| Let date | CCSJ | County / District | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| Mar 3, 2027 estimated | 0158-01-087 | RunnelsSan Angelo | US 67 | Safety Improvement Projects Install/Upgrade Roadway Lighting AT FM 1678 to - | $124,140 | Planned | ||
| Mar 3, 2027 estimated | 0158-02-103 | Tom GreenSan Angelo | US 67 | Safety Improvement Projects Install/Upgrade Roadway Lighting AT DOUGLAS LOOP S to - | $183,696 | Planned | ||
| Mar 3, 2027 estimated | 0159-01-048 | Tom GreenSan Angelo | US 277 | Safety Improvement Projects Install/Upgrade Roadway Lighting AT SCHWARTZ ROAD to - | $114,691 | Planned | ||
| Mar 3, 2027 estimated | 0173-02-080 | KaufmanDallas | SH 34 | Bridge Widening or Rehabilitation Bridge Replacement at Trinity River to . | $711,256 | Planned | ||
| Mar 3, 2027 estimated | 0180-01-086 | CalhounYoakum | SH 35 | Bridge Replacement AT VICTORIA BARGE CANAL to STR# 0180-01-034 | $37,124,335 | Planned | ||
| Mar 3, 2027 estimated | 0245-19-031 | Van ZandtTyler | SH 64 | Safety Improvement Projects Hazard Elimination & Safety .5 MI. W. of FM 314 to .3 MI. E of FM 314 | $470,000 | Planned | ||
| Mar 3, 2027 estimated | 0266-13-016 | WhartonYoakum | FM 653 | Rehabilitation of Existing Road Construct Pedestrian Infrastructure SH 71 North to SH 71 South | $22,403,740 | Planned | ||
| Mar 3, 2027 estimated | 0266-13-019 | WhartonYoakum | FM 653 | Pedestrian, Sidewalks & Curb Ramps Construct Pedestrian Infrastructure SH 71 to BU 59S | $4,241,000 | Planned | ||
| Mar 3, 2027 estimated | 0269-02-074 | LavacaYoakum | US 77 | Overlay Resurface Roadway US 77A to US 90A | $968,000 | Planned | ||
| Mar 3, 2027 estimated | 0271-16-162 | HarrisHouston | IH 610 | Overlay Surfacing/Roadway Restoration UA 90 to Jason Street | $3,254,850 | Planned | ||
| Mar 3, 2027 estimated | 0320-05-016 | BellWaco | SL 363 | Intersection & Operational Imprv Intersection Improvements With Right And/Or Left T @ Lorraine Ave to @ Lorraine Ave | $1,940,700 | Planned | ||
| Mar 3, 2027 estimated | 0320-05-017 | BellWaco | SL 363 | Intersection & Operational Imprv Intersection Improvements With Right And/Or Left T @ Tower Rd to @ Tower Rd | $1,940,700 | Planned | ||
| Mar 3, 2027 estimated | 0354-06-042 | AndrewsOdessa | SH 115 | Super-2 Highway Widen Road - Add Lanes And Shoulders 1.5 MI N of SW 4000 to S of SH 176 | $29,100,000 | Planned | ||
| Mar 3, 2027 estimated | 0370-01-042 | LavacaYoakum | US 77 | Overlay Resurface Roadway US 90A to FM 318 | $1,100,000 | Planned | ||
| Mar 3, 2027 estimated | 0371-01-097 | VictoriaYoakum | US 77 | Safety Improvement Projects Hazard Elimination & Safety 11.71 Mi N of Refugio C/L to 3.56 Mi N of Refugio C/L | $3,267,477 | Planned | ||
| Mar 3, 2027 estimated | 0372-01-114 | San PatricioCorpus Christi | US 77 | Overlay Resurface Roadway Bullard St. to 0.17 MI South of Nolan St. | $1,400,000 | Planned | ||
| Mar 3, 2027 estimated | 0446-01-057 | LavacaYoakum | UA 90 | Overlay Resurface Roadway US 77 to FM 2314 | $1,500,001 | Planned | ||
