| Let date | CCSJ | County / District | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| Dec 1, 2027 estimated | 0001-04-115 | El PasoEl Paso | US 62 | Safety Improvement Projects Hazard Elimination & Safety AT DELTA DR to . | $387,188 | Planned | ||
| Dec 1, 2027 estimated | 0005-05-115 | HowardAbilene | IH 20 | Seal Coat Preventive Maintenance MARTIN CO LINE to 0.404 MILES EAST OF US 87 | $626,974 | Planned | ||
| Dec 1, 2027 estimated | 0005-07-060 | MitchellAbilene | IH 20 | Seal Coat Preventive Maintenance HOWARD CO LINE to FM 670 | $445,343 | Planned | ||
| Dec 1, 2027 estimated | 0006-01-105 | MitchellAbilene | IH 20 | Seal Coat Preventive Maintenance 0.168 MILES EAST OF SH 208 to NOLAN CO LINE | $447,777 | Planned | ||
| Dec 1, 2027 estimated | 0006-05-123 | TaylorAbilene | IH 20 | Seal Coat Preventive Maintenance 0.76 MILES EAST OF CR 287 to CATCLAW CREEK | $571,509 | Planned | ||
| Dec 1, 2027 estimated | 0006-06-116 | TaylorAbilene | IH 20 | Seal Coat Preventive Maintenance Catclaw Creek to BU 83 | $404,000 | Planned | ||
| Dec 1, 2027 estimated | 0006-07-086 | CallahanAbilene | IH 20 | Seal Coat Preventive Maintenance TAYLOR CO LINE to 0.095 MILES EAST OF BI 20-T | $664,676 | Planned | ||
| Dec 1, 2027 estimated | 0006-08-057 | NolanAbilene | SL 170 | Seal Coat Preventive Maintenance IH 20 NORTH FRONTAGE RD to BI 20-M | $36,872 | Planned | ||
| Dec 1, 2027 estimated | 0007-12-009 | CallahanAbilene | BI 20T | Seal Coat Preventive Maintenance IH 20 NFR (WEST OF BAIRD) to IH 20 NFR (EAST OF BAIRD) | $204,448 | Planned | ||
| Dec 1, 2027 estimated | 0010-12-078 | BowieAtlanta | US 67 | Bridge Replacement At Big Creek to . | $2,868,500 | Planned | ||
| Dec 1, 2027 estimated | 0013-11-007 | WiseFort Worth | BU 81E | Seal Coat US 287 to FM 3433 | $450,000 | Planned | ||
| Dec 1, 2027 estimated | 0013-12-008 | WiseFort Worth | BU 81C | Seal Coat US 81/287 N to US 81/287 S | $450,000 | Planned | ||
| Dec 1, 2027 estimated | 0014-10-080 | McLennanWaco | US 77 | Pedestrian, Sidewalks & Curb Ramps Bicycle And Pedestrian Improvements 18th Street to Traffic Circle | $1,314,103 | Planned | ||
| Dec 1, 2027 estimated | 0014-10-081 | McLennanWaco | BU 77L | Pedestrian, Sidewalks & Curb Ramps Bicycle And Pedestrian Improvements FM 434 to 18th Street | $2,628,205 | Planned | ||
| Dec 1, 2027 estimated | 0019-02-036 | JohnsonFort Worth | SH 171 | Seal Coat SH 174 to Hill County Line | $450,000 | Planned | ||
| Dec 1, 2027 estimated | 0027-12-168 | Fort BendHouston | IH 69 | Transportation Non-Roadway Install/Upgrade Roadway Lighting SS 529 to Harris County Line | $2,105,911 | Planned | ||
| Dec 1, 2027 estimated | 0027-13-247 | HarrisHouston | IH 69 | Transportation Non-Roadway Install/Upgrade Roadway Lighting Fort Bend County Line to SS 527 | $3,313,300 | Planned | ||
| Dec 1, 2027 estimated | 0033-06-127 | TaylorAbilene | US 83 | Seal Coat Preventive Maintenance US 83 to BI-20 | $178,054 | Planned | ||
| Dec 1, 2027 estimated | 0033-08-041 | TaylorAbilene | BU 83D | Seal Coat Preventive Maintenance US 83 to BI 20R | $1,415,864 | Planned | ||
