300.00 |
$409.50 |
| 43 | 644-6001 |
IN SM RD SN SUP&AM TY10BWG(1)SA(P) | 4 | EA |
$500.00 |
$690.00 |
$705.00 |
$965.25 |
| 44 | 644-6004 |
IN SM RD SN SUP&AM TY10BWG(1)SA(T) | 3 | EA |
$685.00 |
$750.00 |
$780.00 |
$1,140.75 |
| 45 | 644-6007 |
IN SM RD SN SUP&AM TY10BWG(1)SA(U) | 6 | EA |
$785.00 |
$890.00 |
$925.00 |
$1,316.25 |
| 46 | 644-6060 |
IN SM RD SN SUP&AM TYTWT(1)WS(P) | 36 | EA |
$350.00 |
$520.00 |
$535.00 |
$760.50 |
| 47 | 644-6076 |
REMOVE SM RD SN SUP&AM | 49 | EA |
$183.00 |
$110.00 |
$110.00 |
$117.00 |
| 48 | 658-6062 |
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI) | 27 | EA |
$50.83 |
$39.00 |
$40.50 |
$43.29 |
| 49 | 662-6110 |
WK ZN PAV MRK SHT TERM (TAB)TY Y | 1,726 | EA |
$2.00 |
$1.90 |
$1.55 |
$1.20 |
| 50 | 666-6309 |
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL) | 71,112 | LF |
$0.5000 |
$0.5500 |
$0.5700 |
$0.8100 |
| 51 | 666-6318 |
RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL) | 7,790 | LF |
$0.5000 |
$0.5500 |
$0.5700 |
$0.8100 |
| 52 | 666-6321 |
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL) | 23,439 | LF |
$0.5000 |
$0.5500 |
$0.5700 |
$0.8100 |
| 53 | 668-6076 |
PREFAB PAV MRK TY C (W) (24") (SLD) | 84 | LF |
$20.00 |
$21.00 |
$22.00 |
$23.40 |
| 54 | 672-6009 |
REFL PAV MRKR TY II-A-A | 668 | EA |
$4.00 |
$5.25 |
$5.45 |
$5.85 |
| 55 | 3076-6001 |
D-GR HMA TY-B PG64-22 | 19,985 | TON |
$100.00 |
$120.00 |
$109.20 |
$120.00 |
| 56 | 3076-6046 |
D-GR HMA TY-D SAC-B PG70-28 | 17,447 | TON |
$108.00 |
$125.00 |
$120.00 |
$130.00 |
| 57 | 3076-6047 |
D-GR HMA TY-D PG70-28 (LEVEL-UP) | 250 | TON |
$135.00 |
$210.00 |
$210.00 |
$178.50 |
| 58 | 3084-6001 |
BONDING COURSE | 18,380 | GAL |
$4.00 |
$4.50 |
$1.00 |
$5.50 |
| 59 | 6185-6002 |
TMA (STATIONARY) | 330 | DAY |
$204.00 |
$260.00 |
$325.00 |
$367.00 |
| 60 | 6185-6005 |
TMA (MOBILE OPERATION) | 20 | DAY |
$850.00 |
$260.00 |
$1,200.00 |
$1.00 |