| Mar 3, 2027 estimated | 0463-04-029 | GlasscockSan Angelo | SH 158 | Safety Improvement Projects Install/Upgrade Roadway Lighting AT COUNTY ROAD 110 to - | $183,696 | Planned | ||
| Mar 3, 2027 estimated | 0471-05-048 | BastropAustin | SH 21 | Safety Improvement Projects Hazard Elimination & Safety Margarita Drive to Legend Oaks Drive | $1,543,451 | Planned | ||
| Mar 3, 2027 estimated | 0500-03-656 | HarrisHouston | IH 45 | Overlay Surfacing/Roadway Restoration UA 90 to IH 69 | $1,280,375 | Planned | ||
| Mar 3, 2027 estimated | 0502-01-247 | HarrisHouston | SH 225 | Transportation Non-Roadway Install/Upgrade Roadway Lighting IH 610(E) to SL 8(E) | $1,014,187 | Planned | ||
| Mar 3, 2027 estimated | 0508-01-393 | HarrisHouston | IH 10 | Transportation Non-Roadway Install/Upgrade Roadway Lighting IH 45 to SL 8(E) | $4,572,884 | Planned | ||
| Mar 3, 2027 estimated | 0558-09-041 | ReaganSan Angelo | SH 137 | Safety Improvement Projects Install/Upgrade Roadway Lighting AT WEATHERBY ROAD to - | $114,691 | Planned | ||
| Mar 3, 2027 estimated | 0574-01-035 | NavarroDallas | SH 309 | Restoration Rehabilitate Existing Roadway SH 31 to FM 1393 | $5,470,818 | Planned | ||
| Mar 3, 2027 estimated | 0627-02-020 | NewtonBeaumont | FM 363 | Safety Improvement Projects Hazard Elimination & Safety JASPER COUNTY LINE, EAST to SH 87 | $3,535,448 | Planned | ||
| Mar 3, 2027 estimated | 0650-04-035 | RunnelsSan Angelo | SH 153 | Safety Improvement Projects Install/Upgrade Roadway Lighting AT FM 382 to - | $114,691 | Planned | ||
| Mar 3, 2027 estimated | 0702-04-011 | HardemanChildress | FM 91 | Bridge Replacement @ Draw to . | $318,240 | Planned | ||
| Mar 3, 2027 estimated | 0720-02-098 | MontgomeryHouston | FM 149 | Overlay Rehabilitate Existing Roadway Keenan Cutoff Road to FM 1774 | $6,691,727 | Planned | ||
| Mar 3, 2027 estimated | 0797-07-033 | CollingsworthChildress | FM 1036 | Bridge Replacement FM 1036 @ Dozier Creek to . | $1,650,000 | Planned | ||
| Mar 3, 2027 estimated | 0807-03-040 | FayetteYoakum | FM 153 | Bridge Replacement AT LITTLE PIN OAK CREEK to STR# 0807-03-009 | $3,251,000 | Planned | ||
| Mar 3, 2027 estimated | 0847-06-013 | BrazoriaHouston | FM 521 | Overlay Resurface Roadway CR 44 to SH 35 | $2,452,227 | Planned | ||
| Mar 3, 2027 estimated | 0848-01-044 | MedinaSan Antonio | FM 462 | Rehabilitation of Existing Road Rehabilitate Existing Roadway US 90 to CR 532 | $9,537,611 | Planned | ||
| Mar 3, 2027 estimated | 0913-28-105 | FayetteYoakum | CR 7600293 | Bridge Replacement @ Cedar Branch to STR# AA01-41-002 (E Radhost School) | $775,000 | Planned | ||
| Mar 3, 2027 estimated | 0914-04-365 | TravisAustin | CS 258383 | Safety Improvement Projects Hazard Elimination & Safety at Ralph Ablanedo Drive to . | $311,181 | Planned | ||
