TxDOT Jobs

Aug 2027 · 133 jobs · $1,048,602,252 Sign up free
★ My Jobs

133 jobs · $1,048,602,252 estimated

ExcelCSV
Let date CCSJ County / District Highway Description Estimate Status Added Low bidder
Aug 1, 2027 estimated 0016-16-035 HaysAustin RM 967 Intersection & Operational Imprv Widen Road - Add Lanes FM 2770 to 0.051 Mi W of FM 2770 $877,735 Planned Nov 25 New
Aug 1, 2027 estimated 0190-02-040 WoodTyler SH 37 State Owned Rail Line Railroad Crossing Improvements at KCS RR Crossing to DOT 331567T $200,000 Planned Nov 25 New
Aug 1, 2027 estimated 0362-01-056 YoungWichita Falls SH 16 Traffic Control Devices Signal Improvements,Leds & Gps Clocks SH 16 to at Walmart Drive in Graham $94,000 Planned Nov 25 New
Aug 1, 2027 estimated 0684-01-068 CameronPharr SH 550 New Location Non-Freeway Construct New Toll Road .203 MI S OF FM 1847 to 1.13 MI SE OF UPRR OVRPSS @ FM 3248 $33,633,094 Planned Nov 25 New
Aug 1, 2027 estimated 0902-90-365 TarrantFort Worth CS 1093897 Rail Hwy Crossing Signals/Structures Railroad Crossing Improvements Railhead Rd to Railhead Rd $11,748 Planned Nov 25 New
Aug 1, 2027 estimated 0902-90-388 TarrantFort Worth CS 251003 Bridge Replacement Somerset Blvd to Saddlebrook Dr $3,900,000 Planned Nov 25 New
Aug 1, 2027 estimated 0918-24-315 CollinDallas CS 261455 Pedestrian, Sidewalks & Curb Ramps Construct Pedestrian Infrastructure Greenside Drive to Orchard Ridge Lane $1,296,500 Planned Nov 25 New
Aug 1, 2027 estimated 0918-47-523 DallasDallas CS 263473 New Location Non-Freeway Infrastructure Improvements Forest Theater Proximity; Bounded by to IH 45, SM Wright & Peabody Ave $1,500,000 Planned Nov 25 New
Aug 2, 2027 estimated 0016-02-176 HaysAustin IH 35 Culvert & Storm Drainage Work Drainage Improvements Briarwood CT to River Ridge Parkway $584,065 Planned Nov 25 New
Aug 2, 2027 estimated 0334-01-051 WilliamsonAustin FM 112 Rail Hwy Crossing Signals/Structures Railroad Crossing Improvements Rail Crossing AT FM 112 (UPRR) to DOT 416258U. $238,000 Planned Nov 25 New
Aug 2, 2027 estimated 0909-36-210 BellWaco CS 296457 Widen Non-Freeway Widen Road - Add Lanes SL 121 to West Avenue O $4,695,000 Planned Nov 25 New
Aug 2, 2027 estimated 0914-04-385 TravisAustin CS 258404 Safety Improvement Projects Highway Improvement Shady Lane to 0.04 mi West of Levander Loop $611,597 Planned Nov 25 New
Aug 2, 2027 estimated 1186-01-109 TravisAustin FM 969 Rail Hwy Crossing Signals/Structures Railroad Crossing Improvements Rail Crossing AT FM 969 (CMTY) to DOT 765567T. $266,800 Planned Nov 25 New
Aug 2, 2027 estimated 1755-01-028 WilliamsonAustin RM 1869 Rail Hwy Crossing Signals/Structures Railroad Crossing Improvements Rail Crossing AT RM 1869 to DOT 744802F. $132,400 Planned Nov 25 New
Aug 4, 2027 estimated 0053-20-008 NolanAbilene BU 84J Safety Improvement Projects Intersection Improvement US 84 to .25 MILES SOUTH OF US 84 $3,276,529 Planned Nov 25 New
Aug 4, 2027 estimated 0064-07-046 JasperBeaumont US 96 Safety Improvement Projects Hazard Elimination & Safety At FM 1007 to . $49,721 Planned Nov 25 New
Aug 4, 2027 estimated 0064-08-066 JasperBeaumont US 96 Safety Improvement Projects Hazard Elimination & Safety FM2800 to . $242,046 Planned Nov 25 New
Aug 4, 2027 estimated 0088-05-116 VictoriaYoakum US 59 Landscape & Scenic Enhancement Landscape Development 0.22 Mi West of SL 463 to 0.20 Mi East of SL 463 $262,019 Planned Nov 25 New
