| 1 | 100-6002 |
PREPARING ROW | 1 | STA |
$5,000.00 |
$7,100.00 |
$30,000.00 |
$4,200.00 |
|
| 2 | 100-6007 |
PREP ROW (TREE)(GREATER THAN 24" DIA) | 10 | EA |
$1,500.00 |
$2,200.00 |
$1,500.00 |
$2,520.00 |
|
| 3 | 100-6009 |
PREPARING ROW (TREE) (6" TO 24" DIA) | 20 | EA |
$750.00 |
$1,100.00 |
$1,000.00 |
$1,550.00 |
|
| 4 | 104-6009 |
REMOVING CONC (RIPRAP) | 495 | SY |
$25.00 |
$14.50 |
$25.00 |
$35.00 |
|
| 5 | 104-6017 |
REMOVING CONC (DRIVEWAYS) | 226 | SY |
$20.00 |
$14.50 |
$25.00 |
$59.00 |
|
| 6 | 110-6001 |
EXCAVATION (ROADWAY) | 600 | CY |
$30.00 |
$33.50 |
$25.00 |
$33.25 |
|
| 7 | 112-6002 |
SUBGRADE WIDENING (DENS CONT) | 615 | STA |
$1,000.00 |
$438.50 |
$1,500.00 |
$595.00 |
|
| 8 | 134-6002 |
BACKFILL (TY B) | 615 | STA |
$150.00 |
$125.00 |
$180.25 |
$145.00 |
|
| 9 | 150-6001 |
BLADING | 615 | STA |
$150.00 |
$100.00 |
$35.00 |
$110.00 |
|
| 10 | 216-6001 |
PROOF ROLLING | 50 | HR |
$150.00 |
$165.00 |
$250.00 |
$310.00 |
|
| 11 | 247-6513 |
FL BS (CMP IN PLC) (TY A GR 4) (3.5") | 121,425 | SY |
$7.00 |
$9.70 |
$8.00 |
$9.75 |
|
| 12 | 247-6514 |
FL BS (CMP IN PLC) (TY A GR 4) (3.75") | 131,136 | SY |
$7.00 |
$10.50 |
$9.00 |
$10.40 |
|
| 13 | 251-6027 |
REWORK BS MTL (TY B) (6") (DENS CONT) | 12,379 | SY |
$5.00 |
$4.20 |
$6.00 |
$5.15 |
|
| 14 | 251-6035 |
REWORK BS MTL (TY C) (6") (DENS CONT) | 212,949 | SY |
$3.50 |
$2.55 |
$3.50 |
$1.05 |
|
| 15 | 260-6001 |
LIME (HYDRATED LIME (DRY)) | 257 | TON |
$250.00 |
$350.00 |
$300.00 |
$305.00 |
|
| 16 | 260-6073 |
LIME TRT (SUBGRADE)(8") | 13,692 | SY |
$5.00 |
$4.90 |
$6.00 |
$6.75 |
|
| 17 | 314-6013 |
EMULS ASPH (EROSN CONT)(CSS-1H) | 60,360 | GAL |
$6.00 |
$4.35 |
$5.00 |
$5.40 |
|
| 18 | 315-6004 |
FOG SEAL (CSS-1H) | 73,665 | GAL |
$6.00 |
$4.05 |
$5.00 |
$5.25 |
|
| 19 | 316-6017 |
ASPH (AC-20-5TR) | 88,638 | GAL |
$5.00 |
$5.95 |
$5.00 |
$5.75 |
|
| 20 | 316-6177 |
AGGR(TY-B GR-5 SAC-B) | 3,486 | CY |
$125.00 |
$140.00 |
$130.00 |
$105.00 |
|
| 21 | 351-6002 |
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6") | 3,919 | SY |
$40.00 |
$81.50 |
$70.00 |
$105.00 |
|
| 22 | 351-6019 |
FLEXIBLE PAVEMENT STRUCTURE REPAIR(3") | 3,919 | SY |
$20.00 |
$48.50 |
$65.00 |
$70.00 |
|
| 23 | 354-6022 |
PLANE ASPH CONC PAV(0" TO 3") | 668 | SY |
$10.00 |
$11.00 |
$3.00 |
$15.00 |
|
| 24 | 354-6157 |
PLAN ASHP CONC PAV (2" TO 3") | 183,321 | SY |
$3.75 |
$2.10 |
