Bid tab 0910-00-147

Let May 2, 2025 · Tyler · Smith Sign up free

‹ May 2025 results

FY 27 RR Bridges @ Various Locations

Let date
Friday, May 2, 2025
CCSJ
0910-00-147
District
Tyler
County
Smith
Highway
Various
Limits
RR Bridges to @ Various Locations
Classification
Bridge Widening or Rehabilitation · Construction
Project number
BR 2025(709)
Working days
183
DBE goal
4%

Bidders 5

#ContractorTotal bidvs estimatevs low
EEEngineer's estimate$3,032,844
1 BUILT RIGHT CONSTRUCTION OF OKLAHOMA, LLC Low bidder $2,796,332 -7.8%
2 STRUCTURAL INTEGRITY GROUP LLC $2,888,577 -4.8% +3.3%
3 GIBSON & ASSOCIATES, INC. $3,159,054 +4.2% +13.0%
4 EAST TEXAS BRIDGE, INC. $3,929,900 +29.6% +40.5%
5 HIGHWAY 19 CONSTRUCTION LLC $4,743,295 +56.4% +69.6%

Bid tab: unit prices 55 items

ExcelCSV
SeqBid codeDescriptionQtyUnitEstimate #1 BUILT RIGHT CON…#2 STRUCTURAL INTE…#3 GIBSON & ASSOCI…#4 EAST TEXAS BRID…#5 HIGHWAY 19 CONS…
1104-7007 REMOV CONC (RIPRAP)1,310CY $58.00 $10.00 $50.00 $10.00 $50.00 $35.00
2104-7009 REMOV CONC (MEDIANS)9.3CY $81.00 $20.00 $55.00 $250.00 $400.00 $180.00
3132-7005 EMBANK (FNL)(OC)(TY C)20CY $47.50 $125.00 $185.00 $100.00 $200.00 $100.00
4354-7039 PLANE ASPH CONC PAV(2" TO 4")1,219SY $10.00 $25.00 $22.50 $10.98 $30.00 $25.00
5401-7001 FLOWABLE BACKFILL17CY $350.00 $400.00 $705.00 $900.00 $500.00 $350.00
6420-7010 CL B CONC (FLUME)40CY $574.00 $700.00 $855.00 $1,150.00 $1,000.00 $750.00
7428-7001 PENETRATING CONCRETE SURFACE TREATMENT19,073SY $12.50 $17.00 $11.25 $14.50 $15.00 $25.00
8429-7001 CONC STR REPAIR(CLEAN & COAT WTH EPOXY)138SF $250.00 $325.00 $135.00 $195.00 $350.00 $35.00
9429-7002 CONC STR REPAIR (EPOXY MORTAR)4SF $200.00 $325.00 $1,000.00 $1,050.00 $650.00 $1,500.00
10429-7003 CONC STR REPAIR(DECK REP(PART DEPTH))20SF $260.56 $325.00 $200.00 $300.00 $300.00 $350.00
11429-7005 CONC STR REPAIR(DECK REP (FULL DEPTH))72SF $176.00 $325.00 $190.00 $300.00 $350.00 $550.00
12429-7007 CONC STR REPAIR (VERTICAL & OVERHEAD)20SF $450.00 $325.00 $240.00 $300.00 $400.00 $350.00
13429-7009 CONC STR REPAIR (STANDARD)8SF $100.00 $300.00 $220.00 $300.00 $400.00 $180.00
14432-7007 RIPRAP (CONC) (CL B) (4 IN)348CY $1,239.00 $700.00 $540.00 $530.20 $900.00 $900.00
15432-7013 RIPRAP (MOW STRIP)(4 IN)104.3CY $670.00 $750.00 $610.00 $671.00 $775.00 $550.00
16432-7043 RIPRAP (STONE PROTECTION)(18 IN)280CY $220.00 $250.00 $310.00 $255.20 $250.00 $200.00
17438-7004 CLEANING AND SEALING EXIST JOINTS (CL3)202LF $59.25 $60.00 $53.00 $27.50 $65.00 $75.00
18438-7007 CLEANING AND SEALING EXIST JOINTS (CL7)1,874LF $80.00 $60.00 $67.00 $44.00 $75.00 $75.00
19438-7009 RESIZING AND SEALING JOINTS160LF $105.00 $55.00 $56.00 $132.00 $75.00 $55.00
20439-7004 CONCRETE OVERLAY (3 IN)1,219SY $67.00 $130.00 $100.00 $170.00 $85.00 $150.00
21439-7014 MULTI-LAYER POLYMER OVERLAY9,238SY $50.00 $50.00 $43.00 $38.50 $45.00 $155.00
22439-7015 POLYESTER POLYMER CONC OVERLAY (3/4")1,247SY $171.95 $110.00 $185.00 $135.00 $200.00 $245.00
23483-7008 HYDRO-DEMOLITION (1 IN)1,219SY $75.00 $85.00 $70.00 $165.00 $90.00 $85.00