Aug 4, 2027 estimated 0091-05-082 CollinDallas SH 289 Restoration Repair Roadway PGBT to SH 121 $540,660 Planned Nov 25 New
Aug 4, 2027 estimated 0092-14-109 DallasDallas IH 45 Rehabilitation of Existing Road Rehabilitate Existing Roadway IH20 to SL12 $11,646,900 Planned Nov 25 New
Aug 4, 2027 estimated 0095-03-113 KaufmanDallas US 80 Rehabilitation of Existing Road Rehabilitate Existing Roadway Dallas County Line to FM 548 $348,030 Planned Nov 25 New
Aug 4, 2027 estimated 0095-04-082 KaufmanDallas US 80 Rehabilitation of Existing Road Rehabilitate Existing Roadway FM 548 to SS 557 $335,374 Planned Nov 25 New
Aug 4, 2027 estimated 0095-14-040 KaufmanDallas IH 20 Rehabilitation of Existing Road Rehabilitate Existing Roadway DALLAS COUNTY LINE to SS 557 $391,795 Planned Nov 25 New
Aug 4, 2027 estimated 0109-08-054 TrinityLufkin SH 19 Bridge Maintenance At Trinity River to . $1,442,308 Planned Nov 25 New
Aug 4, 2027 estimated 0109-08-055 TrinityLufkin SH 19 Bridge Maintenance At Trinity River to . $1,442,308 Planned Nov 25 New
Aug 4, 2027 estimated 0111-03-064 Fort BendHouston FM 521 Widen Non-Freeway Widen Road - Add Lanes CR 56 to SH 6 $91,039,029 Planned Nov 25 New
Aug 4, 2027 estimated 0115-03-028 CaldwellAustin FM 20 Intersection & Operational Imprv Intersection Improvement US 183 to TRINITY STREET $1,262,876 Planned Nov 25 New
Aug 4, 2027 estimated 0135-04-045 CollinDallas US 380 Restoration Repair Roadway SH 78 to Boorman Ln $540,660 Planned Nov 25 New
Aug 4, 2027 estimated 0135-05-034 CollinDallas US 380 Restoration Repair Roadway Hunt County Line to Hamilton Street $250,530 Planned Nov 25 New
Aug 4, 2027 estimated 0171-11-003 MadisonBryan SL 1853 New Location Non-Freeway New Arterial 0.2 Mi W of SH 90 to IH 45 $130,780,979 Planned Nov 25 New
Aug 4, 2027 estimated 0175-02-101 ShelbyLufkin US 84 Bridge Maintenance At Sabine River. to . $1,730,769 Planned Nov 25 New
Aug 4, 2027 estimated 0175-02-102 ShelbyLufkin US 84 Bridge Maintenance At Sabine River. to . $1,730,769 Planned Nov 25 New
Aug 4, 2027 estimated 0176-03-145 AngelinaLufkin US 59 Bridge Widening or Rehabilitation Bridge Maintenance US 59 at Neches River to . $960,714 Planned Nov 25 New
Aug 4, 2027 estimated 0195-02-091 DentonDallas IH 35 Widen Freeway Widen Road - Add Lanes N of FM 3163 to N of Rector $157,852,515 Planned Nov 25 New
Aug 4, 2027 estimated 0200-11-110 JeffersonBeaumont US 69 Safety Improvement Projects Hazard Elimination & Safety LNVA to IH0010 $450,000 Planned Nov 25 New
Aug 4, 2027 estimated 0220-04-049 CameronPharr US 281 Widen Non-Freeway Widen Road - Add Lanes .5 Miles West of FM 1577 to FM 1421 $27,388,925 Planned Nov 25 New
Aug 4, 2027 estimated 0233-05-039 CulbersonEl Paso SH 54 Rail Hwy Crossing Signals/Structures Railroad Crossing Improvements 1ST ST to ASTER ST $75,000 Planned Nov 25 New
Aug 4, 2027 estimated 0238-06-039 ShermanAmarillo US 54 Transportation Non-Roadway At CR 9 to . $20,500,000 Planned Nov 25 New
Aug 4, 2027 estimated 0245-05-054 SmithTyler Pedestrian, Sidewalks & Curb Ramps Construct Pedestrian Infrastructure Old Dallas Hwy to Entrada Ln $1,600,000 Planned Nov 25 New
Aug 4, 2027 estimated 0256-01-061 YoungWichita Falls SH 67 Bridge Maintenance SH 67 to at Brazos River $200,000 Planned Nov 25 New