$3.00 |
$2.75 |
|
| 25 | 400-6005 |
CEM STABIL BKFL | 369 | CY |
$200.00 |
$270.00 |
$250.00 |
$280.00 |
|
| 26 | 400-6008 |
CUT & RESTORE ASPH PAVING | 589 | SY |
$100.00 |
$70.50 |
$65.00 |
$90.00 |
|
| 27 | 402-6001 |
TRENCH EXCAVATION PROTECTION | 462 | LF |
$100.00 |
$22.00 |
$20.00 |
$22.25 |
|
| 28 | 403-6001 |
TEMPORARY SPL SHORING | 1,980 | SF |
$30.00 |
$81.50 |
$40.00 |
$14.50 |
|
| 29 | 429-6009 |
CONC STR REPAIR (STANDARD) | 10 | SF |
$250.00 |
$325.00 |
$300.00 |
$335.00 |
|
| 30 | 432-6001 |
RIPRAP (CONC)(4 IN) | 365 | CY |
$600.00 |
$815.00 |
$800.00 |
$835.00 |
|
| 31 | 432-6002 |
RIPRAP (CONC)(5 IN) | 228 | CY |
$600.00 |
$815.00 |
$800.00 |
$835.00 |
|
| 32 | 432-6021 |
RIPRAP (STONE TY F)(GROUT)(8 IN) | 65 | CY |
$800.00 |
$870.00 |
$800.00 |
$200.00 |
|
| 33 | 432-6045 |
RIPRAP (MOW STRIP)(4 IN) | 180 | CY |
$600.00 |
$855.00 |
$800.00 |
$875.00 |
|
| 34 | 450-6006 |
RAIL (TY T223) | 124 | LF |
$200.00 |
$325.00 |
$300.00 |
$335.00 |
|
| 35 | 459-6001 |
GABIONS (GALV) | 29 | CY |
$300.00 |
$545.00 |
$1,000.00 |
$490.00 |
|
| 36 | 462-6001 |
CONC BOX CULV (3 FT X 2 FT) | 50 | LF |
$200.00 |
$415.00 |
$400.00 |
$425.00 |
|
| 37 | 462-6002 |
CONC BOX CULV (3 FT X 3 FT) | 286 | LF |
$220.00 |
$435.00 |
$450.00 |
$445.00 |
|
| 38 | 462-6003 |
CONC BOX CULV (4 FT X 2 FT) | 92 | LF |
$240.00 |
$490.00 |
$500.00 |
$500.00 |
|
| 39 | 462-6004 |
CONC BOX CULV (4 FT X 3 FT) | 196 | LF |
$260.00 |
$560.00 |
$550.00 |
$570.00 |
|
| 40 | 462-6005 |
CONC BOX CULV (4 FT X 4 FT) | 48 | LF |
$280.00 |
$630.00 |
$600.00 |
$645.00 |
|
| 41 | 462-6006 |
CONC BOX CULV (5 FT X 2 FT) | 44 | LF |
$270.00 |
$665.00 |
$650.00 |
$680.00 |
|
| 42 | 462-6007 |
CONC BOX CULV (5 FT X 3 FT) | 40 | LF |
$290.00 |
$700.00 |
$700.00 |
$715.00 |
|
| 43 | 462-6013 |
CONC BOX CULV (6 FT X 6 FT) | 96 | LF |
$500.00 |
$1,200.00 |
$1,200.00 |
$1,200.00 |
|
| 44 | 462-6045 |
CONC BOX CULV (3 FT X 2 FT)(EXTEND) | 43 | LF |
$500.00 |
$700.00 |
$650.00 |
$720.00 |
|
| 45 | 462-6046 |
CONC BOX CULV (3 FT X 3 FT)(EXTEND) | 27 | LF |
$550.00 |
$805.00 |
$750.00 |
$820.00 |
|
| 46 | 462-6051 |
CONC BOX CULV (5 FT X 3 FT)(EXTEND) | 8 | LF |
$600.00 |
$1,000.00 |
$1,000.00 |
$1,055.00 |
|
| 47 | 462-6078 |
CONC BOX CULV (10 FT X 10 FT)(EXTEND) | 52 | LF |
$1,200.00 |
$1,900.00 |
$2,000.00 |
$1,955.00 |
|
| 48 | 464-6010 |
RC PIPE (CL III)(48 IN) | 64 | LF |