| Dec 1, 2027 estimated | 0033-08-048 | TaylorAbilene | BU 83D | Seal Coat Preventive Maintenance BI 20-R to US 83 | $951,566 | Planned | ||
| Dec 1, 2027 estimated | 0035-03-056 | ConchoSan Angelo | US 83 | Seal Coat 11.453 MI S OF RUNNELS COUNTY LINE to PAVEMENT JOINT IN EDEN AT TRM 422+1.123 | $765,500 | Planned | ||
| Dec 1, 2027 estimated | 0039-10-096 | CameronPharr | SH 4 | Bridge Replacement SH 4, NBI#210310003910094 to @ Drainage Ditch | $3,579,328 | Planned | ||
| Dec 1, 2027 estimated | 0053-11-026 | MitchellAbilene | Seal Coat Preventive Maintenance NOLAN CO LINE to SCURRY CO LINE | $44,592 | Planned | |||
| Dec 1, 2027 estimated | 0072-08-148 | BexarSan Antonio | SL 345 | Safety Improvement Projects Hazard Elimination & Safety Datapoint Dr. to IH 410 | $948,661 | Planned | ||
| Dec 1, 2027 estimated | 0088-05-114 | VictoriaYoakum | US 59 | Overlay Resurface Roadway LP 463 to BU 59T | $4,175,000 | Planned | ||
| Dec 1, 2027 estimated | 0089-01-098 | VictoriaYoakum | US 59 | Overlay Resurface Roadway BU 59T to JACKSON C/L | $5,100,000 | Planned | ||
| Dec 1, 2027 estimated | 0089-07-145 | WhartonYoakum | US 59 | Freeway Operational Improvements Convert Non-Freeway CR 456 (Pierce) to BU 59 NORTH OF EL CAMPO | $223,653,607 | Planned | ||
| Dec 1, 2027 estimated | 0089-09-091 | Fort BendHouston | US 59 | Transportation Non-Roadway Install/Upgrade Roadway Lighting SS 529 to SS 10 (Hartledge Rd) | $280,788 | Planned | ||
| Dec 1, 2027 estimated | 0095-06-076 | Van ZandtTyler | US 80 | Seal Coat .955 E. OF SH 19 to .22 W. OF CR 3504 | $835,173 | Planned | ||
| Dec 1, 2027 estimated | 0095-06-077 | Van ZandtTyler | US 80 | Seal Coat SH 64 to W. OF EDGEWOOD | $1,053,366 | Planned | ||
| Dec 1, 2027 estimated | 0096-04-073 | GreggTyler | US 80 | Seal Coat SL 485 to LOCKERPLANT RD. | $245,864 | Planned | ||
| Dec 1, 2027 estimated | 0108-01-032 | Van ZandtTyler | SH 19 | Seal Coat IH 20 to SH 64 | $198,911 | Planned | ||
| Dec 1, 2027 estimated | 0108-05-020 | HendersonTyler | SH 19 | Seal Coat Coon Creek (0.08 mi. N. of CR 4612) to Bear Creek (0.62 mi. N. of Anderson CL) | $602,584 | Planned | ||
| Dec 1, 2027 estimated | 0110-04-227 | MontgomeryHouston | IH 45 | Traffic Control Devices Surfacing/Roadway Restoration Harris County Line to SL 336(S) | $760,500 | Planned | ||
| Dec 1, 2027 estimated | 0122-04-040 | AndersonTyler | US 287 | Seal Coat FM 321 to FREESTONE COUNTY LINE | $1,245,959 | Planned | ||
| Dec 1, 2027 estimated | 0123-01-040 | AndersonTyler | US 84 | Seal Coat SL 256 to Cherokee County Line | $1,267,347 | Planned | ||
| Dec 1, 2027 estimated | 0123-06-031 | RuskTyler | US 84 | Seal Coat SHELBY CL to 2ND STREET | $669,538 | Planned | ||
| Dec 1, 2027 estimated | 0134-06-055 | WiseFort Worth | FM 1810 | Seal Coat Jack County Line to FM 2952 | $450,000 | Planned | ||
| Dec 1, 2027 estimated | 0138-01-101 | GreggTyler | SH 31 | Seal Coat US 259 to SOUTH STREET | $1,084,289 | Planned | ||