Aug 4, 2027 estimated 0262-06-032 RobertsonBryan FM 391 Bridge Replacement AT LITTLE PIN OAK CREEK to . $2,350,000 Planned Nov 25 New
Aug 4, 2027 estimated 0262-06-034 RobertsonBryan FM 391 Right of Way AT LITTLE PIN OAK CREEK to . $2,350,000 Planned Nov 25 New
Aug 4, 2027 estimated 0305-03-047 NewtonBeaumont SH 87 Safety Improvement Projects Hazard Elimination & Safety At FM 1004 to . $41,744 Planned Nov 25 New
Aug 4, 2027 estimated 0306-03-137 JeffersonBeaumont SH 87 Safety Improvement Projects Hazard Elimination & Safety 0.1 MI NORTH OF 9TH AVENUE, SOUTH to 0.1 MI SOUTH OF 9TH AVENUE $145,271 Planned Nov 25 New
Aug 4, 2027 estimated 0307-01-156 JeffersonBeaumont SH 87 Safety Improvement Projects Hazard Elimination & Safety 0.1 MI NORTH OF SS 215, SOUTH to 0.1 MI SOUTH OF SS 215 $120,000 Planned Nov 25 New
Aug 4, 2027 estimated 0341-04-075 TylerBeaumont US 287 Safety Improvement Projects Hazard Elimination & Safety At FM 256 to . $104,910 Planned Nov 25 New
Aug 4, 2027 estimated 0353-03-116 TarrantFort Worth SH 114 Traffic Control Devices Install/Replace Signs Solana Blvd to Dallas County Line $419,875 Planned Nov 25 New
Aug 4, 2027 estimated 0353-05-135 DallasDallas SS 244 Safety Improvement Projects Construct Pedestrian Infrastructure Lake Highlands Dr. to SH-78 (Garland Rd.) $2,298,243 Planned Nov 25 New
Aug 4, 2027 estimated 0366-01-077 HaysAustin SH 123 Pedestrian, Sidewalks & Curb Ramps Construct Pedestrian Infrastructure IH 35 to DE ZAVALLA DR $875,000 Planned Nov 25 New
Aug 4, 2027 estimated 0432-02-100 VictoriaYoakum SH 185 Rail Hwy Crossing Signals/Structures Railroad Crossing Improvements @ US 87 to DOT 746562H $449,145 Planned Nov 25 New
Aug 4, 2027 estimated 0461-06-030 ParmerLubbock SH 214 Safety Improvement Projects Hazard Elimination & Safety Intersection of to SH86 $1,044,394 Planned Nov 25 New
Aug 4, 2027 estimated 0492-04-048 SmithTyler FM 346 Safety Improvement Projects Construct Pedestrian Infrastructure CR 2269 to FM 2964 $1,169,985 Planned Nov 25 New
Aug 4, 2027 estimated 0495-01-087 KaufmanDallas IH 20 Rehabilitation of Existing Road Rehabilitate Existing Roadway SS 557 to VAN ZANDT COUNTY LINE $518,650 Planned Nov 25 New
Aug 4, 2027 estimated 0508-04-192 JeffersonBeaumont SH 73 Safety Improvement Projects Hazard Elimination & Safety At TX 93 Spur to . $206,249 Planned Nov 25 New
Aug 4, 2027 estimated 0520-06-047 SmithTyler SH 155 Safety Improvement Projects Construct Pedestrian Infrastructure at BIG EDDY RD to in NOONDAY, TX $1,303,730 Planned Nov 25 New
Aug 4, 2027 estimated 0581-01-176 DallasDallas SL 12 Safety Improvement Projects Construct Pedestrian Infrastructure Jim Miller to Pemberton Hill Rd $826,733 Planned Nov 25 New
Aug 4, 2027 estimated 0581-02-165 DallasDallas SL 12 Rehabilitation of Existing Road Rehabilitate Existing Roadway SS 408 to SH 356 $9,350,883 Planned Nov 25 New
Aug 4, 2027 estimated 0593-01-140 LibertyBeaumont SH 321 Safety Improvement Projects Hazard Elimination & Safety At FM0163 to . $31,573 Planned Nov 25 New
Aug 4, 2027 estimated 0674-01-077 El PasoEl Paso FM 76 Rail Hwy Crossing Signals/Structures Railroad Crossing Improvements (FABENS) 0.07 MI N OF SH 20 to (FABENS) 0.07 MI N OF SH 20 $75,000 Planned Nov 25 New