$300.00 |
$545.00 |
$500.00 |
$555.00 |
|
| 49 | 464-6018 |
RC PIPE (CL IV)(24 IN) | 88 | LF |
$250.00 |
$180.00 |
$200.00 |
$185.00 |
|
| 50 | 466-6152 |
WINGWALL (FW - 0) (HW=5 FT) | 1 | EA |
$12,000.00 |
$14,000.00 |
$15,000.00 |
$14,155.00 |
|
| 51 | 466-6154 |
WINGWALL (FW - 0) (HW=7 FT) | 1 | EA |
$16,000.00 |
$16,500.00 |
$15,000.00 |
$16,650.00 |
|
| 52 | 466-6155 |
WINGWALL (FW - 0) (HW=8 FT) | 2 | EA |
$18,000.00 |
$24,500.00 |
$25,000.00 |
$25,000.00 |
|
| 53 | 466-6156 |
WINGWALL (FW - 0) (HW=9 FT) | 3 | EA |
$20,000.00 |
$19,000.00 |
$20,000.00 |
$19,500.00 |
|
| 54 | 466-6158 |
WINGWALL (FW - S) (HW=11 FT) | 2 | EA |
$40,000.00 |
$160,000.00 |
$150,000.00 |
$161,000.00 |
|
| 55 | 466-6180 |
WINGWALL (PW - 1) (HW=5 FT) | 1 | EA |
$25,000.00 |
$30,000.00 |
$30,000.00 |
$30,525.00 |
|
| 56 | 467-6003 |
SET (REPLACE PIPE RUNNER ASSEMBLY) | 2 | EA |
$2,000.00 |
$43,500.00 |
$40,000.00 |
$44,400.00 |
|
| 57 | 467-6106 |
SET (TY I)(S=3 FT)(HW=3FT)(4:1)(C) | 2 | EA |
$8,000.00 |
$8,200.00 |
$7,500.00 |
$8,325.00 |
|
| 58 | 467-6109 |
SET (TY I)(S=3 FT)(HW= 3 FT)(6:1)(C) | 8 | EA |
$9,000.00 |
$16,000.00 |
$14,500.00 |
$16,100.00 |
|
| 59 | 467-6112 |
SET (TY I)(S=3 FT)(HW= 4 FT)(4:1)(C) | 4 | EA |
$9,000.00 |
$16,000.00 |
$14,500.00 |
$16,100.00 |
|
| 60 | 467-6115 |
SET (TY I)(S=3 FT)(HW= 4 FT)(6:1)(C) | 14 | EA |
$9,200.00 |
$17,500.00 |
$16,500.00 |
$18,000.00 |
|
| 61 | 467-6141 |
SET (TY I)(S= 4 FT)(HW= 3 FT)(6:1) (C) | 4 | EA |
$10,000.00 |
$11,000.00 |
$10,000.00 |
$11,100.00 |
|
| 62 | 467-6146 |
SET (TY I)(S= 4 FT)(HW= 4 FT)(6:1) (C) | 4 | EA |
$12,000.00 |
$13,500.00 |
$12,500.00 |
$14,000.00 |
|
| 63 | 467-6173 |
SET (TY I)(S= 5 FT)(HW= 3 FT)(6:1) (C) | 2 | EA |
$16,000.00 |
$18,000.00 |
$20,000.00 |
$18,600.00 |
|
| 64 | 467-6179 |
SET (TY I)(S= 5 FT)(HW= 4 FT)(6:1) (C) | 4 | EA |
$17,000.00 |
$27,000.00 |
$25,000.00 |
$27,750.00 |
|
| 65 | 467-6395 |
SET (TY II) (24 IN) (RCP) (6: 1) (P) | 4 | EA |
$2,500.00 |
$1,700.00 |
$1,600.00 |
$1,800.00 |
|
| 66 | 467-6477 |
SET (TY II) (48 IN) (RCP) (4: 1) (C) | 2 | EA |
$4,500.00 |
$7,100.00 |
$6,500.00 |
$7,200.00 |
|
| 67 | 480-6001 |
CLEAN EXIST CULVERTS | 27 | EA |
$2,500.00 |
$2,700.00 |
$2,000.00 |
$190.00 |
|
| 68 | 496-6016 |
REMOV STR (PIPE) | 13 | EA |
$2,000.00 |
$325.00 |
$300.00 |
$335.00 |
|
| 69 | 500-6001 |
MOBILIZATION | 1 | LS |
$1,710,000.00 |
