| 1 | 100-6002 |
PREPARING ROW | 4.5 | STA |
$5,000.00 |
$2,650.00 |
$3,500.00 |
$1,500.00 |
|
| 2 | 168-6001 |
VEGETATIVE WATERING | 171 | MG |
$15.00 |
$10.00 |
$20.00 |
$20.00 |
|
| 3 | 170-6001 |
IRRIGATION SYSTEM | 1 | LS |
$45,000.00 |
$68,500.00 |
$50,000.00 |
$35.00 |
|
| 4 | 192-6004 |
PLANT MATERIAL (5-GAL) | 1,064 | EA |
$30.00 |
$19.00 |
$35.00 |
$27.00 |
|
| 5 | 192-6015 |
LANDSCAPE EDGE | 715 | LF |
$20.00 |
$7.50 |
$19.00 |
$2.50 |
|
| 6 | 192-6016 |
PLANT BED PREPARATION | 1,591 | SY |
$10.00 |
$2.50 |
$5.00 |
$10.00 |
|
| 7 | 192-6025 |
PLANT MATERIAL (45 GAL) (TREE) | 18 | EA |
$500.00 |
$300.00 |
$425.00 |
$300.00 |
|
| 8 | 193-6001 |
PLANT MAINTENANCE | 12 | MO |
$2,000.00 |
$1,600.00 |
$1,000.00 |
$220.00 |
|
| 9 | 193-6007 |
IRRIGATION SYSTEM OPER AND MAINT | 12 | MO |
$1,000.00 |
$800.00 |
$1,000.00 |
$200.00 |
|
| 10 | 432-6041 |
RIPRAP (SPECIAL) | 45 | CY |
$550.00 |
$450.00 |
$650.00 |
$1,500.00 |
|
| 11 | 432-6045 |
RIPRAP (MOW STRIP)(4 IN) | 7 | CY |
$500.00 |
$675.00 |
$2,000.00 |
$1,000.00 |
|
| 12 | 500-6001 |
MOBILIZATION | 1 | LS |
$30,000.00 |
$11,000.00 |
$30,000.00 |
$100,000.00 |
|
| 13 | 502-6001 |
BARRICADES, SIGNS AND TRAFFIC HANDLING | 7 | MO |
$5,000.00 |
$1,500.00 |
$1,500.00 |
$6,000.00 |
|
| 14 | 506-6040 |
BIODEG EROSN CONT LOGS (INSTL) (8") | 637 | LF |
$10.00 |
$1.50 |
$3.00 |
$6.00 |
|
| 15 | 506-6043 |
BIODEG EROSN CONT LOGS (REMOVE) | 637 | LF |
$2.50 |
$1.00 |
$1.00 |
$2.00 |
|
| 16 | 618-6034 |
CONDT (PVC) (SCH 40) (4") (BORE) | 63 | LF |
$50.00 |
$50.00 |
$45.00 |
$40.00 |
|
| 17 | 620-6007 |
ELEC CONDR (NO.8) BARE | 210 | LF |
$50.00 |
$0.8500 |
$10.00 |
$8.00 |
|
| 18 | 1005-6001 |
LOOSE AGGR FOR GROUNDCOVER (TYPE I) | 132 | CY |
$200.00 |
$300.00 |
$350.00 |
$250.00 |
|