CCSJ 6504-82-001

Waco · McLennan Sign up free

‹ All TxDOT jobs My Jobs

Routine Maintenance Project - Sealed

Official
Let date
Tuesday, December 1, 2026
Bids open
Dec 1, 2026 1:00 PM
District
Waco
County
McLennan
Highway
SH0006
Project number
RMC - A00222910
Let type
Statewide Let
Bid type
Low Bid
Project ID
A00222910
Added
Nov 5, 2026
SeqBid codeDescriptionQuantityUnitAvg low price
1 416-7007 DRILL SHAFT (42 IN)DRILLED SHAFT FOUNDATIONS 266LF $318.92
2 432-7001 RIPRAP (CONC)(4 IN)RIPRAP 17.5CY $573.24
3 500-7001 MOBILIZATION 1LS $523,850.32
4 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLINGBARRICADES, SIGNS, AND TRAFFIC HANDLING 8MO $11,585.04
5 505-7001 TMA (STATIONARY)TRUCK-MOUNTED ATTENUATOR (TMA) AND TRAILER ATTENUATOR (TA) 75DAY $217.57
6 618-7036 CONDT (PVC) (SCH 40) (3")CONDUIT 3,330LF $15.29
7 618-7061 CONDT (PVC) (SCH 80) (3") (BORE)CONDUIT 1,480LF $26.77
8 618-7090 CONDUIT (PREPARE)CONDUIT 360LF $3.08
9 620-7003 ELEC CONDR (NO.12) BAREELECTRICAL CONDUCTORS 4,015LF $1.32
10 620-7004 ELEC CONDR (NO.12) INSULATEDELECTRICAL CONDUCTORS 8,160LF $1.64
11 620-7005 ELEC CONDR (NO.10) BAREELECTRICAL CONDUCTORS 330LF $1.84
12 620-7006 ELEC CONDR (NO.10) INSULATEDELECTRICAL CONDUCTORS 650LF $2.59
13 620-7007 ELEC CONDR (NO.8) BAREELECTRICAL CONDUCTORS 4,080LF $1.94
14 620-7009 ELEC CONDR (NO.6) BAREELECTRICAL CONDUCTORS 310LF $2.23
15 620-7010 ELEC CONDR (NO.6) INSULATEDELECTRICAL CONDUCTORS 625LF $2.58
16 624-7002 GROUND BOX TY A (122311)W/APRONGROUND BOXES 40EA $1,460.15
17 628-7121 ELC SRV TY D 120/240 060(NS)AL(E)SP(O)ELECTRICAL SERVICES 14EA $8,107.50
18 684-7029 TRF SIG CBL (TY A)(14 AWG)(3 CONDR)TRAFFIC SIGNAL CABLES 990LF $1.99
19 684-7031 TRF SIG CBL (TY A)(14 AWG)(5 CONDR)TRAFFIC SIGNAL CABLES 990LF $2.96
20 684-7033 TRF SIG CBL (TY A)(14 AWG)(7 CONDR)TRAFFIC SIGNAL CABLES 860LF $3.51
21 684-7038 TRF SIG CBL (TY A)(14 AWG)(12 CONDR)TRAFFIC SIGNAL CABLES 270LF $5.31
22 684-7042 TRF SIG CBL (TY A)(14 AWG)(16 CONDR)TRAFFIC SIGNAL CABLES 230LF $6.03
23 690-7009 REMOVAL OF CABLESMAINTENANCE OF TRAFFIC SIGNALS AND ILLUMINATION 5,485LF $0.8964
24 690-7039 REPLACE OF CONTROL CABINET(GRND MNT)MAINTENANCE OF TRAFFIC SIGNALS AND ILLUMINATION 1EA $6,196.97
25 5061-7001 SUBSURFACE UTIL LOCATE (NON-PAVED AREA)SUBSURFACE UTILITY LOCATE 10EA $920.62
26 6006-7017 VIVDS PROS CABINET EQUIP (REMOVE)VIDEO IMAGING VEHICLE DETECTION SYSTEM 1EA $354.29
27 6006-7018 VIVDS CAM ASSY (REMOVE)VIDEO IMAGING VEHICLE DETECTION SYSTEM 4EA $320.43
28 6006-7020 VIVDS CABLING (REMOVE)VIDEO IMAGING VEHICLE DETECTION SYSTEM 590LF $1.09
29 6007-7001 BBU SYSTEM (EXTERNAL BATTERY CABINET)BATTERY BACK-UP SYSTEM FOR SIGNAL CABINETS 1EA $9,205.72
30 6008-7003 RVDS (PRESENCE AND ADVANCE DETECTION)RADAR VEHICLE DETECTION SYSTEM FOR SIGNALIZED INTERSECTION CONTROL 4EA $10,685.77
31 6011-7005 ITS POLE (50 FT) (90 MPH)INTELLIGENT TRANSPORTATION SYSTEM (ITS) POLE WITH CABINET 14EA $19,425.70
32 6011-7017 ITS POLE MNT CAB (TY 1)(CONF 2)INTELLIGENT TRANSPORTATION SYSTEM (ITS) POLE WITH CABINET 14EA $7,082.95
33 6013-7006 GROUND BOX (PREPARE)PREPARATION OF EXISTING GROUND BOXES AND MANHOLES 5EA $385.19
34 6018-7001 CCTV FIELD EQUIP (DIGITAL) (INSTL ONLY)DIGITAL CLOSED-CIRCUIT TELEVISION (CCTV) FIELD EQUIPMENT 14EA $1,302.20
35 6018-7004 ITS COM CBL (ETHERNET)DIGITAL CLOSED-CIRCUIT TELEVISION (CCTV) FIELD EQUIPMENT 840LF $3.41
36 7010-7001 MAINTENANCE SPEED LIMIT SIGNING 10EA $36.55