$1,950,000.00 |
$2,500,000.00 |
$2,730,000.00 |
|
| 70 | 502-6001 |
BARRICADES, SIGNS AND TRAFFIC HANDLING | 35 | MO |
$8,000.00 |
$25,000.00 |
$30,000.00 |
$35,250.00 |
|
| 71 | 506-6003 |
ROCK FILTER DAMS (INSTALL) (TY 3) | 299 | LF |
$60.00 |
$76.00 |
$70.00 |
$90.00 |
|
| 72 | 506-6011 |
ROCK FILTER DAMS (REMOVE) | 299 | LF |
$18.00 |
$22.00 |
$15.00 |
$10.00 |
|
| 73 | 506-6020 |
CONSTRUCTION EXITS (INSTALL) (TY 1) | 444 | SY |
$50.00 |
$54.50 |
$30.00 |
$35.00 |
|
| 74 | 506-6024 |
CONSTRUCTION EXITS (REMOVE) | 444 | SY |
$10.00 |
$16.50 |
$8.00 |
$7.00 |
|
| 75 | 506-6035 |
SANDBAGS FOR EROSION CONTROL | 800 | EA |
$8.00 |
$5.45 |
$15.00 |
$25.00 |
|
| 76 | 506-6038 |
TEMP SEDMT CONT FENCE (INSTALL) | 10,000 | LF |
$3.00 |
$3.25 |
$4.50 |
$8.75 |
|
| 77 | 506-6039 |
TEMP SEDMT CONT FENCE (REMOVE) | 5,000 | LF |
$1.00 |
$1.10 |
$1.25 |
$4.00 |
|
| 78 | 506-6042 |
BIODEG EROSN CONT LOGS (INSTL) (18") | 12,360 | LF |
$7.00 |
$6.80 |
$8.75 |
$8.30 |
|
| 79 | 506-6043 |
BIODEG EROSN CONT LOGS (REMOVE) | 6,180 | LF |
$2.00 |
$2.20 |
$2.00 |
$3.35 |
|
| 80 | 512-6017 |
PORT CTB (DES SOURCE)(F-SHAPE)(TY 1) | 390 | LF |
$15.00 |
$35.50 |
$10.00 |
$22.25 |
|
| 81 | 512-6029 |
PORT CTB (MOVE)(F-SHAPE)(TY 1) | 4,110 | LF |
$10.00 |
$20.50 |
$15.00 |
$17.00 |
|
| 82 | 512-6041 |
PORT CTB (STKPL)(F-SHAPE)(TY 1) | 1,080 | LF |
$15.00 |
$25.00 |
$10.00 |
$22.25 |
|
| 83 | 530-6002 |
INTERSECTIONS (ACP) | 1,612 | SY |
$50.00 |
$125.00 |
$99.04 |
$108.00 |
|
| 84 | 530-6004 |
DRIVEWAYS (CONC) | 685 | SY |
$90.00 |
$135.00 |
$150.00 |
$155.00 |
|
| 85 | 530-6005 |
DRIVEWAYS (ACP) | 3,202 | SY |
$60.00 |
$100.00 |
$85.00 |
$73.00 |
|
| 86 | 530-6008 |
TURNOUTS (ACP) | 127 | SY |
$50.00 |
$115.00 |
$100.00 |
$1,465.00 |
|
| 87 | 533-6003 |
RUMBLE STRIPS (SHOULDER) ASPHALT | 122,906 | LF |
$0.2000 |
$0.0900 |
$0.2500 |
$0.2500 |
|
| 88 | 533-6004 |
RUMBLE STRIPS (CENTERLINE) ASPHALT | 61,453 | LF |
$0.2000 |
$0.1500 |
$0.3000 |
$0.3000 |
|
| 89 | 540-6002 |
MTL W-BEAM GD FEN (STEEL POST) | 2,275 | LF |
$40.00 |
$38.50 |
$32.00 |
$39.40 |
|
| 90 | 540-6006 |
MTL BEAM GD FEN TRANS (THRIE-BEAM) | 4 | EA |
$3,000.00 |
$4,200.00 |
$2,600.00 |
$4,275.00 |
|
| 91 | 542-6001 |
REMOVE METAL BEAM GUARD FENCE | 1,400 | LF |
$4.00 |
$3.25 |
$3.00 |
$3.35 |
|
| 92 | 542-6002 |
REMOVE TERMINAL ANCHOR SECTION | 6 | EA |
$350.00 |
$325.00 |
$300.00 |
$335.00 |
|