| Mar 3, 2027 estimated | 0918-47-491 | DallasDallas | CS 262900 | Safety Improvement Projects Traffic Signal Improvements At Meadowknoll to City of Dallas | $469,802 | Planned | ||
| Mar 3, 2027 estimated | 0918-47-493 | DallasDallas | CS 1058601 | Safety Improvement Projects Traffic Signal Improvements Dallas Parkway to City of Dallas | $589,973 | Planned | ||
| Mar 3, 2027 estimated | 0918-47-497 | DallasDallas | TL 5 | Safety Improvement Projects Traffic Signal Improvements Verde Valley to In the City of Dallas | $666,265 | Planned | ||
| Mar 3, 2027 estimated | 0918-47-498 | DallasDallas | CS 263202 | Safety Improvement Projects Traffic Signal Improvements at Schroeder to In the City of Dallas | $426,693 | Planned | ||
| Mar 3, 2027 estimated | 1003-01-112 | BrazoriaHouston | FM 523 | Safety Improvement Projects Hazard Elimination & Safety FM 2004 to CR 232 | $743,971 | Planned | ||
| Mar 3, 2027 estimated | 1020-01-068 | BowieAtlanta | FM 559 | Overlay Surfacing/Roadway Restoration FM 989 to SH 93 | $2,400,000 | Planned | ||
| Mar 3, 2027 estimated | 1310-01-050 | DentonDallas | FM 407 | Widen Non-Freeway Widen Road - Add Lanes West of IH 35W to East of IH 35W | $32,453,173 | Planned | ||
| Mar 3, 2027 estimated | 1310-01-055 | DentonDallas | FM 407 | Intersection & Operational Imprv Widen Road - Add Lanes West of IH 35W to East of IH 35W | $189,000 | Planned | ||
| Mar 3, 2027 estimated | 1310-01-056 | DentonDallas | FM 407 | Intersection & Operational Imprv Widen Road - Add Lanes At Gateway Drive to in City of Argyle | $481,193 | Planned | ||
| Mar 3, 2027 estimated | 2075-01-064 | SmithTyler | SL 323 | Pedestrian, Sidewalks & Curb Ramps Construct Pedestrian Infrastructure NNW SL 323 to at Tyler High School | $574,000 | Planned | ||
| Mar 3, 2027 estimated | 2103-01-046 | WilliamsonAustin | RM 2243 | Overlay Resurface Roadway Austin Avenue to IH 35 | $590,415 | Planned | ||
| Mar 3, 2027 estimated | 2208-01-074 | TarrantFort Worth | SS 303 | Overlay Resurface Roadway SH 360 to DALLAS COUNTY LINE | $3,200,108 | Planned | ||
| Mar 3, 2027 estimated | 2211-02-033 | WilliamsonAustin | FM 1460 | Overlay Resurface Roadway Austin Avenue to 0.1 MI W of Quail Valley Dr. | $642,231 | Planned | ||
| Mar 3, 2027 estimated | 2263-03-053 | NuecesCorpus Christi | SH 361 | Safety Improvement Projects Highway Improvement Access Road 1 to Zahn Rd | $12,000,000 | Planned | ||
| Mar 3, 2027 estimated | 2350-01-079 | VictoriaYoakum | US 77 | Safety Improvement Projects Hazard Elimination & Safety 1.50 Mi North of BU 59T to 2 Mi South of FM 236 | $200,000 | Planned | ||
| Mar 3, 2027 estimated | 2398-01-063 | TaylorAbilene | SL 322 | Bridge Replacement AT to MAPLE ST | $8,789,358 | Planned | ||
| Mar 3, 2027 estimated | 2410-01-012 | Tom GreenSan Angelo | FM 2105 | Safety Improvement Projects Install/Upgrade Roadway Lighting AT GRAPE CREEK ROAD to - | $114,691 | Planned | ||
| Mar 3, 2027 estimated | 2632-01-010 | WheelerChildress | FM 2697 | Bridge Replacement FM 2697 @ Salt Creek to . | $1,500,000 | Planned | ||
