| 1 | 100-6002 |
PREPARING ROW | 4.73 | STA |
$25,000.00 |
$80,000.00 |
$3,000.00 |
$95,000.00 |
$75,000.00 |
$49,573.58 |
| 2 | 104-6009 |
REMOVING CONC (RIPRAP) | 2,907 | SY |
$18.00 |
$5.00 |
$15.25 |
$17.00 |
$50.00 |
$23.83 |
| 3 | 110-6001 |
EXCAVATION (ROADWAY) | 4,809 | CY |
$22.00 |
$5.00 |
$75.00 |
$95.00 |
$20.00 |
$58.20 |
| 4 | 110-6002 |
EXCAVATION (CHANNEL) | 180 | CY |
$49.00 |
$25.00 |
$75.00 |
$95.00 |
$50.00 |
$106.23 |
| 5 | 132-6026 |
EMBANKMENT (FINAL) (DENS CONT) (TY C2) | 147 | CY |
$80.00 |
$147.00 |
$31.00 |
$100.00 |
$50.00 |
$70.82 |
| 6 | 161-6017 |
COMPOST MANUF TOPSOIL (4") | 11,348 | SY |
$2.00 |
$1.05 |
$6.00 |
$3.00 |
$8.00 |
$4.25 |
| 7 | 162-6002 |
BLOCK SODDING | 11,348 | SY |
$5.75 |
$5.00 |
$7.50 |
$6.00 |
$8.00 |
$8.50 |
| 8 | 164-6051 |
DRILL SEED (TEMP)(WARM OR COOL) | 5,674 | SY |
$0.7000 |
$0.2100 |
$0.1500 |
$0.4000 |
$2.00 |
$0.2800 |
| 9 | 168-6001 |
VEGETATIVE WATERING | 2,532 | MG |
$20.00 |
$2.58 |
$1.00 |
$60.00 |
$35.00 |
$49.57 |
| 10 | 402-6001 |
TRENCH EXCAVATION PROTECTION | 31 | LF |
$65.00 |
$105.00 |
$7.20 |
$1.00 |
$10.00 |
$35.41 |
| 11 | 403-6001 |
TEMPORARY SPL SHORING | 4,984 | SF |
$25.00 |
$63.00 |
$5.00 |
$37.00 |
$100.00 |
$87.68 |
| 12 | 410-6001 |
SOIL NAIL ANCHORS | 9,841 | LF |
$62.00 |
$33.50 |
$37.00 |
$21.99 |
$80.00 |
$55.04 |
| 13 | 420-6011 |
CL B CONC (FLUME) | 8 | CY |
$1,100.00 |
$1,000.00 |
$780.00 |
$773.00 |
$2,000.00 |
$1,416.39 |
| 14 | 423-6022 |
RETAINING WALL (SOIL NAIL)(FACIA) | 5,094 | SF |
$77.00 |
$84.00 |
$110.00 |
$100.00 |
$55.00 |
$96.16 |
| 15 | 432-6002 |
RIPRAP (CONC)(5 IN) | 33 | CY |
$600.00 |
$1,000.00 |
$950.00 |
$800.00 |
$650.00 |
$701.11 |
| 16 | 432-6031 |
RIPRAP (STONE PROTECTION)(12 IN) | 1,366 | CY |
$195.00 |
$252.50 |
$360.00 |
$171.00 |
$250.00 |
$205.44 |
| 17 | 432-6033 |
RIPRAP (STONE PROTECTION)(18 IN) | 783 | CY |
$330.00 |
$252.20 |
$450.00 |
$182.00 |
$300.00 |
$211.92 |
| 18 | 450-6051 |
RAIL (HANDRAIL)(TY E) | 267 | LF |
$265.00 |
$210.00 |
$230.00 |
$166.00 |
$185.00 |
$228.08 |
| 19 | 459-6001 |
GABIONS (GALV) | 1,160 | CY |
$350.00 |
$420.00 |
$500.00 |
$367.00 |
$300.00 |
$704.83 |
| 20 | 459-6007 |
GABION MATTRESSES (GALV)(12 IN) | 264 | SY |
$225.00 |
$168.00 |
$230.00 |
$158.00 |
$185.00 |
$273.01 |
| 21 | 462-6099 |
CONC BOX CULV (6 FT X 2 FT) | 50 | LF |
$790.00 |
$630.00 |
$980.00 |
$555.00 |
$1,000.00 |
$968.81 |
| 22 | 464-6003 |
RC PIPE (CL III)(18 IN) | 32 | LF |
$260.00 |
$210.00 |
$200.00 |
$93.00 |
$100.00 |
$104.53 |
| 23 | 465-6012 |
JCTBOX(COMPL)(PJB)(8FTX8FT) | 1 | EA |
$18,000.00 |
$31,500.00 |
$35,000.00 |
