| 1 | 428-6001 |
PENETRATING CONCRETE SURFACE TREATMENT | 17,162 | SY |
$13.00 |
$9.24 |
$20.00 |
$6.00 |
$21.00 |
$25.00 |
$30.00 |
| 2 | 429-6002 |
CONC STR REPAIR (EPOXY MORTAR) | 295 | SF |
$300.00 |
$235.68 |
$213.00 |
$190.00 |
$424.00 |
$650.00 |
$500.00 |
| 3 | 429-6007 |
CONC STR REPAIR (VERTICAL & OVERHEAD) | 2,004 | SF |
$250.00 |
$182.40 |
$190.00 |
$160.00 |
$300.00 |
$500.00 |
$400.00 |
| 4 | 429-6009 |
CONC STR REPAIR (STANDARD) | 10 | SF |
$350.00 |
$230.78 |
$185.00 |
$300.00 |
$285.00 |
$500.00 |
$1,000.00 |
| 5 | 432-6001 |
RIPRAP (CONC)(4 IN) | 75 | CY |
$2,000.00 |
$745.21 |
$756.00 |
$646.00 |
$595.00 |
$650.00 |
$1,000.00 |
| 6 | 432-6045 |
RIPRAP (MOW STRIP)(4 IN) | 56 | CY |
$550.00 |
$1,160.94 |
$1,235.00 |
$700.00 |
$950.00 |
$650.00 |
$1,000.00 |
| 7 | 438-6004 |
CLEANING AND SEALING EXIST JOINTS(CL7) | 1,038 | LF |
$45.00 |
$53.64 |
$50.00 |
$49.00 |
$52.00 |
$100.00 |
$100.00 |
| 8 | 451-6024 |
RETROFIT RAIL (TY SSTR) | 1,012 | LF |
$350.00 |
$326.89 |
$307.50 |
$275.00 |
$225.00 |
$200.00 |
$400.00 |
| 9 | 500-6001 |
MOBILIZATION | 1 | LS |
$251,747.90 |
$199,908.00 |
$201,800.00 |
$240,000.00 |
$333,000.00 |
$325,000.00 |
$350,000.00 |
| 10 | 502-6001 |
BARRICADES, SIGNS AND TRAFFIC HANDLING | 9 | MO |
$40,000.00 |
$9,972.14 |
$3,900.00 |
$60,000.00 |
$18,000.00 |
$12,500.00 |
$2,000.00 |
| 11 | 506-6042 |
BIODEG EROSN CONT LOGS (INSTL) (18") | 4,755 | LF |
$20.00 |
$5.83 |
$10.90 |
$9.50 |
$8.00 |
$18.00 |
$15.00 |
| 12 | 506-6043 |
BIODEG EROSN CONT LOGS (REMOVE) | 4,755 | LF |
$2.50 |
$1.60 |
$1.15 |
$1.00 |
$1.00 |
$9.00 |
$3.00 |
| 13 | 510-6003 |
ONE-WAY TRAF CONT (PORT TRAF SIG) | 1 | MO |
$10,000.00 |
$7,045.44 |
$10,500.00 |
$10,000.00 |
$9,500.00 |
$8,500.00 |
$7,000.00 |
| 14 | 512-6001 |
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1) | 860 | LF |
$90.00 |
$49.71 |
$24.00 |
$120.00 |
$95.00 |
$110.00 |
$100.00 |
| 15 | 512-6025 |
PORT CTB (MOVE)(SGL SLP)(TY 1) | 860 | LF |
$12.00 |
$16.45 |
$24.00 |
$7.00 |
$35.00 |
$40.00 |
$35.00 |
| 16 | 512-6049 |
PORT CTB (REMOVE)(SGL SLP)(TY 1) | 860 | LF |
$25.00 |
$20.17 |
$24.00 |
$18.00 |
$35.00 |
$40.00 |
$30.00 |
| 17 | 540-6002 |
MTL W-BEAM GD FEN (STEEL POST) | 925 | LF |
$40.00 |
$42.80 |
$42.50 |
$32.25 |
$50.00 |
$50.00 |
$45.00 |
| 18 | 540-6006 |
MTL BEAM GD FEN TRANS (THRIE-BEAM) | 4 | EA |
$3,000.00 |
$4,617.83 |
$3,780.00 |
$2,775.00 |
$4,500.00 |
$4,000.00 |
$4,000.00 |
| 19 | 540-6016 |