| Dec 1, 2027 estimated | 0138-01-102 | GreggTyler | SH 31 | Seal Coat FM 349 to US 259 | $224,567 | Planned | ||
| Dec 1, 2027 estimated | 0138-01-103 | GreggTyler | US 259 | Seal Coat SH 31 to SH 31 | $182,947 | Planned | ||
| Dec 1, 2027 estimated | 0138-08-032 | GreggTyler | SH 31 | Seal Coat SOUTH ST. to US 80 | $83,511 | Planned | ||
| Dec 1, 2027 estimated | 0139-07-028 | PecosOdessa | US 285 | Bridge Maintenance AT FM 1776 to . | $701,415 | Planned | ||
| Dec 1, 2027 estimated | 0149-01-019 | KimbleSan Angelo | US 377 | Seal Coat 9.699 miles S of Menard County Line to US 83 | $632,000 | Planned | ||
| Dec 1, 2027 estimated | 0149-02-019 | KimbleSan Angelo | US 377 | Seal Coat MENARD COUNTY LINE to 9.699 MI S OF MENARD COUNTY LINE | $536,303 | Planned | ||
| Dec 1, 2027 estimated | 0149-03-015 | MenardSan Angelo | US 377 | Seal Coat McCULLOCH COUNTY LINE to KIMBLE COUNTY LINE | $163,784 | Planned | ||
| Dec 1, 2027 estimated | 0151-04-075 | WilliamsonAustin | US 183 | Overlay Resurface Roadway US 183A to San Gabriel Parkway | $942,460 | Planned | ||
| Dec 1, 2027 estimated | 0151-05-122 | WilliamsonAustin | US 183 | Overlay Resurface Roadway San Gabriel Parkway to Cedar Park Dr | $5,907,801 | Planned | ||
| Dec 1, 2027 estimated | 0157-06-004 | HaskellAbilene | BU 277E | Seal Coat Preventive Maintenance US 277 to US 277 | $84,574 | Planned | ||
| Dec 1, 2027 estimated | 0163-03-054 | HendersonTyler | SH 31 | Seal Coat 0.05 MI. W. OF STEEN CEMETARY RD. to 0.02 MI. W. OF SUNSET | $273,872 | Planned | ||
| Dec 1, 2027 estimated | 0163-04-064 | HendersonTyler | SH 31 | Seal Coat 0.33 MI W. OF SH 198 to 0.6 MI E. OF SH 198 | $179,235 | Planned | ||
| Dec 1, 2027 estimated | 0167-02-097 | El PasoEl Paso | BU 54A | Safety Improvement Projects Hazard Elimination & Safety AT AMEEN DR to . | $376,931 | Planned | ||
| Dec 1, 2027 estimated | 0171-04-088 | TarrantFort Worth | SH 199 | Safety Improvement Projects Drainage Improvements FM 730 to KATIE DR. | $4,200,000 | Planned | ||
| Dec 1, 2027 estimated | 0179-10-120 | CalhounYoakum | SH 35 | Bridge Maintenance @ Lavaca Bay to STR# 0179-10-061 | $3,955,306 | Planned | ||
| Dec 1, 2027 estimated | 0190-02-041 | WoodTyler | SH 37 | Seal Coat FRANKLIN CL to SH 54 | $1,588,996 | Planned | ||
| Dec 1, 2027 estimated | 0190-02-042 | WoodTyler | SH 37 | Safety Improvement Projects Traffic Signal Improvements SH 37 to AT SH 11 | $434,320 | Planned | ||
| Dec 1, 2027 estimated | 0190-03-090 | WoodTyler | SH 37 | Seal Coat SL 173 to SH 154 E. | $102,542 | Planned | ||
| Dec 1, 2027 estimated | 0191-05-008 | CherokeeTyler | FM 347 | Seal Coat US 69 to US 175 | $216,228 | Planned | ||
| Dec 1, 2027 estimated | 0198-01-036 | HendersonTyler | US 175 | Seal Coat LOOP 7 to FM 804 | $1,144,729 | Planned | ||
| Dec 1, 2027 estimated | 0198-04-048 | CherokeeTyler | FM 347 | Seal Coat US 175 to CHEROKEE ST | $6,335 | Planned | ||
| Dec 1, 2027 estimated | 0206-07-064 | RuskTyler | US 79 | Safety Improvement Projects Traffic Signal Improvements US 79 to at WEBSTER DR. | $368,263 | Planned | ||