$23,000.00 |
$45,000.00 |
$42,831.57 |
| 24 | 467-6203 |
SET (TY I)(S= 6 FT)(HW= 3 FT)(2:1) (P) | 1 | EA |
$9,800.00 |
$13,650.00 |
$16,700.00 |
$8,100.00 |
$25,000.00 |
$5,257.07 |
| 25 | 467-6356 |
SET (TY II) (18 IN) (RCP) (3: 1) (C) | 1 | EA |
$2,100.00 |
$2,520.00 |
$3,600.00 |
$2,610.00 |
$1,850.00 |
$1,427.72 |
| 26 | 467-6389 |
SET (TY II) (24 IN) (RCP) (3: 1) (P) | 1 | EA |
$1,800.00 |
$3,150.00 |
$4,500.00 |
$3,060.00 |
$2,500.00 |
$2,037.05 |
| 27 | 467-6473 |
SET (TY II) (48 IN) (RCP) (2: 1) (P) | 1 | EA |
$3,600.00 |
$13,650.00 |
$12,200.00 |
$8,220.00 |
$8,500.00 |
$4,058.80 |
| 28 | 496-6004 |
REMOV STR (SET) | 4 | EA |
$550.00 |
$630.00 |
$17.50 |
$1,000.00 |
$500.00 |
$584.26 |
| 29 | 496-6007 |
REMOV STR (PIPE) | 44 | LF |
$30.00 |
$63.00 |
$51.00 |
$32.00 |
$50.00 |
$26.41 |
| 30 | 500-6001 |
MOBILIZATION | 1 | LS |
$350,000.00 |
$378,400.00 |
$405,000.00 |
$498,000.00 |
$485,000.00 |
$481,571.90 |
| 31 | 502-6001 |
BARRICADES, SIGNS AND TRAFFIC HANDLING | 12 | MO |
$12,000.00 |
$31,500.00 |
$4,000.00 |
$40,900.00 |
$8,500.00 |
$16,996.66 |
| 32 | 506-6003 |
ROCK FILTER DAMS (INSTALL) (TY 3) | 204 | LF |
$70.00 |
$60.00 |
$75.00 |
$65.00 |
$50.00 |
$84.98 |
| 33 | 506-6004 |
ROCK FILTER DAMS (INSTALL) (TY 4) | 91 | LF |
$57.00 |
$90.00 |
$75.00 |
$75.00 |
$50.00 |
$84.98 |
| 34 | 506-6011 |
ROCK FILTER DAMS (REMOVE) | 295 | LF |
$16.00 |
$37.50 |
$15.00 |
$15.00 |
$20.00 |
$17.00 |
| 35 | 506-6020 |
CONSTRUCTION EXITS (INSTALL) (TY 1) | 1,462 | SY |
$30.00 |
$27.50 |
$37.75 |
$33.50 |
$45.00 |
$42.49 |
| 36 | 506-6024 |
CONSTRUCTION EXITS (REMOVE) | 1,462 | SY |
$10.00 |
$13.25 |
$15.00 |
$11.00 |
$20.00 |
$17.00 |
| 37 | 506-6038 |
TEMP SEDMT CONT FENCE (INSTALL) | 3,014 | LF |
$5.00 |
$4.00 |
$4.25 |
$3.25 |
$4.00 |
$4.96 |
| 38 | 506-6039 |
TEMP SEDMT CONT FENCE (REMOVE) | 3,014 | LF |
$2.50 |
$1.00 |
$0.6500 |
$1.00 |
$2.00 |
$0.7000 |
| 39 | 506-6041 |
BIODEG EROSN CONT LOGS (INSTL) (12") | 737 | LF |
$10.00 |
$5.25 |
$6.30 |
$5.00 |
$18.00 |
$7.08 |
| 40 | 506-6043 |
BIODEG EROSN CONT LOGS (REMOVE) | 737 | LF |
$5.00 |
$1.60 |
$1.30 |
$1.00 |
$9.00 |
$1.42 |
| 41 | 531-6002 |
CONC SIDEWALKS (5") | 446 | SY |
$120.00 |
$128.00 |
$170.00 |
$82.00 |
$65.00 |
$114.98 |
| 42 | 740-6004 |
ANTI - GRAFFITI COATING(PERMNENT-TY II) | 4,083 | SF |
$2.50 |
$1.50 |
$1.50 |
$0.9500 |
$5.00 |
$1.35 |
| 43 | 6001-6002 |
PORTABLE CHANGEABLE MESSAGE SIGN | 2 | EA |
$12,000.00 |
$20,000.00 |
$15,800.00 |
$30,000.00 |
$16,500.00 |
$14,163.88 |
| 44 | 6185-6002 |
TMA (STATIONARY) | 484 | DAY |
$150.00 |
$10.00 |
$350.00 |
$291.00 |
$250.00 |
$212.46 |