Aug 4, 2027 estimated 0675-05-105 MadisonBryan IH 45 Interchange (New or Reconstructed) New Arterial 0.5 Mi S of SS 104 to US 190 $93,077,241 Planned Nov 25 New
Aug 4, 2027 estimated 0675-06-120 WalkerBryan IH 45 Widen Freeway Widen Road - Add Lanes 1.4 Mi N of SH 75 to 0.7 Mi S of FM 1696 $130,017,833 Planned Nov 25 New
Aug 4, 2027 estimated 0688-02-066 LamarParis FM 79 Safety Improvement Projects Hazard Elimination & Safety Fannin Co Line to SL 286 $3,939,478 Planned Nov 25 New
Aug 4, 2027 estimated 0697-02-067 HendersonTyler SH 198 Safety Improvement Projects Construct Pedestrian Infrastructure at SH 334 to in GUN BARREL CITY, TX $1,350,352 Planned Nov 25 New
Aug 4, 2027 estimated 0730-03-033 LamarParis FM 905 Widen Non-Freeway Widen Road - Add Shoulders Loop 286 to FM 3426 $8,862,453 Planned Nov 25 New
Aug 4, 2027 estimated 0740-02-030 FloydLubbock FM 1065 Safety Improvement Projects Intersection Improvement Intersection of to FM97 $351,904 Planned Nov 25 New
Aug 4, 2027 estimated 0861-02-020 WillacyPharr FM 491 Safety Improvement Projects Hazard Elimination & Safety FM 2845 to BUS 77 $2,711,468 Planned Nov 25 New
Aug 4, 2027 estimated 0872-04-035 CameronPharr FM 506 Safety Improvement Projects Hazard Elimination & Safety Fleetwood Ave. to Feather St. $314,622 Planned Nov 25 New
Aug 4, 2027 estimated 0883-02-097 OrangeBeaumont FM 408 Safety Improvement Projects Hazard Elimination & Safety 0.07 MI E of Inez Avenue to 0.20 MI W of Inez Avenue $61,394 Planned Nov 25 New
Aug 4, 2027 estimated 0902-90-312 TarrantFort Worth CS 250508 Traffic Control Devices Install Traffic Signal LAMAR BOULEVARD to . $1,071,304 Planned Nov 25 New
Aug 4, 2027 estimated 0902-90-313 TarrantFort Worth CS 250263 Traffic Control Devices Install Traffic Signal .1 mi East of Madison to .1 mi. West of Madison $951,318 Planned Nov 25 New
Aug 4, 2027 estimated 0902-90-314 TarrantFort Worth CS 250554 Traffic Control Devices Install Traffic Signal WOODLAND PARK BOULEVARD to . $1,458,216 Planned Nov 25 New
Aug 4, 2027 estimated 0905-06-119 LubbockLubbock CR 15208082 Pedestrian, Sidewalks & Curb Ramps Bicycle And Pedestrian Improvements Woodrow Rd.- FM 1730 (Slide Rd) to Indiana Ave $1,161,329 Planned Nov 25 New
Aug 4, 2027 estimated 0908-33-118 TaylorAbilene CS 253733 Safety Improvement Projects Traffic Signal Improvements At N 3rd St to Intersection $613,311 Planned Nov 25 New
Aug 4, 2027 estimated 0909-22-192 McLennanWaco CS 1168148 Bridge Replacement .1 Mi S of Navarro Avenue to .1 Mi N of Navarro Avenue $455,100 Planned Nov 25 New
Aug 4, 2027 estimated 0909-22-205 McLennanWaco CR 16101012 Bridge Replacement S FK Cow BYU #69 to S FK Cow BYU #69 $689,000 Planned Nov 25 New
Aug 4, 2027 estimated 0909-22-208 McLennanWaco CR 16109531 Bridge Replacement Shaw Creek #2018 to Shaw Creek #2018 $419,000 Planned Nov 25 New
Aug 4, 2027 estimated 0909-22-209 McLennanWaco CR 16100744 Bridge Replacement Bluff Creek #532 to Bluff Creek #532 $739,000 Planned Nov 25 New
Aug 4, 2027 estimated 0909-22-210 McLennanWaco CR 16100744 Bridge Replacement @ Tonk Creek to @ Tonk Creek $845,000 Planned Nov 25 New
Aug 4, 2027 estimated 0909-38-093 FallsWaco CR 7400358 Bridge Replacement @ N ELM CRK BR to (MAP #2088) $492,540 Planned Nov 25 New
Aug 4, 2027 estimated 0909-38-104 FallsWaco CR 7400408 Bridge Replacement @ Perry Creek #2054 to @ Perry Creek #2054 $599,000 Planned Nov 25 New
