| 1 | 100-6001 |
PREPARING ROW | 1.71 | AC |
$50,000.00 |
$9,500.00 |
$10,000.00 |
$35,000.00 |
$30,000.00 |
$25,000.00 |
| 2 | 100-6004 |
PREPARING ROW(TREE)(12" TO 24" DIA) | 34 | EA |
$2,600.00 |
$475.00 |
$1,100.00 |
$1,000.00 |
$2,000.00 |
$1,800.00 |
| 3 | 100-6007 |
PREP ROW (TREE)(GREATER THAN 24" DIA) | 5 | EA |
$3,000.00 |
$1,500.00 |
$1,900.00 |
$1,000.00 |
$2,500.00 |
$3,600.00 |
| 4 | 100-6013 |
PREP ROW (TREE) (2" TO 12" DIA) | 42 | EA |
$810.00 |
$200.00 |
$360.00 |
$1,000.00 |
$1,500.00 |
$900.00 |
| 5 | 100-6015 |
PREPARING ROW (HAND CLEARING) | 0.09 | AC |
$50,000.00 |
$178,000.00 |
$105,000.00 |
$30,000.00 |
$100,000.00 |
$300,000.00 |
| 6 | 104-6009 |
REMOVING CONC (RIPRAP) | 7 | SY |
$50.00 |
$200.00 |
$600.00 |
$1,500.00 |
$250.00 |
$600.00 |
| 7 | 132-6001 |
EMBANKMENT (FINAL)(ORD COMP)(TY A) | 93 | CY |
$50.00 |
$132.00 |
$120.00 |
$10.00 |
$250.00 |
$450.00 |
| 8 | 354-6013 |
PLAN & TEXT CONC PAV(0" TO 1/2") | 1,459 | SY |
$20.00 |
$12.00 |
$60.00 |
$65.00 |
$56.50 |
$60.00 |
| 9 | 401-6001 |
FLOWABLE BACKFILL | 11 | CY |
$250.00 |
$1,000.00 |
$1,350.00 |
$300.00 |
$1,750.00 |
$1,200.00 |
| 10 | 420-6007 |
CL A CONC (FLUME) | 15 | CY |
$650.00 |
$2,400.00 |
$2,000.00 |
$850.00 |
$2,500.00 |
$2,700.00 |
| 11 | 427-6007 |
EPOXY WATERPROOF FINISH (TY X) | 15,822 | SF |
$12.00 |
$5.50 |
$8.00 |
$15.00 |
$23.00 |
$6.50 |
| 12 | 428-6001 |
PENETRATING CONCRETE SURFACE TREATMENT | 3,070 | SY |
$32.00 |
$11.00 |
$16.00 |
$17.00 |
$30.00 |
$12.50 |
| 13 | 429-6002 |
CONC STR REPAIR (EPOXY MORTAR) | 31 | SF |
$200.00 |
$250.00 |
$350.00 |
$300.00 |
$600.00 |
$600.00 |
| 14 | 432-6001 |
RIPRAP (CONC)(4 IN) | 89 | CY |
$650.00 |
$814.00 |
$690.00 |
$800.00 |
$1,500.00 |
$750.00 |
| 15 | 438-6001 |
CLEANING AND SEALING EXISTING JOINTS | 2,564 | LF |
$39.00 |
$79.50 |
$90.00 |
$120.00 |
$110.00 |
$90.00 |
| 16 | 438-6004 |
CLEANING AND SEALING EXIST JOINTS(CL7) | 202 | LF |
$50.00 |
$79.50 |
$45.00 |
$75.00 |
$115.00 |
$45.00 |
| 17 | 446-6023 |
CLEAN & PAINT EXIST PILING (SYSTEM I-B) | 1 | LS |
$30,000.00 |
$61,380.00 |
$140,000.00 |
$350,000.00 |
$265,000.00 |
$88,981.77 |
| 18 | 483-6013 |
SHOT BLASTING | 745 | SY |
$15.00 |
$10.00 |
$50.00 |
$15.00 |
$15.00 |
$200.00 |
| 19 | 496-6053 |
REMOV STR (WOOD STR) | 2 | EA |
$2,500.00 |
$500.00 |
$750.00 |
$250.00 |
$10,000.00 |
$4,000.00 |
| 20 | 500-6001 |
MOBILIZATION | 1 | LS |
$1,100,000.00 |
$396,000.00 |
$761,817.60 |
$650,000.00 |
$1,100,000.00 |
$1,100,000.00 |
| 21 | 502-6001 |
BARRICADES, SIGNS AND TRAFFIC HANDLING | 11 | MO |
$10,000.00 |
$6,200.00 |
$28,000.00 |
$1,600.00 |
$100,000.00 |
$27,000.00 |
| 22 | 510-6003 |
ONE-WAY TRAF CONT (PORT TRAF SIG) | 2 | MO |
$25,000.00 |
$5,400.00 |
$8,500.00 |
$5,500.00 |
$9,000.00 |
$8,000.00 |
| 23 | 540-6002 |
MTL W-BEAM GD FEN (STEEL POST) | 650 | LF |
$45.00 |
$41.80 |
$47.00 |
$35.00 |
$38.00 |
$120.00 |
| 24 | 540-6006 |
MTL BEAM GD FEN TRANS (THRIE-BEAM) | 4 | EA |
$2,500.00 |
$4,152.50 |
$3,900.00 |
$2,500.00 |
$3,775.00 |
$7,500.00 |