| Dec 1, 2027 estimated | 0215-06-051 | KendallSan Antonio | SH 46 | Safety Improvement Projects Intersection Improvement 0.3 Mi. West of Truss Rd. to 0.6 Mi. East of Worth Rd. | $2,202,808 | Planned | ||
| Dec 1, 2027 estimated | 0220-04-050 | CameronPharr | US 281 | Widen Non-Freeway Widen Road - Add Lanes FM 732 to .5 Miles West of FM 1577 | $20,418,004 | Planned | ||
| Dec 1, 2027 estimated | 0228-01-060 | TerryLubbock | US 62 | Rehabilitation of Existing Road Rehabilitate Existing Roadway Gaines County Line to Wellman City Limits | $27,233,000 | Planned | ||
| Dec 1, 2027 estimated | 0228-01-066 | TerryLubbock | US 62 | Safety Improvement Projects Rehabilitate Existing Roadway Gaines County Line to FM41 (Wellman) | $2,497,509 | Planned | ||
| Dec 1, 2027 estimated | 0243-05-011 | JasperBeaumont | FM 2938 | Overlay Surfacing/Roadway Restoration SH 62 N, SOUTH to SH 62 S | $5,300,000 | Planned | ||
| Dec 1, 2027 estimated | 0245-02-036 | Van ZandtTyler | SH 64 | Seal Coat SH 19 to FM 16 | $475,432 | Planned | ||
| Dec 1, 2027 estimated | 0271-15-107 | HarrisHouston | IH 610 | Traffic Control Devices Install/Upgrade Roadway Lighting At Houston Ship Channel to . | $2,400,000 | Planned | ||
| Dec 1, 2027 estimated | 0275-02-074 | CarsonAmarillo | IH 40 | Safety Improvement Projects Hazard Elimination & Safety MM 87.27 to MM 87.5 | $1,000,000 | Planned | ||
| Dec 1, 2027 estimated | 0275-02-076 | CarsonAmarillo | IH 40 | Restoration Surfacing/Roadway Restoration MM 86 to MM 93.1 | $3,500,000 | Planned | ||
| Dec 1, 2027 estimated | 0275-03-073 | CarsonAmarillo | IH 40 | Restoration Hazard Elimination & Safety MM 93.1 to EAST FM 207 (MM 98) | $5,100,000 | Planned | ||
| Dec 1, 2027 estimated | 0318-02-028 | FisherAbilene | SH 92 | Seal Coat Preventive Maintenance SH 70 to Jones Co Line | $987,813 | Planned | ||
| Dec 1, 2027 estimated | 0318-05-026 | FisherAbilene | FM 611 | Seal Coat Preventive Maintenance SH 70 to FM 1614 | $273,763 | Planned | ||
| Dec 1, 2027 estimated | 0332-02-030 | MitchellAbilene | SH 208 | Seal Coat Preventive Maintenance SCURRY CO LINE to IH 20 FR | $348,087 | Planned | ||
| Dec 1, 2027 estimated | 0360-06-011 | FisherAbilene | FM 610 | Seal Coat Preventive Maintenance SH 70 to STONEWALL CO LINE | $53,496 | Planned | ||
| Dec 1, 2027 estimated | 0360-07-028 | StonewallAbilene | FM 610 | Seal Coat Preventive Maintenance FISHER CO LINE to US 83 | $470,349 | Planned | ||
| Dec 1, 2027 estimated | 0362-02-030 | Palo PintoFort Worth | SH 16 | Seal Coat US 180 to SH 254 | $450,000 | Planned | ||
| Dec 1, 2027 estimated | 0375-05-063 | EdwardsSan Angelo | RM 674 | Seal Coat US 377 to KINNEY COUNTY LINE | $1,003,386 | Planned | ||
| Dec 1, 2027 estimated | 0378-07-033 | CherokeeTyler | FM 347 | Seal Coat CHEROKEE ST to US 84 | $866,478 | Planned | ||
| Dec 1, 2027 estimated | 0380-18-014 | MidlandOdessa | SH 349 | Bridge Widening or Rehabilitation Bridge Maintenance AT SH 158 to . | $986,864 | Planned | ||