Pre-bid questions 18

Work Order Process and Execution Details Nov 10, 2026

Q: Please clarify whether this project will be executed through individual Work Orders. If so, please provide additional details regarding the Work Order process, including the expected duration of each Work Order, the anticipated number of Work Orders, and how the scope and locations of work will be assigned.

A: This is a site-specific contract and work orders are not issued. · Carmen Chau

Missing Bore run Nov 11, 2026

Q: After looking through the plans, I've only confirmed a total 1375 LF in the plan drawings out of the 1480 LF listed in the proposal quantities.

The summary table on Sheet 5 (Sheet 9 of the .pdf) lists 1335 LF for the ITS Maintenance and 145 LF for the Signal Maintenance. I've confirmed 1230 LF of the 1335 LF of the ITS Maintenance quantities and all 145 LF for the Signal Maintenance.

Is 1375 LF the actual total quantity for the 3" Sch 80 Bore PVC Conduit or are the plans missing 105 LF from one of the ITS Maintenance pages?

A: There is a minor error that has been noted with bore quantities. Any overruns or underruns will be handled in accordance with Item 4. · Carmen Chau

Missing Bore run Nov 13, 2026

Q: Can you link this Item 4 that you mentioned?

A: Refer to TXDOT’s Standard Specifications for Construction and Maintenance of Highways, Streets, and Bridges, 2024 Edition. Item 4 is within, along with other pertinent information. See attached. · Carmen Chau

Item 5061-7002 SUBSURFACE UTIL LOCATE (PAVED AREA) Nov 13, 2026

Q: On Sheet 54 (Sheet 58 of the .pdf), Item 5061-7002 SUBSURFACE UTIL LOCATE (PAVED AREA) is listed at a quantity of 1. However, this item is not listed in the proposal. Will this be added in an addendum?

A: Please bid as shown. Any alleged plan discrepancies will be addressed after contract begins with Item 4. · Carmen Chau

ITEM 6013-7006 GROUND BOX (PREPARE) Nov 13, 2026

Q: The GROUND BOX (PREPARE) item is listed in the proposal and the consolidated summary as a quantity of 5, but is not reflected in the plan drawings in the Signal Maintenance section. Will this discrepancy be addressed in an addendum?

A: Please bid as shown. Any alleged plan discrepancies will be addressed after contract begins with Item 4. · Carmen Chau

ITEM 6008-7003 RVDS (PRESENCE AND ADVANCE DETECTION) Nov 13, 2026

Q: ITEM 6008-7003 RVDS (PRESENCE AND ADVANCE DETECTION) is listed in the proposal and the consolidated summary as a quantity of 4, but is not reflected in the plan drawings in the signal maintenance section. Will this discrepancy be addressed in an addendum?

A: Please bid as shown. Any alleged plan discrepancies will be addressed after contract begins with Item 4. · Carmen Chau

ITEM 5061-7001 SUBSURFACE UTIL LOCATE (NON-PAVED AREA) Nov 13, 2026

Q: ITEM 5061-7001 SUBSURFACE UTIL LOCATE (NON-PAVED AREA) is listed in the proposal and the consolidated summary as a quantity of 10, but it is only shown in the plan drawings as a quantity of 1 in the signal maintenance section. Will this discrepancy be addressed in an addendum?

A: Please bid as shown. Any alleged plan discrepancies will be addressed after contract begins with Item 4. · Carmen Chau

ELEC CONDR (NO. 12) BARE, ELEC CONDR (NO. 6) BARE, ELEC CONDR (NO. 6) INSULATED Nov 13, 2026

Q: There is an overrun of 65 LF for the ELEC CONDR (NO. 12) BARE, an underrun of 5 LF for the ELEC CONDR (NO. 6) BARE, and an underrun of 10 LF for the ELEC CONDR (NO. 6) INSULATED. Will these inconsistencies be addressed in an addendum?

