Bid tab 0181-03-031

Let Mar 5, 2024 · Abilene · Callahan Sign up free

‹ Mar 2024 results

WIDEN ROAD - ADD LANES

Let date
Tuesday, March 5, 2024
CCSJ
0181-03-031
District
Abilene
County
Callahan
Highway
SH 36
Limits
CR 459 to FM 2707
Classification
Construction
Project number
C 181-3-31
Working days
270

Bidders 5

#ContractorTotal bidvs estimatevs low
EEEngineer's estimate$8,134,561
1 FOUTSCO PAVING COMPANY, LLC Low bidder $7,369,773 -9.4%
2 BONTKE BROTHERS CONSTRUCTION COMPANY $8,948,613 +10.0% +21.4%
3 REECE ALBERT, INC. $9,314,405 +14.5% +26.4%
4 CK NEWBERRY, LLC $10,098,624 +24.1% +37.0%
5 JAY MILLS CONTRACTING, INCORPORATED $10,642,774 +30.8% +44.4%

Bid tab: unit prices 68 items

ExcelCSV
SeqBid codeDescriptionQtyUnitEstimate #1 FOUTSCO PAVING …#2 BONTKE BROTHERS…#3 REECE ALBERT, I…#4 CK NEWBERRY, LLC#5 JAY MILLS CONTR…
1100-6001 PREPARING ROW5.7AC $20,000.00 $1,000.00 $4,000.00 $23,172.36 $20,000.00 $30,000.00
2105-6096 REMOV STAB BASE AND ASPH PAV (0"-12")3,038SY $10.00 $10.00 $10.00 $15.41 $25.00 $20.00
3110-6001 EXCAVATION (ROADWAY)10,823CY $15.00 $10.00 $12.00 $7.91 $40.00 $30.00
4132-6002 EMBANKMENT (FINAL)(DENS CONT)(TY A)6,013CY $30.00 $32.00 $15.00 $29.29 $60.00 $42.00
5134-6002 BACKFILL (TY B)233.7STA $175.00 $100.00 $200.00 $384.47 $400.00 $680.00
6164-6034 DRILL SEEDING (PERM) (RURAL) (SANDY)14.6AC $1,100.00 $600.00 $3,500.00 $1,170.25 $1,500.00 $1,200.00
7164-6042 DRILL SEEDING (TEMP) (WARM)7.3AC $800.00 $1.00 $4,000.00 $936.20 $800.00 $950.00
8164-6044 DRILL SEEDING (TEMP) (COOL)7.3AC $800.00 $1.00 $4,000.00 $936.20 $800.00 $950.00
9168-6001 VEGETATIVE WATERING594.2MG $50.00 $1.00 $300.00 $74.54 $33.00 $70.00
10247-6041 FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS)4,093CY $100.00 $85.00 $65.00 $114.76 $175.00 $87.00
11310-6009 PRIME COAT (MC-30)3,677GAL $5.25 $0.1000 $9.00 $7.35 $8.00 $6.50
12351-6013 FLEXIBLE PAVEMENT STRUCTURE REPAIR(4")1,000SY $67.00 $90.00 $58.00 $121.55 $100.00 $75.00
13354-6021 PLANE ASPH CONC PAV(0" TO 2")31,930SY $5.50 $1.00 $8.00 $5.53 $7.00 $4.00
14354-6043 PLANE ASPH CONC PAV (1")147,865SY $2.75 $0.7500 $6.00 $4.07 $3.00 $2.00
15432-6045 RIPRAP (MOW STRIP)(4 IN)55CY $625.00 $750.00 $900.00 $760.66 $800.00 $850.00
16462-6003 CONC BOX CULV (4 FT X 2 FT)8LF $500.00 $870.00 $4,000.00 $924.50 $3,500.00 $1,650.00
17462-6006 CONC BOX CULV (5 FT X 2 FT)16LF $600.00 $975.00 $4,000.00 $1,035.67 $2,500.00 $1,700.00