| Dec 1, 2027 estimated | 0384-01-028 | CaldwellAustin | SH 142 | Overlay Preventive Maintenance 1.0 MI SW of Valley Dr to 0.46 MI E of CR 108 | $3,830,851 | Planned | ||
| Dec 1, 2027 estimated | 0385-02-034 | HoodFort Worth | FM 4 | Seal Coat Palo Pinto CL to S of Aransas Ct. | $450,000 | Planned | ||
| Dec 1, 2027 estimated | 0385-03-037 | HoodFort Worth | FM 4 | Seal Coat S. of Aransas Ct. to FM 51 | $450,000 | Planned | ||
| Dec 1, 2027 estimated | 0391-06-026 | JackFort Worth | SH 148 | Seal Coat US 281 to Clay County Line | $450,000 | Planned | ||
| Dec 1, 2027 estimated | 0424-07-019 | SmithTyler | FM 2767 | Seal Coat SL 323 to GREGG CL | $1,210,888 | Planned | ||
| Dec 1, 2027 estimated | 0429-01-027 | WoodTyler | SH 182 | Seal Coat US 69 to SH 154 | $626,712 | Planned | ||
| Dec 1, 2027 estimated | 0441-09-055 | ReevesOdessa | IH 10 | Bridge Widening or Rehabilitation Bridge Maintenance AT HACKBERRY DRAW (4.5 MI E OF FM 3078) to . | $652,157 | Planned | ||
| Dec 1, 2027 estimated | 0454-02-059 | Tom GreenSan Angelo | SH 208 | Seal Coat CONCRETE PAVEMENT JOINT AT FM 2105 to MARTIN LUTHER KING DRIVE | $232,941 | Planned | ||
| Dec 1, 2027 estimated | 0454-06-010 | CokeSan Angelo | RM 1672 | Seal Coat SH 208 to SH 208 | $105,000 | Planned | ||
| Dec 1, 2027 estimated | 0458-01-029 | HendersonTyler | FM 59 | Seal Coat FM 753 to ANDERSON C/L | $515,248 | Planned | ||
| Dec 1, 2027 estimated | 0488-01-016 | NolanAbilene | FM 1856 | Seal Coat Preventive Maintenance IH 20 NFR to SH 70 | $238,956 | Planned | ||
| Dec 1, 2027 estimated | 0492-01-050 | SmithTyler | FM 14 | Seal Coat WOOD CL to US 271 | $1,163,247 | Planned | ||
| Dec 1, 2027 estimated | 0508-01-411 | HarrisHouston | IH 10 | Intersection & Operational Imprv Intersection Improvement At North Main Street in Baytown to . | $1,006,372 | Planned | ||
| Dec 1, 2027 estimated | 0518-01-018 | MitchellAbilene | FM 670 | Seal Coat Preventive Maintenance FM 1308 to BI 20-H | $114,851 | Planned | ||
| Dec 1, 2027 estimated | 0518-02-017 | MitchellAbilene | FM 670 | Seal Coat Preventive Maintenance IH 20 NFR to SH 163 | $221,912 | Planned | ||
| Dec 1, 2027 estimated | 0521-05-157 | BexarSan Antonio | IH 410 | Freeway Operational Improvements Intersection Improvements With Right And/Or Left T At Valley Hi Dr. to . | $57,025,027 | Planned | ||
| Dec 1, 2027 estimated | 0522-04-036 | SmithTyler | FM 16 | Seal Coat SH 110 to CORY RAY LN | $1,086,541 | Planned | ||
| Dec 1, 2027 estimated | 0539-04-041 | Palo PintoFort Worth | SH 254 | Seal Coat SL 397 to US 281 | $450,000 | Planned | ||
| Dec 1, 2027 estimated | 0539-05-017 | ParkerFort Worth | FM 1885 | Seal Coat Palo Pinto County Line to FM 52 | $450,000 | Planned | ||
| Dec 1, 2027 estimated | 0545-02-043 | RuskTyler | SH 42 | Seal Coat SH 135 to FM 2012 | $245,045 | Planned |
1–100 of 197Next ›
Advertised proposals and bid items: TxDOT Official and Unofficial Bid Items (data.texas.gov). Planned projects: TxDOT Projects Info service; their let dates are TxDOT estimates and often slip. Low bidders: TxDOT Bid Tabulations. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.