| Mar 3, 2027 estimated | 3050-03-027 | HarrisHouston | FM 2978 | Overlay Surfacing/Roadway Restoration Union Pacific Railroad to South of Hufsmith Kuykendahl Road | $561,592 | Planned | ||
| Mar 3, 2027 estimated | 3256-01-131 | HarrisHouston | SL 8 | Overlay Surfacing/Roadway Restoration South Gessner Rd to West Bellfort Ave | $2,062,700 | Planned | ||
| Mar 3, 2027 estimated | 3256-02-117 | HarrisHouston | SL 8 | Transportation Non-Roadway Install/Upgrade Roadway Lighting IH 45(N) to IH 69(N) | $1,077,887 | Planned | ||
| Mar 3, 2027 estimated | 6487-66-001 | HarrisHouston | SH 6 | Routine Maintenance Project - Sealed BASE REPAIR WITH SEAL COAT AND/OR OVERLAY SB Frontage Road at Westpark Tollway to SB Frontage Road at Westpark Tollway | $1,000,000 | Planned | ||
| Mar 3, 2027 estimated | 6495-03-001 | Fort BendHouston | US 59 | Routine Maintenance Project - Sealed DITCH CLEANING AND RESHAPING Various Highways in Fort Bend County to Various Highways in Fort Bend County | $346,000 | Planned | ||
| Mar 3, 2027 estimated | 6495-07-001 | Fort BendHouston | US 59 | Routine Maintenance Project - Sealed CLEANING AND SWEEPING HIGHWAYS Various Highways in Fort Bend County to Various Highways in Fort Bend County | $1,552,000 | Planned | ||
| Mar 3, 2027 estimated | 6510-40-001 | CameronPharr | IH 69E | Routine Maintenance Project - Sealed Extension of U-turn storage lanes IH69E NB Frontage to @ FM 1732 | $500,000 | Planned | ||
| Mar 7, 2027 estimated | 0413-06-015 | LeonBryan | SH 164 | Intersection & Operational Imprv Donation 350 Ft E of Boyd St to 0.23 Miles W of Martin St | $486,677 | Planned | ||
| Mar 15, 2027 estimated | 0187-05-072 | Fort BendHouston | SS 10 | Intersection & Operational Imprv Intersection Improvements With Right And/Or Left T Day Drive to Lott Lane | $670,000 | Planned | ||
| Mar 15, 2027 estimated | 0675-08-128 | MontgomeryHouston | IH 45 | Intersection & Operational Imprv Intersection Improvement At SL 336(N) to . | $1,441,148 | Planned | ||
| Mar 15, 2027 estimated | 0912-73-246 | GalvestonHouston | CS 255442 | Overlay Resurface Roadway SH 87 (Broadway) to SS 342 (61st Street) | $8,570,000 | Planned | ||
| Mar 15, 2027 estimated | 0912-73-247 | GalvestonHouston | CS 255448 | Overlay Resurface Roadway Stewart Rd: 7 1/2 Mile Rd to 13 Mile Rd to 13 Mile Rd: Stewart Rd to FM 3005 | $4,486,742 | Planned | ||
| Mar 15, 2027 estimated | 0912-73-249 | GalvestonHouston | CS 255689 | Traffic Control Devices Traffic Signal Improvements Briarmeadow Avenue to Cowards Creek Drive | $3,022,870 | Planned | ||
| Mar 15, 2027 estimated | 3595-01-027 | GalvestonHouston | SH 275 | Traffic Control Devices Install Traffic Signal At 33rd Street to . | $492,622 | Planned | ||
| Apr 1, 2027 estimated | 0440-06-027 | TravisAustin | SH 130 | Freeway Operational Improvements Highway Operations Program Colorado River to FM 969 | $40,000 | Planned | ||