18464-6003 RC PIPE (CL III)(18 IN)57LF $100.00 $100.00 $425.00 $223.52 $200.00 $115.00
19464-6005 RC PIPE (CL III)(24 IN)104LF $120.00 $135.00 $400.00 $280.86 $250.00 $140.00
20466-6178 WINGWALL (PW - 1) (HW=3 FT)2EA $15,000.00 $11,000.00 $12,000.00 $11,117.36 $30,000.00 $13,000.00
21467-6363 SET (TY II) (18 IN) (RCP) (6: 1) (P)4EA $1,500.00 $1,500.00 $4,000.00 $2,422.41 $3,500.00 $2,150.00
22467-6395 SET (TY II) (24 IN) (RCP) (6: 1) (P)8EA $2,000.00 $2,000.00 $4,800.00 $3,036.80 $4,500.00 $2,500.00
23496-6004 REMOV STR (SET)11EA $2,500.00 $500.00 $650.00 $1,638.35 $2,500.00 $500.00
24496-6005 REMOV STR (WINGWALL)1EA $1,500.00 $1,000.00 $5,000.00 $6,436.36 $4,500.00 $1,250.00
25496-6016 REMOV STR (PIPE)6EA $800.00 $250.00 $300.00 $1,509.62 $3,000.00 $500.00
26496-6042 REMOV STR (SMALL)4EA $25.00 $1,500.00 $650.00 $1,989.42 $2,500.00 $2,000.00
27500-6001 MOBILIZATION1LS $650,000.00 $730,000.00 $675,000.00 $774,754.67 $1,000,000.00 $1,200,000.00
28502-6001 BARRICADES, SIGNS AND TRAFFIC HANDLING15MO $8,000.00 $13,000.00 $5,000.00 $6,996.47 $25,000.00 $20,000.00
29506-6038 TEMP SEDMT CONT FENCE (INSTALL)15,262LF $6.00 $0.0100 $3.00 $5.03 $5.00 $5.00
30506-6039 TEMP SEDMT CONT FENCE (REMOVE)15,262LF $2.00 $0.0100 $1.40 $0.3500 $0.5000 $0.5000
31506-6041 BIODEG EROSN CONT LOGS (INSTL) (12")1,280LF $9.00 $4.00 $8.00 $7.02 $7.00 $7.00
32506-6043 BIODEG EROSN CONT LOGS (REMOVE)1,280LF $2.50 $1.00 $4.00 $1.51 $1.50 $1.50
33530-6005 DRIVEWAYS (ACP)947SY $85.00 $50.00 $42.00 $104.24 $60.00 $105.00
34530-6006 DRIVEWAYS (SURF TREAT)491SY $50.00 $50.00 $28.00 $97.59 $55.00 $75.00
35530-6008 TURNOUTS (ACP)134SY $90.00 $75.00 $46.00 $143.47 $120.00 $220.00
36533-6001 RUMBLE STRIPS (SHOULDER)73,000LF $0.2000 $0.2000 $1.00 $0.1300 $0.3000 $0.1500
37533-6002 RUMBLE STRIPS (CENTERLINE)36,860LF $0.2000 $0.2600 $1.00 $0.1300 $0.2500 $0.2000
38540-6001 MTL W-BEAM GD FEN (TIM POST)300LF $30.00 $27.00 $30.00 $31.01 $32.00 $31.00
39540-6033 MTL BM GD FEN (LONG SPAN SYSTEM)3EA $2,000.00 $1,350.00 $1,650.00 $1,755.37 $1,700.00 $1,800.00
40542-6001 REMOVE METAL BEAM GUARD FENCE275LF $3.50 $2.50 $5.00 $2.34 $2.50 $2.50
41544-6001 GUARDRAIL END TREATMENT (INSTALL)6EA $3,500.00 $3,000.00 $6,550.00 $3,949.59 $4,000.00 $4,000.00
42544-6003 GUARDRAIL END TREATMENT (REMOVE)2EA $330.00 $250.00 $300.00 $234.05 $250.00 $250.00
43560-6007 MAILBOX INSTALL-S (WC-POST) TY 34EA $250.00 $200.00 $335.00 $251.60 $350.00 $350.00