| 93 | 544-6001 |
GUARDRAIL END TREATMENT (INSTALL) | 18 | EA |
$4,000.00 |
$3,900.00 |
$3,175.00 |
$3,940.00 |
|
| 94 | 544-6003 |
GUARDRAIL END TREATMENT (REMOVE) | 8 | EA |
$900.00 |
$325.00 |
$300.00 |
$335.00 |
|
| 95 | 545-6003 |
CRASH CUSH ATTEN (MOVE & RESET) | 56 | EA |
$1,800.00 |
$2,700.00 |
$3,250.00 |
$2,800.00 |
|
| 96 | 545-6005 |
CRASH CUSH ATTEN (REMOVE) | 13 | EA |
$1,500.00 |
$1,600.00 |
$1,750.00 |
$1,665.00 |
|
| 97 | 545-6019 |
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3) | 13 | EA |
$7,000.00 |
$8,200.00 |
$9,975.00 |
$8,325.00 |
|
| 98 | 552-6003 |
WIRE FENCE (TY C) | 300 | LF |
$10.00 |
$38.00 |
$35.00 |
$40.00 |
|
| 99 | 560-6011 |
MAILBOX INSTALL-S (TWW-POST) TY 4 | 8 | EA |
$350.00 |
$315.00 |
$325.00 |
$420.00 |
|
| 100 | 560-6012 |
MAILBOX INSTALL-D (TWW-POST) TY 4 | 1 | EA |
$400.00 |
$350.00 |
$350.00 |
$475.00 |
|
| 101 | 560-6013 |
MAILBOX INSTALL-M (TWW-POST) TY 4 | 1 | EA |
$600.00 |
$760.00 |
$725.00 |
$890.00 |
|
| 102 | 644-6001 |
IN SM RD SN SUP&AM TY10BWG(1)SA(P) | 14 | EA |
$800.00 |
$795.00 |
$785.00 |
$1,110.00 |
|
| 103 | 644-6002 |
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM) | 12 | EA |
$1,200.00 |
$840.00 |
$889.00 |
$1,200.00 |
|
| 104 | 644-6004 |
IN SM RD SN SUP&AM TY10BWG(1)SA(T) | 26 | EA |
$900.00 |
$940.00 |
$931.00 |
$1,260.00 |
|
| 105 | 644-6007 |
IN SM RD SN SUP&AM TY10BWG(1)SA(U) | 1 | EA |
$1,200.00 |
$980.00 |
$846.00 |
$1,400.00 |
|
| 106 | 644-6034 |
IN SM RD SN SUP&AM TYS80(1)SA(U-1EXT) | 1 | EA |
$1,500.00 |
$1,100.00 |
$1,428.00 |
$1,800.00 |
|
| 107 | 644-6076 |
REMOVE SM RD SN SUP&AM | 51 | EA |
$100.00 |
$110.00 |
$100.00 |
$125.00 |
|
| 108 | 658-6062 |
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI) | 33 | EA |
$90.00 |
$49.00 |
$39.00 |
$50.00 |
|
| 109 | 658-6081 |
INSTL DEL ASSM (D-SW)SZ 1(WFLX)GND(BI) | 50 | EA |
$90.00 |
$81.50 |
$76.00 |
$166.50 |
|
| 110 | 658-6084 |
INSTL DEL ASSM (D-SW)SZ 1(WFLX)SRF(BI) | 8 | EA |
$90.00 |
$165.00 |
$96.00 |
$185.00 |
|
| 111 | 658-6100 |
INSTL OM ASSM (OM-2Z)(WFLX)GND(BI) | 54 | EA |
$60.00 |
$81.50 |
$82.00 |
$166.50 |
|
| 112 | 662-6004 |
WK ZN PAV MRK NON-REMOV (W)4"(SLD) | 289,156 | LF |
$0.2500 |
$0.1600 |
$0.1500 |
$0.1700 |
|
| 113 | 662-6016 |
WK ZN PAV MRK NON-REMOV (W)24"(SLD) | 930 | LF |
$5.00 |
$2.20 |
$2.00 |
$2.25 |
|
| 114 | 662-6030 |
WK ZN PAV MRK NON-REMOV(W)18"(YLD TRI) | 192 | EA |