DOWNSTREAM ANCHOR TERMINAL SECTION | 2 | EA |
$1,800.00 |
$2,222.13 |
$1,941.00 |
$1,250.00 |
$2,500.00 |
$2,500.00 |
$2,500.00 |
| 20 | 542-6001 |
REMOVE METAL BEAM GUARD FENCE | 925 | LF |
$3.50 |
$6.14 |
$6.00 |
$3.00 |
$8.00 |
$3.00 |
$8.00 |
| 21 | 542-6002 |
REMOVE TERMINAL ANCHOR SECTION | 1 | EA |
$180.00 |
$1,354.27 |
$345.00 |
$300.00 |
$450.00 |
$1,000.00 |
$600.00 |
| 22 | 542-6003 |
REMOVE DOWNSTREAM ANCHOR TERMINAL | 2 | EA |
$250.00 |
$827.13 |
$345.00 |
$300.00 |
$450.00 |
$1,000.00 |
$600.00 |
| 23 | 544-6001 |
GUARDRAIL END TREATMENT (INSTALL) | 2 | EA |
$3,000.00 |
$4,057.13 |
$4,042.00 |
$3,300.00 |
$5,000.00 |
$5,000.00 |
$4,500.00 |
| 24 | 544-6003 |
GUARDRAIL END TREATMENT (REMOVE) | 1 | EA |
$350.00 |
$1,354.27 |
$350.00 |
$300.00 |
$500.00 |
$2,500.00 |
$1,650.00 |
| 25 | 545-6003 |
CRASH CUSH ATTEN (MOVE & RESET) | 1 | EA |
$3,000.00 |
$3,914.27 |
$4,000.00 |
$500.00 |
$1,850.00 |
$6,500.00 |
$2,500.00 |
| 26 | 545-6005 |
CRASH CUSH ATTEN (REMOVE) | 1 | EA |
$2,500.00 |
$2,054.27 |
$3,000.00 |
$663.00 |
$2,000.00 |
$2,500.00 |
$2,000.00 |
| 27 | 545-6019 |
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3) | 1 | EA |
$15,000.00 |
$13,085.67 |
$9,000.00 |
$20,000.00 |
$15,000.00 |
$30,000.00 |
$15,000.00 |
| 28 | 658-6013 |
INSTL DEL ASSM (D-SW)SZ (BRF)CTB | 44 | EA |
$30.00 |
$61.98 |
$37.00 |
$50.00 |
$75.00 |
$100.00 |
$55.00 |
| 29 | 658-6015 |
INSTL DEL ASSM (D-SW)SZ (BRF)GF1 | 34 | EA |
$30.00 |
$34.00 |
$20.00 |
$18.50 |
$75.00 |
$100.00 |
$50.00 |
| 30 | 658-6026 |
INSTL DEL ASSM (D-SY)SZ (BRF)CTB | 44 | EA |
$35.00 |
$61.98 |
$31.00 |
$50.00 |
$75.00 |
$100.00 |
$50.00 |
| 31 | 658-6028 |
INSTL DEL ASSM (D-SY)SZ (BRF)GF1 | 16 | EA |
$30.00 |
$51.45 |
$20.00 |
$18.50 |
$75.00 |
$100.00 |
$50.00 |
| 32 | 662-6092 |
WK ZN PAV MRK REMOV (W)36"(YLD TRI) | 2 | EA |
$1.50 |
$513.57 |
$2,300.00 |
$250.00 |
$1,500.00 |
$1,500.00 |
$500.00 |
| 33 | 780-6002 |
CNC CRACK REPAIR (DISCRETE)(INJECT) | 245 | LF |
$125.00 |
$176.59 |
$90.00 |
$105.00 |
$222.00 |
$100.00 |
$150.00 |
| 34 | 4207-6003 |
STEEL BRIDGE ZONE PAINTING REF STR #3 | 3 | EA |
$120,000.00 |
$89,783.58 |
$98,900.00 |
$133,000.00 |
$238,500.00 |
$100,000.00 |
$150,000.00 |
| 35 | 6185-6002 |
TMA (STATIONARY) | 177 | DAY |
$300.00 |
$309.14 |
$300.00 |
$400.00 |
$300.00 |
$250.00 |
$300.00 |
| 36 | 7306-6001 |
BRIDGE SUBSTRUCTURE CLEANING (ABUT) | 4 | EA |
$500.00 |
$3,491.07 |
$4,425.00 |
$2,100.00 |
$2,500.00 |
$10,000.00 |
$2,500.00 |