44644-6004 IN SM RD SN SUP&AM TY10BWG(1)SA(T)17EA $900.00 $850.00 $1,050.00 $930.35 $1,100.00 $1,100.00
45644-6007 IN SM RD SN SUP&AM TY10BWG(1)SA(U)7EA $900.00 $950.00 $1,300.00 $1,249.83 $1,200.00 $1,300.00
46644-6030 IN SM RD SN SUP&AM TYS80(1)SA(T)9EA $600.00 $990.00 $1,500.00 $1,364.51 $1,300.00 $1,500.00
47644-6060 IN SM RD SN SUP&AM TYTWT(1)WS(P)33EA $375.00 $570.00 $700.00 $574.59 $750.00 $725.00
48644-6061 IN SM RD SN SUP&AM TYTWT(1)WS(T)8EA $440.00 $620.00 $820.00 $692.79 $850.00 $850.00
49644-6076 REMOVE SM RD SN SUP&AM29EA $200.00 $100.00 $115.00 $227.70 $150.00 $120.00
50658-6067 INSTL DEL ASSM (D-DW)SZ 1(BRF)GF223EA $60.00 $35.00 $100.00 $55.59 $55.00 $60.00
51658-6073 INSTL OM ASSM (OM-2Y)(WC)GND(BI)21EA $70.00 $90.00 $150.00 $90.11 $150.00 $150.00
52662-6075 WK ZN PAV MRK REMOV (W)24"(SLD)288LF $11.00 $5.00 $10.00 $5.85 $10.00 $15.00
53662-6098 WK ZN PAV MRK REMOV (Y)6"(SLD)73,300LF $1.00 $0.5000 $1.00 $0.5900 $1.15 $1.00
54662-6111 WK ZN PAV MRK SHT TERM (TAB)TY Y-24,740EA $1.75 $1.00 $1.00 $2.37 $2.00 $2.00
55666-6018 REFL PAV MRK TY I (W)6"(DOT)(100MIL)1,194LF $2.00 $1.00 $2.00 $1.29 $1.75 $1.25
56666-6306 RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)6,080LF $1.00 $0.5000 $2.00 $0.6100 $1.10 $1.00
57666-6309 RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)74,800LF $0.8500 $0.5000 $1.50 $0.6100 $1.00 $0.8000
58666-6321 RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)73,720LF $0.8500 $0.5000 $1.50 $0.6100 $1.00 $0.8500
59668-6076 PREFAB PAV MRK TY C (W) (24") (SLD)130LF $18.00 $18.00 $10.00 $21.06 $15.00 $21.00
60668-6077 PREFAB PAV MRK TY C (W) (ARROW)6EA $275.00 $225.00 $1,800.00 $263.31 $225.00 $650.00
61668-6092 PREFAB PAV MRK TY C (W) (36")(YLD TRI)8EA $60.00 $25.00 $1,800.00 $29.26 $105.00 $90.00
62672-6007 REFL PAV MRKR TY I-C305EA $5.00 $4.00 $6.00 $4.68 $5.25 $6.00
63672-6009 REFL PAV MRKR TY II-A-A922EA $6.50 $4.00 $6.00 $4.68 $5.25 $6.00
643077-6003 SP MIXES SP-B SAC-B PG64-223,035TON $150.00 $165.00 $150.00 $184.29 $180.00 $160.00
653077-6023 SP MIXES SP-C SAC-B PG70-2228,736TON $150.00 $152.00 $150.00 $171.90 $153.00 $205.00
663077-6075 TACK COAT24,904GAL $6.00 $6.00 $10.00 $5.70 $6.00 $0.0100
676185-6002 TMA (STATIONARY)102DAY $300.00 $1.00 $250.00 $311.09 $500.00 $250.00
686185-6005 TMA (MOBILE OPERATION)10DAY $600.00 $1.00 $500.00 $735.76 $700.00 $850.00