| 25 | 540-6037 |
MTL BM GD FEN TRANS (ANCHOR PLATE) | 4 | EA |
$1,200.00 |
$687.50 |
$1,700.00 |
$1,200.00 |
$625.00 |
$2,500.00 |
| 26 | 542-6001 |
REMOVE METAL BEAM GUARD FENCE | 725 | LF |
$5.00 |
$3.30 |
$7.00 |
$4.00 |
$3.00 |
$7.00 |
| 27 | 542-6002 |
REMOVE TERMINAL ANCHOR SECTION | 2 | EA |
$350.00 |
$330.00 |
$1,300.00 |
$300.00 |
$300.00 |
$1,200.00 |
| 28 | 544-6001 |
GUARDRAIL END TREATMENT (INSTALL) | 4 | EA |
$3,000.00 |
$3,822.50 |
$4,400.00 |
$3,600.00 |
$3,475.00 |
$7,500.00 |
| 29 | 544-6003 |
GUARDRAIL END TREATMENT (REMOVE) | 2 | EA |
$450.00 |
$330.00 |
$700.00 |
$300.00 |
$300.00 |
$400.00 |
| 30 | 662-6109 |
WK ZN PAV MRK SHT TERM (TAB)TY W | 682 | EA |
$1.50 |
$2.00 |
$5.00 |
$0.4200 |
$2.00 |
$1.00 |
| 31 | 662-6110 |
WK ZN PAV MRK SHT TERM (TAB)TY Y | 1,183 | EA |
$1.50 |
$2.00 |
$5.00 |
$0.4500 |
$2.00 |
$1.00 |
| 32 | 666-6032 |
REFL PAV MRK TY I (W)8"(LNDP)(090MIL) | 295 | LF |
$1.00 |
$2.20 |
$2.10 |
$2.00 |
$2.00 |
$2.25 |
| 33 | 666-6035 |
REFL PAV MRK TY I (W)8"(SLD)(090MIL) | 583 | LF |
$1.00 |
$2.20 |
$2.10 |
$2.00 |
$2.00 |
$2.25 |
| 34 | 666-6225 |
PAVEMENT SEALER 6" | 39,504 | LF |
$0.4000 |
$0.6100 |
$0.6000 |
$0.7500 |
$0.5500 |
$0.6700 |
| 35 | 666-6227 |
PAVEMENT SEALER 10" | 878 | LF |
$1.00 |
$1.10 |
$1.10 |
$1.00 |
$1.00 |
$1.10 |
| 36 | 672-6007 |
REFL PAV MRKR TY I-C | 167 | EA |
$5.00 |
$11.00 |
$10.20 |
$10.00 |
$10.00 |
$12.00 |
| 37 | 677-6001 |
ELIM EXT PAV MRK & MRKS (4") | 7,123 | LF |
$1.00 |
$1.38 |
$2.60 |
$1.50 |
$1.25 |
$1.75 |
| 38 | 712-6001 |
JT / CRCK SEAL (POLY MOD ASPH EMULSION) | 678 | LF |
$40.00 |
$40.00 |
$27.00 |
$15.00 |
$30.00 |
$27.00 |
| 39 | 713-6005 |
CRACK CLEANING AND SEALING (JCP) | 480 | LF |
$70.00 |
$17.50 |
$43.00 |
$15.00 |
$30.00 |
$24.00 |
| 40 | 778-6001 |
CONCRETE RAIL REPAIR (IN-KIND) | 4 | LF |
$250.00 |
$250.00 |
$700.00 |
$310.00 |
$1,000.00 |
$1,000.00 |
| 41 | 4106-6007 |
POLYESTER POLYMER CONC OVERLAY (1") | 71,440 | SY |
$137.00 |
$99.75 |
$112.00 |
$116.00 |
$97.90 |
$115.00 |
| 42 | 5128-6003 |
INSTALL BAT HOUSE LARGE | 2 | EA |
$4,000.00 |
$5,000.00 |
$3,500.00 |
$10,000.00 |
$25,000.00 |
$8,500.00 |
| 43 | 6001-6002 |
PORTABLE CHANGEABLE MESSAGE SIGN | 2 | EA |
$16,000.00 |
$20,400.00 |
$33,000.00 |
$1,500.00 |
$15,500.00 |
$24,000.00 |
| 44 | 6024-6002 |
HPPM W/RET REQ TY I(W)4"(BRK)(090MIL) | 890 | LF |
$0.7000 |
$1.10 |
$1.10 |
$1.00 |
$1.00 |
$1.10 |
| 45 | 6024-6005 |
HPPM W/RET REQ TY I(W)4"(SLD)(090MIL) | 26,756 | LF |
$0.5000 |
$0.9900 |
$0.9500 |
$1.00 |
$0.9000 |
$1.00 |
| 46 | 6024-6014 |
HPPM W/RET REQ TY I(Y)4"(BRK)(090MIL) | 2,720 | LF |
$0.7000 |
$1.10 |
$1.10 |
$1.00 |
$1.00 |
$1.10 |
| 47 | 6024-6017 |
HPPM W/RET REQ TY I(Y)4"(SLD)(090MIL) | 14,500 | LF |
$0.5000 |
$0.9900 |
$0.9500 |
$1.00 |
$0.9000 |
$1.00 |
| 48 | 6185-6002 |
TMA (STATIONARY) | 180 | DAY |
$300.00 |
$395.00 |
$360.00 |
$185.00 |
$380.00 |
$600.00 |
| 49 | 6185-6003 |
TMA (MOBILE OPERATION) | 200 | HR |
$45.00 |
$105.00 |
$100.00 |
$95.00 |
$95.00 |
$95.00 |