| 666-7293 |
TY I HIGH PERF PM (W)6"(SLD)(100MIL) | 100,813 | LF |
$0.4800 |
|
|
|
|
|
|
|
|
| 1 | 104-7001 |
REMOV CONC (PAV) | 634 | SY |
$11.40 |
$35.00 |
$23.50 |
$40.00 |
$46.25 |
$40.00 |
$37.70 |
$51.12 |
$19.00 |
| 2 | 104-7008 |
REMOV CONC (MEDIANS) | 303 | SY |
$95.00 |
$45.00 |
$23.50 |
$40.00 |
$48.75 |
$40.00 |
$37.88 |
$74.46 |
$19.00 |
| 3 | 104-7011 |
REMOV CONC (DRIVEWAYS) | 358 | SY |
$28.50 |
$40.00 |
$20.00 |
$45.00 |
$45.00 |
$40.00 |
$40.08 |
$32.05 |
$17.00 |
| 4 | 105-7010 |
RMV (10"-14") TRT/UNTRT BASE & ASPH PAV | 7,981 | SY |
$5.70 |
$9.00 |
$11.00 |
$14.20 |
$13.75 |
$10.00 |
$13.14 |
$22.72 |
$12.00 |
| 5 | 105-7026 |
RMV (6") TRT/UNTRT BASE & ASPH PAV | 1,078 | SY |
$19.00 |
$12.00 |
$9.00 |
$14.20 |
$13.50 |
$10.00 |
$11.31 |
$16.78 |
$10.00 |
| 6 | 106-7001 |
OBLITERATING ABANDONED ROAD | 10 | STA |
$2,375.00 |
$1,500.00 |
$2,700.00 |
$4,500.00 |
$1,940.00 |
$2,500.00 |
$2,502.87 |
$8,420.13 |
$1,175.00 |
| 7 | 110-7001 |
EXCAV (ROADWAY) | 5,000 | CY |
$60.00 |
$38.00 |
$21.00 |
$15.00 |
$40.00 |
$20.00 |
$21.96 |
$37.52 |
$38.00 |
| 8 | 112-7002 |
SUBGR WIDEN (DC) | 328.34 | STA |
$712.50 |
$700.00 |
$530.00 |
$600.00 |
$1,125.00 |
$2,500.00 |
$995.55 |
$1,160.99 |
$1,417.00 |
| 9 | 134-7002 |
BACKFILL (TY B) | 1,021.6 | STA |
$142.50 |
$145.00 |
$115.00 |
$400.00 |
$109.00 |
$250.00 |
$154.31 |
$100.00 |
$40.00 |
| 10 | 150-7001 |
BLADING | 1,031.6 | STA |
$114.00 |
$110.00 |
$105.00 |
$300.00 |
$104.00 |
$130.00 |
$138.93 |
$100.00 |
$102.00 |
| 11 | 310-7004 |
PRIME COAT (MC-30) | 6,643.4 | GAL |
$6.18 |
$5.00 |
$4.90 |
$5.00 |
$7.20 |
$12.50 |
$7.83 |
$8.17 |
$6.00 |
| 12 | 314-7011 |
EMULS ASPH (EROSN CONT)(CSS-1H) | 210,469.93 | GAL |
$3.50 |
$4.80 |
$2.65 |
$3.75 |
$2.25 |
$3.75 |
$3.71 |
$2.47 |
$3.00 |
| 13 | 315-7004 |
FOG SEAL (CSS-1H) | 6,172 | GAL |
$5.70 |
$5.50 |
$3.65 |
$4.00 |
$3.40 |
$4.25 |
$4.66 |
$2.99 |
$8.00 |
| 14 | 341-7009 |
D-GR HMA TY-B PG70-28 | 11,087.97 | TON |
$130.00 |
$176.00 |
$165.00 |
$160.00 |
$163.75 |
$155.50 |
$223.15 |
$183.27 |
$188.00 |
| 15 | 341-7028 |
D-GR HMA TY-C SAC-B PG70-28 | 7,490.53 | TON |
$159.00 |
$166.00 |
$165.00 |
$162.00 |
$155.00 |
$180.50 |
$210.13 |
$166.24 |
$206.00 |
| 16 | 341-7054 |
D-GR HMA TY-D SAC-B PG70-28 | 20,218.96 | TON |
$140.00 |
$170.00 |
$145.00 |
$160.00 |
$150.00 |
$205.50 |
$199.90 |