24483-7016 SHOT BLASTING10,485SY $15.00 $4.00 $4.00 $6.50 $10.00 $15.00
25495-7002 RAISING EXIST STRUCT1EA $50,000.00 $75,000.00 $18,200.00 $78,000.00 $60,000.00 $60,000.00
26500-7001 MOBILIZATION1LS $275,713.10 $155,000.00 $325,000.00 $388,000.00 $385,000.00 $303,000.00
27502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING10MO $10,012.24 $5,000.00 $14,000.00 $16,000.00 $25,000.00 $10,000.00
28503-7002 PORTABLE CHANGEABLE MESSAGE SIGN4EA $15,000.00 $2,500.00 $15,000.00 $18,000.00 $25,000.00 $15,000.00
29505-7001 TMA (STATIONARY)216DAY $210.00 $50.00 $10.00 $360.00 $250.00 $500.00
30505-7002 TMA (MOBILE OPERATION)264HR $86.33 $50.00 $10.00 $40.00 $50.00 $100.00
31510-7001 ONE-WAY TRAF CONT (FLAGGER CONT)352HR $57.42 $5.00 $35.00 $50.00 $150.00 $275.00
32540-7002 MTL W-BEAM GD FEN (STEEL POST)1,775LF $42.50 $36.00 $33.35 $29.43 $36.00 $35.00
33540-7005 MTL BEAM GD FEN TRANS (THRIE-BEAM)7EA $2,500.00 $3,200.00 $2,575.00 $1,925.00 $3,000.00 $3,500.00
34540-7015 DOWNSTREAM ANCHOR TERMINAL SECTION4EA $1,500.00 $2,000.00 $1,865.00 $1,375.00 $1,800.00 $2,850.00
35542-7001 REMOVE METAL BEAM GUARD FENCE1,800LF $2.67 $5.00 $4.00 $4.68 $4.00 $5.00
36542-7003 REMOVE DOWNSTREAM ANCHOR TERMINAL4EA $418.60 $400.00 $280.00 $357.50 $250.00 $350.00
37544-7001 GUARDRAIL END TREATMENT (INSTALL)3EA $3,625.00 $4,000.00 $3,415.00 $3,465.00 $3,600.00 $3,500.00
38544-7003 GUARDRAIL END TREATMENT (REMOVE)3EA $850.00 $500.00 $364.00 $550.00 $300.00 $250.00
39666-7266 RE PROFILE PM TY I(W)6"(SLD)(100MIL)1,280LF $1.50 $6.00 $5.60 $5.50 $6.00 $5.00
40666-7270 RE PROFILE PM TY I(Y)6"(SLD)(100MIL)1,280LF $1.50 $6.00 $5.60 $5.50 $6.00 $5.00
41666-7347 PAVEMENT SLER 6"16,031LF $0.5000 $0.7500 $0.5600 $0.5500 $0.6000 $1.00
42666-7408 REFL PAV MRK TY I (W)6"(BRK)(100MIL)1,560LF $1.30 $4.00 $3.40 $3.30 $3.50 $3.00
43666-7411 REFL PAV MRK TY I (W)6"(SLD)(100MIL)5,787LF $0.5000 $2.00 $3.40 $3.30 $3.50 $1.50
44666-7423 REFL PAV MRK TY I (Y)6"(SLD)(100MIL)6,624LF $0.5000 $2.00 $3.40 $3.30 $3.50 $1.50
45672-7002 REFL PAV MRKR TY I-C78EA $5.72 $15.00 $6.75 $6.60 $7.00 $10.00
46672-7004 REFL PAV MRKR TY II-A-A65EA $5.50 $15.00 $6.75 $6.60 $7.00 $10.00
47678-7002 PAV SURF PREP FOR MRK (6")16,031LF $0.0300 $0.6500 $0.3000 $0.2800 $0.3000 $0.4500
48776-7001 REPAIR (STEEL RAIL)6LF $170.00 $500.00 $840.00 $500.00 $2,000.00 $250.00
49778-7001 CONCRETE RAIL REPAIR (IN-KIND)6LF $852.67 $500.00 $625.00 $500.00 $1,500.00 $350.00
50784-7002 REP STL BRIDGE MEMBER (BEAM)16EA $4,688.00 $9,000.00 $8,100.00 $5,000.00 $25,000.00 $10,000.00
51784-7003 REP STL BRIDGE MEMBER (DIAPHRAGM)1EA $2,750.00 $2,500.00 $3,500.00 $3,000.00 $30,000.00 $10,000.00
52784-7008 REP STL BRIDGE MEMBER (BEARINGS)4EA $154.00 $7,500.00 $11,600.00 $10,100.00 $2,500.00 $25,000.00
534010-7021 STEEL BRIDGE ZONE PAINTING1,957SF $25.00 $90.00 $92.60 $82.50 $90.00 $35.00
544019-7001 INSTALL BRIDGE IDENTIFICATION NUMBERS1EA $579.00 $300.00 $150.00 $550.00 $1,000.00 $1,500.00
557001-7002 BENT CAP/ABUTMENT CAP CLEANING5EA $1,400.00 $500.00 $800.00 $2,800.00 $4,000.00 $5,000.00