Aug 4, 2027 estimated 0909-39-141 CoryellWaco FD 704109 Military Bases and Federal Campus Reconstruct Existing Roadway OLD GEORGETOWN RD to N CLARKE RD $14,000,000 Planned Nov 25 New
Aug 4, 2027 estimated 0909-40-082 LimestoneWaco CR 152 Bridge Replacement @ NAVASOTA RIVER TRIBUTARY to (MAP #208) $463,420 Planned Nov 25 New
Aug 4, 2027 estimated 0909-40-087 LimestoneWaco CR 14700609 Bridge Replacement @ ELM CRK TRIB to (MAP #100) $480,450 Planned Nov 25 New
Aug 4, 2027 estimated 0909-40-091 LimestoneWaco CR 14700412 Bridge Replacement @ NAVASOTA RIVER TRIBUTARY to (MAP #201) $553,846 Planned Nov 25 New
Aug 4, 2027 estimated 0909-40-093 LimestoneWaco CR 633 Bridge Replacement @ ROCKY CREEK to (MAP #105) $429,360 Planned Nov 25 New
Aug 4, 2027 estimated 0909-40-097 LimestoneWaco CR 14700208 Bridge Replacement .1 Miles S of Daniel Branch to .1 Miles N of Daniel Branch $539,000 Planned Nov 25 New
Aug 4, 2027 estimated 0911-08-067 NacogdochesLufkin CR 17400765 Bridge Replacement CR 765 to At Bayou Loco $724,116 Planned Nov 25 New
Aug 4, 2027 estimated 0911-08-068 NacogdochesLufkin CR 17400724 Bridge Replacement CR 724 to At Alazan Bayou. $679,358 Planned Nov 25 New
Aug 4, 2027 estimated 0911-08-072 NacogdochesLufkin CR 17400849 Bridge Replacement CR 849 to At Caney Creek. $861,548 Planned Nov 25 New
Aug 4, 2027 estimated 0911-08-074 NacogdochesLufkin CR 17400836 Bridge Replacement CR 836 to At Trib of Bayou Loco. $765,620 Planned Nov 25 New
Aug 4, 2027 estimated 0911-08-075 NacogdochesLufkin CR 17400820 Bridge Replacement CR 820 to At Morral Bayou. $1,104,255 Planned Nov 25 New
Aug 4, 2027 estimated 0914-04-420 TravisAustin Preliminary Engineering Engineering Design/Study E Cesar Chavez St to Oltorf Street $1,687,131 Planned Nov 25 New
Aug 4, 2027 estimated 0914-05-267 WilliamsonAustin CS 266985 Safety Improvement Projects Hazard Elimination & Safety at Ridgmar Rd to . $1,034,593 Planned Nov 25 New
Aug 4, 2027 estimated 0916-28-087 San PatricioCorpus Christi CR 20500081 Bridge Replacement AA00-81 Drainage Ditch to 1.00 MI S of SH 188 $700,000 Planned Nov 25 New
Aug 4, 2027 estimated 0917-18-087 RobertsonBryan CR 19800338 Bridge Replacement ON CR 338 (CAMP CR CEMETERY RD, F-CR386) to AT CAMP CREEK $950,000 Planned Nov 25 New
Aug 4, 2027 estimated 0921-02-530 HidalgoPharr CS 265702 Safety Improvement Projects Hazard Elimination & Safety IH 2 E.B. Frtg. Rd. to BUS 83 $609,335 Planned Nov 25 New
Aug 4, 2027 estimated 0922-10-040 MaverickLaredo CS 297328 Bridge Replacement Bridge Maintenance CHERRY LEAF DR to . $811,379 Planned Nov 25 New
Aug 4, 2027 estimated 0922-10-041 MaverickLaredo CS 265793 Bridge Replacement Bridge Maintenance QUARRY ST to . $856,920 Planned Nov 25 New
Aug 4, 2027 estimated 0922-21-004 KinneyLaredo CS 1031151 Bridge Replacement Bridge Maintenance EL PASO ST to . $578,709 Planned Nov 25 New
Aug 4, 2027 estimated 0923-09-070 EastlandBrownwood CR 6800336 Bridge Replacement CR 336 AT COLONY CREEK to . $900,000 Planned Nov 25 New
1–100 of 133Next ›

Advertised proposals and bid items: TxDOT Official and Unofficial Bid Items (data.texas.gov). Planned projects: TxDOT Projects Info service; their let dates are TxDOT estimates and often slip. Low bidders: TxDOT Bid Tabulations. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.