$179.43 |
$202.00 |
| 17 | 341-7082 |
TACK COAT | 74,772.42 | GAL |
$5.30 |
$4.50 |
$3.35 |
$4.50 |
$3.60 |
$6.00 |
$4.83 |
$4.22 |
$4.00 |
| 18 | 346-7010 |
STONE-MTRX-ASPH SMA-D SAC-A PG76-28 | 40,887.88 | TON |
$170.00 |
$189.00 |
$185.00 |
$150.00 |
$195.00 |
$180.50 |
$244.76 |
$227.46 |
$203.00 |
| 19 | 346-7028 |
TACK COAT | 19,732.37 | GAL |
$6.18 |
$4.50 |
$3.50 |
$4.50 |
$3.85 |
$6.00 |
$5.33 |
$4.41 |
$4.00 |
| 20 | 351-7001 |
FLEXIBLE PAVEMENT STRUCTURE REPAIR(2") | 2,724.26 | SY |
$28.50 |
$28.00 |
$40.00 |
$27.00 |
$40.75 |
$60.00 |
$27.41 |
$30.16 |
$64.00 |
| 21 | 351-7005 |
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6") | 8,172.75 | SY |
$76.00 |
$76.00 |
$60.00 |
$60.00 |
$60.50 |
$70.00 |
$73.44 |
$82.37 |
$192.00 |
| 22 | 354-7032 |
PLANE ASPH CONC PAV(0" TO 2") | 424,818.25 | SY |
$2.00 |
$1.25 |
$2.05 |
$1.40 |
$1.85 |
$2.00 |
$2.34 |
$1.66 |
$2.00 |
| 23 | 416-7040 |
DRILL SHAFT (RDWY ILL POLE) (30 IN) | 160 | LF |
|
$360.00 |
$360.00 |
$380.00 |
$361.00 |
$300.00 |
$386.40 |
$442.63 |
$350.00 |
| 24 | 432-7004 |
RIPRAP (CONC)(CL A) | 162.58 | CY |
$950.00 |
$640.00 |
$730.00 |
$660.00 |
$837.00 |
$700.00 |
$896.00 |
$972.11 |
$730.00 |
| 25 | 432-7014 |
RIPRAP (MOW STRIP)(5 IN) | 4,231.96 | CY |
|
$580.00 |
$460.00 |
$610.00 |
$575.00 |
$440.00 |
$616.00 |
$564.51 |
$558.00 |
| 26 | 462-7056 |
CONC BOX CULV (3 FT X 2 FT)(EXTEND) | 18 | LF |
$788.50 |
$950.00 |
$940.00 |
$1,740.00 |
$1,750.00 |
$1,000.00 |
$952.00 |
$1,627.73 |
$952.00 |
| 27 | 462-7057 |
CONC BOX CULV (3 FT X 3 FT)(EXTEND) | 6 | LF |
$888.25 |
$1,300.00 |
$1,300.00 |
$1,860.00 |
$1,780.00 |
$1,275.00 |
$1,008.00 |
$1,669.82 |
$1,080.00 |
| 28 | 462-7058 |
CONC BOX CULV (4 FT X 2 FT)(EXTEND) | 5.5 | LF |
$441.75 |
$1,450.00 |
$1,400.00 |
$1,900.00 |
$1,925.00 |
$1,500.00 |
$1,008.00 |
$1,756.08 |
$1,085.00 |
| 29 | 462-7061 |
CONC BOX CULV (5 FT X 2 FT)(EXTEND) | 15 | LF |
$745.75 |
$1,400.00 |
$1,400.00 |
$2,150.00 |
$2,130.00 |
$1,500.00 |
$1,064.00 |
$1,835.10 |
$1,220.00 |
| 30 | 462-7062 |
CONC BOX CULV (5 FT X 3 FT)(EXTEND) | 5.5 | LF |
$1,282.50 |
$1,500.00 |
$1,500.00 |
$2,200.00 |
$2,000.00 |
$1,450.00 |
$1,176.00 |
$2,105.60 |
$1,370.00 |
| 31 | 464-7005 |
RC PIPE (CL III)(24 IN) | 16 | LF |
$142.50 |
$170.00 |
$165.00 |
$205.00 |
$210.00 |
$200.00 |
$168.00 |
$227.39 |
$153.00 |
| 32 | 467-7038 |