$25.00 |
$22.00 |
$20.00 |
$22.20 |
|
| 115 | 662-6032 |
WK ZN PAV MRK NON-REMOV (Y)4"(BRK) | 34,530 | LF |
$0.2500 |
$0.1600 |
$0.1500 |
$0.1700 |
|
| 116 | 662-6034 |
WK ZN PAV MRK NON-REMOV (Y)4"(SLD) | 301,090 | LF |
$0.2500 |
$0.1600 |
$0.1500 |
$0.1700 |
|
| 117 | 662-6111 |
WK ZN PAV MRK SHT TERM (TAB)TY Y-2 | 27,230 | EA |
$2.00 |
$1.30 |
$1.00 |
$1.75 |
|
| 118 | 666-6309 |
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL) | 130,706 | LF |
$0.5000 |
$0.7600 |
$0.7000 |
$0.7800 |
|
| 119 | 666-6318 |
RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL) | 13,760 | LF |
$0.5000 |
$0.7600 |
$0.7000 |
$0.7800 |
|
| 120 | 666-6321 |
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL) | 49,080 | LF |
$0.5000 |
$0.7600 |
$0.7000 |
$0.7800 |
|
| 121 | 668-6076 |
PREFAB PAV MRK TY C (W) (24") (SLD) | 201 | LF |
$25.00 |
$18.50 |
$17.00 |
$19.00 |
|
| 122 | 672-6009 |
REFL PAV MRKR TY II-A-A | 1,295 | EA |
$3.00 |
$3.80 |
$3.50 |
$3.90 |
|
| 123 | 677-6001 |
ELIM EXT PAV MRK & MRKS (4") | 292,294 | LF |
$0.7000 |
$0.7100 |
$0.6500 |
$0.7500 |
|
| 124 | 677-6007 |
ELIM EXT PAV MRK & MRKS (24") | 930 | LF |
$5.00 |
$5.45 |
$5.00 |
$5.55 |
|
| 125 | 677-6018 |
ELIM EXT PAV MRK & MRKS (18")(YLD TRI) | 192 | EA |
$20.00 |
$11.00 |
$10.00 |
$11.10 |
|
| 126 | 730-6107 |
FULL - WIDTH MOWING | 6 | CYC |
$5,000.00 |
$5,400.00 |
$2,250.00 |
$6,545.00 |
|
| 127 | 734-6002 |
LITTER REMOVAL | 6 | CYC |
$2,000.00 |
$2,700.00 |
$845.00 |
$3,300.00 |
|
| 128 | 3080-6011 |
STONE-MTRX-ASPH SMA-D SAC-B PG76-28 | 25,940 | TON |
$135.00 |
$200.00 |
$220.00 |
$206.00 |
|
| 129 | 3080-6029 |
TACK COAT | 54 | GAL |
$10.00 |
$6.55 |
$10.00 |
$10.00 |
|
| 130 | 3088-6001 |
CEMENT | 894 | TON |
$320.00 |
$245.00 |
$225.00 |
$280.00 |
|
| 131 | 3088-6007 |
FOAMED ASPHALT TREAT (8") (DC) | 226,641 | SY |
$4.50 |
$4.80 |
$4.25 |
$9.10 |
|
| 132 | 3088-6008 |
ASPHALT BINDER (PG 64-22) | 535,862 | GAL |
$3.00 |
$4.15 |
$4.50 |
$4.80 |
|
| 133 | 6001-6001 |
PORTABLE CHANGEABLE MESSAGE SIGN | 2,100 | DAY |
$100.00 |
$27.00 |
$35.00 |
$92.00 |
|
| 134 | 6185-6002 |
TMA (STATIONARY) | 1,968 | DAY |
$150.00 |
$165.00 |
$155.00 |
$550.00 |
|
| 135 | 6185-6005 |
TMA (MOBILE OPERATION) | 108 | DAY |
$250.00 |
$870.00 |
$950.00 |
$925.00 |
|
| 136 | 6307-6003 |
TEMP SPEED MONITOR SYS | 2 | EA |
$15,000.00 |
$16,500.00 |
$12,500.00 |
$20,000.00 |
|