A: Please bid as shown. Any alleged plan discrepancies will be addressed after contract begins with Item 4. · Carmen Chau

RFI – Item 60077001 – BBU SYSTEM (EXTERNAL BATTERY CABINET) Nov 16, 2026

Q: 1. Is the External Battery Cabinet intended to be a separate stand-alone cabinet, attached to the controller cabinet, or integrated within the provided cabinet?

2. Can you provide a typical detail, drawing, or photo showing the intended BBU System configuration?

3. Will you furnish any portion of the BBU System (cabinet, batteries, charger, etc.), or is the Contractor responsible for providing the complete system under this item?

A: Refer to Item Description and Special Specification 6007 for cabinet configuration. See Material Producer List (MPL) for pre-qualified products. Contractor is responsible for all equipment and installation for a complete system. · Carmen Chau

6907039 (REPLACE OF CONTROL CABINET - GRND MNT) Nov 16, 2026

Q: Please clarify what is included under Item 6907039. Does the cabinet replacement include only the cabinet enclosure, or also the controller, MMU, detector cards, communications equipment, foundation, wiring, equipment transfer, and all associated installation and testing required for a complete operational system?

A: Item 690-7039 includes all signal components, wiring, and incidentals within the cabinet. · Carmen Chau

RFI – Item 60077001 – BBU SYSTEM (EXTERNAL BATTERY CABINET) Nov 16, 2026

Q: The specifications do not indicate whether the External Battery Cabinet is intended to be mounted as a standalone cabinet, physically attached to the controller cabinet, or integrated within the cabinet assembly. Please clarify the intended configuration, as this information is required to determine whether conduit, wiring, and interconnections between the cabinet and the BBU system should be included within the pad installation scope.

A: Refer to Special Specification 6007 in Proposal. The External Battery Cabinet is attached to the side of the cabinet. · Carmen Chau

TMA Duration Nov 19, 2026

Q: Why is the TMA 8 months if the project only last 6 months?

A: This contract is 120 working days.  The 8-months of Barricades, Signs, and Traffic Handling is based on 15 working days each month for 8-months.  The 75 working days for the TMA is estimated on 15 working days each month for 5-months. · Carmen Chau

Controler Intersection Nov 19, 2026

Q: Could i know if the controler is gonna be provided by TxDOT, if it is existing, or if should we provide it.

A: Refer to General Note Sheet 3D, TxDOT furnishes the signal controller/cabinet. · Carmen Chau

Project Limits Nov 19, 2026

Q: Will TXDOT be requiring project limits and all side roads or off & on ramps to be signed at each ITS install location.

A: See Item 502 on plan sheet 3B – Project limit signs will not be required for this project. · Carmen Chau

Project Limits Nov 19, 2026

Q: Is TXDOT requiring the maintenance speed zone signs to be installed at 10 of the 14 ITS locations or is if needs be?

A: As required. · Carmen Chau

TMA Duration Nov 20, 2026

Q: Could you please confirm how the monthly payment period is defined? If the payment is made on a calendar-month basis, does the period always run from the 1st day of each month, or does the monthly cycle start from the date the works/project activities begin?

A: Refer to Standard Specification Item 9, Measurement and Payment. · Carmen Chau

Acceptance of Alternative Equivalent to Specified Smart Micro Device Nov 23, 2026

Q: The Contract Documents specify the use of a Smart Micro unit. Would TxDOT consider an alternative manufacturer’s system acceptable if it meets the same technical, functional, and performance requirements as the specified Smart Micro device? If so, please confirm the process and documentation required for review and approval of the proposed equivalent product.

A: Any deviations from the Smartmicro Type 48 Stream (Presence & Advance Detection) must be approved by the District prior to installation.  For substitutions to be considered, the submittal package must include the technical specification sheets with the functional/performance requirements meeting or exceeding Special Specification 6008 and must be compatible with existing infrastructure. · Carmen Chau

Clarification of Maintenance Speed Limit Signing Locations Nov 23, 2026

Q: Bid Item 70107001 – Maintenance Speed Limit Signing includes a quantity of 10 EA. The specification indicates that these signs are associated with work zones.

Could TxDOT please identify the anticipated work zone locations where these signs are expected to be deployed, or provide the estimated areas used to establish the quantity of 10 units? This information is requested to better understand the intended distribution and usage of the signs throughout the project.

A: Refer to sheets 19-20 (Maintenance Work Zone Speed Limit Standard Sheets) for the listing of signs required and additional information on placement and covering of signs. The maintenance work zone factors include the type of work and current speed limit. The expected application for this contract is ITS pole installations adjacent to the main lanes of IH 35. · Carmen Chau

From TxDOT's Pre-bid Question and Answer data. Answers become part of the proposal; check the official packet before bidding.