| Apr 1, 2027 estimated | 0916-00-282 | NuecesCorpus Christi | CS 0020 | Bicycle Infrastructure Improvements Construct Pedestrian Infrastructure End of Holly Rd across Oso Bay to Flour Bluff Dr/Don Patricio Rd | $9,480,737 | Planned | ||
| Apr 1, 2027 estimated | 3128-01-015 | CoryellWaco | FM 116 | Widen Non-Freeway Intersection Improvements With Right And/Or Left T US 190 to COMMERCE STREET | $992,013 | Planned | ||
| Apr 1, 2027 estimated | 3292-01-018 | BellWaco | FM 93 | Intersection & Operational Imprv Intersection Improvement AT HARTRICK BLUFF to AT HARTTRICK BLUFF | $1,900,000 | Planned | ||
| Apr 2, 2027 estimated | 0002-14-048 | El PasoEl Paso | FM 258 | Pedestrian, Sidewalks & Curb Ramps Bicycle And Pedestrian Improvements Nicholas Road to Glorietta Road | $6,166,338 | Planned | ||
| Apr 6, 2027 estimated | 0005-05-119 | HowardAbilene | IH 20 | Safety Improvement Projects Hazard Elimination & Safety at to Exit 165 EB | $778,551 | Planned | ||
| Apr 6, 2027 estimated | 0005-06-131 | HowardAbilene | IH 20 | Safety Improvement Projects Hazard Elimination & Safety at to Exit 188 EB | $778,079 | Planned | ||
| Apr 6, 2027 estimated | 0006-01-108 | MitchellAbilene | IH 20 | Safety Improvement Projects Hazard Elimination & Safety at to Exit 217 WB | $792,884 | Planned | ||
| Apr 6, 2027 estimated | 0006-01-109 | MitchellAbilene | IH 20 | Safety Improvement Projects Hazard Elimination & Safety at to Exit 226B WB | $769,889 | Planned | ||
| Apr 6, 2027 estimated | 0006-05-131 | TaylorAbilene | IH 20 | Safety Improvement Projects Hazard Elimination & Safety AT to WB ENTRANCE RAMP OLD ANSON RD | $713,590 | Planned | ||
| Apr 6, 2027 estimated | 0006-05-132 | TaylorAbilene | IH 20 | Safety Improvement Projects Hazard Elimination & Safety AT to EXIT 285 EB | $770,440 | Planned | ||
| Apr 6, 2027 estimated | 0009-03-052 | DallasDallas | SH 66 | Landscape & Scenic Enhancement Landscape Development Antioch Dr to Dexham Rd | $240,364 | Planned | ||
| Apr 6, 2027 estimated | 0009-04-079 | RockwallDallas | SH 66 | Landscape & Scenic Enhancement Landscape Development Scenic Drive to Harborside Drive | $120,909 | Planned | ||
| Apr 6, 2027 estimated | 0015-01-263 | McLennanWaco | IH 35 | Restoration Rehabilitate Existing Roadway N Cow Bayou to Sun Valley Blvd | $5,000,000 | Planned | ||
| Apr 6, 2027 estimated | 0015-09-207 | WilliamsonAustin | IH 35 | Traffic Control Devices Upgrades To Existing Computerized Transportation M SH 45 to SH 29 | $14,100,640 | Planned | ||
| Apr 6, 2027 estimated | 0015-10-073 | TravisAustin | IH 35 | Intersection & Operational Imprv Construct Direct Connectors SH 45N to Grand Avenue Parkway | $184,388,400 | Planned | ||
| Apr 6, 2027 estimated | 0035-04-040 | ConchoSan Angelo | US 83 | Safety Improvement Projects Hazard Elimination & Safety 1.2 miles S of US 87 to Menard County Line | $2,021,219 | Planned | ||
| Apr 6, 2027 estimated | 0043-05-115 | WilbargerWichita Falls | US 287 | Bridge Maintenance US 287 SB to at Condon Springs | $275,340 | Planned | ||
| Apr 6, 2027 estimated | 0043-05-116 | WilbargerWichita Falls | US 287 | Bridge Maintenance US 287 to at Condon Springs | $284,436 | Planned | ||
| Apr 6, 2027 estimated | 0043-05-117 | WilbargerWichita Falls | US 287 | Bridge Maintenance US 287 NB to at BNSF RR | $556,260 | Planned | ||
| Apr 6, 2027 estimated | 0043-05-118 | WilbargerWichita Falls | US 70 | Bridge Maintenance US 70/US 287 NB to at Bentley Street | $282,684 | Planned | ||
| Apr 6, 2027 estimated | 0043-05-119 | WilbargerWichita Falls | US 70 | Bridge Maintenance US 70/US 287 SB to at Bentley Street | $282,684 | Planned | ||
| Apr 6, 2027 estimated | 0052-07-067 | LubbockLubbock | US 84 | Safety Improvement Projects Rehabilitate Traffic Signal Intersection of to SL289 | $590,725 | Planned | ||
| Apr 6, 2027 estimated | 0055-08-120 | McLennanWaco | SS 298 | Widen Non-Freeway Construct New Road US 84 to SL 396 | $44,739,110 | Planned | ||
| Apr 6, 2027 estimated | 0069-02-033 | GlasscockSan Angelo | US 87 | Safety Improvement Projects Hazard Elimination & Safety .5 miles south of Howard County line to Sterling County Line | $1,016,839 | Planned | ||
| Apr 6, 2027 estimated | 0069-03-065 | SterlingSan Angelo | US 87 | Safety Improvement Projects Hazard Elimination & Safety GLASSCOCK COUNTY LINE to SH 158 | $2,857,409 | Planned | ||
| Apr 6, 2027 estimated | 0072-07-077 | BexarSan Antonio | IH 10 | Freeway Operational Improvements Widen Road - Add Lanes And Shoulders At FM 3351 (Ralph Fair Road) to . | $3,572,000 | Planned | ||
| Apr 6, 2027 estimated | 0109-04-030 | HoustonLufkin | BU 287 | Overlay Highway Improvement SL 304 (N) to Crockett Town Square | $1,852,200 | Planned | ||
| Apr 6, 2027 estimated | 0109-05-045 | HoustonLufkin | BS 19 | Overlay Highway Improvement Crockett Town Square to 0.6 mi N of FM 2110 | $404,400 | Planned | ||
| Apr 6, 2027 estimated | 0114-09-104 | WashingtonBryan | US 290 | Intersection & Operational Imprv Install Raised Median At FM 1948 to . | $1,400,000 | Planned | ||
| Apr 6, 2027 estimated | 0117-07-046 | HoustonLufkin | BS 7 | Overlay Highway Improvement SL 304 to Crockett Town Square | $670,903 | Planned | ||
| Apr 6, 2027 estimated | 0118-01-021 | HoustonLufkin | BS 21 | Overlay Highway Improvement Crockett Town Square to SL 304 | $881,600 | Planned | ||
| Apr 6, 2027 estimated | 0135-10-069 | DentonDallas | US 377 | Traffic Control Devices Traffic Signal Improvements at N. Bell Ave to in the City of Denton | $565,507 | Planned | ||
| Apr 6, 2027 estimated | 0146-07-035 | WilbargerWichita Falls | US 70 | Bridge Maintenance US 287 NB to at US 70 | $262,236 | Planned |
Advertised proposals and bid items: TxDOT Official and Unofficial Bid Items (data.texas.gov). Planned projects: TxDOT Projects Info service; their let dates are TxDOT estimates and often slip. Low bidders: TxDOT Bid Tabulations. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.