SET (TY I)(S= 3 FT)(HW= 2 FT)(6:1)(C) | 7 | EA |
$1,900.00 |
$19,000.00 |
$18,500.00 |
$23,150.00 |
$17,100.00 |
$18,000.00 |
$8,960.00 |
$25,802.78 |
$19,185.00 |
| 33 | 467-7041 |
SET (TY I)(S= 3 FT)(HW= 3 FT)(4:1)(C) | 1 | EA |
$10,188.75 |
$29,000.00 |
$29,500.00 |
$23,250.00 |
$16,300.00 |
$30,000.00 |
$10,080.00 |
$26,465.14 |
$19,285.00 |
| 34 | 467-7042 |
SET (TY I)(S= 3 FT)(HW= 3 FT)(6:1)(C) | 1 | EA |
$9,500.00 |
$24,000.00 |
$24,000.00 |
$32,600.00 |
$19,000.00 |
$25,000.00 |
$13,440.00 |
$39,330.76 |
$27,915.00 |
| 35 | 467-7064 |
SET (TY I)(S= 4 FT)(HW= 2 FT)(4:1)(C) | 1 | EA |
$3,800.00 |
$15,000.00 |
$15,000.00 |
$16,650.00 |
$14,800.00 |
$15,000.00 |
$11,200.00 |
$19,463.31 |
$13,195.00 |
| 36 | 467-7093 |
SET (TY I)(S= 5 FT)(HW= 2 FT)(6:1)(C) | 4 | EA |
$12,350.00 |
$13,000.00 |
$12,500.00 |
$14,720.00 |
$16,500.00 |
$12,000.00 |
$10,640.00 |
$17,202.07 |
$11,420.00 |
| 37 | 467-7096 |
SET (TY I)(S= 5 FT)(HW= 3 FT)(4:1)(C) | 1 | EA |
$13,300.00 |
$24,000.00 |
$23,500.00 |
$24,570.00 |
$16,700.00 |
$24,000.00 |
$13,440.00 |
$28,004.71 |
$20,505.01 |
| 38 | 467-7328 |
SET (TY II) (24 IN) (RCP) (6: 1) (P) | 2 | EA |
$2,375.00 |
$2,200.00 |
$2,100.00 |
$5,460.00 |
$4,500.00 |
$2,500.00 |
$2,240.00 |
$5,534.72 |
$3,567.25 |
| 39 | 480-7001 |
CLEAN EXIST CULVERTS | 26 | EA |
$2,850.00 |
$3,700.00 |
$3,700.00 |
$4,400.00 |
$2,050.00 |
$3,650.00 |
$2,240.00 |
$5,131.89 |
$4,055.00 |
| 40 | 500-7001 |
MOBILIZATION | 1 | LS |
$2,852,000.00 |
$1,900,000.00 |
$2,900,000.00 |
$2,550,000.00 |
$3,100,000.00 |
$3,400,000.00 |
$1,798,754.95 |
$4,093,988.07 |
$3,750,600.00 |
| 41 | 502-7001 |
BARRICADES, SIGNS AND TRAFFIC HANDLING | 29 | MO |
$11,400.00 |
$11,950.00 |
$15,000.00 |
$34,000.00 |
$35,000.00 |
$70,000.00 |
$18,356.20 |
$35,000.00 |
$103,246.00 |
| 42 | 503-7001 |
PORTABLE CHANGEABLE MESSAGE SIGN | 1,000 | DAY |
$104.50 |
$25.00 |
$105.00 |
$50.00 |
$76.00 |
$40.00 |
$88.38 |
$81.59 |
$94.00 |
| 43 | 505-7001 |
TMA (STATIONARY) | 1,250 | DAY |
$199.50 |
$95.00 |
$260.00 |
$300.00 |
$310.00 |
$180.00 |
$592.29 |
$552.00 |
$100.00 |
| 44 | 505-7003 |
TMA (MOBILE OPERATION) | 165 | DAY |
$247.00 |
$95.00 |
$940.00 |
$900.00 |
$105.00 |
$500.00 |
$1,188.13 |
$1,032.77 |
$100.00 |
| 45 | 506-7020 |
CONSTRUCTION EXITS (INSTALL) (TY 1) | 231 | SY |
$57.00 |
$35.00 |
$52.50 |
$31.00 |
$50.00 |
$50.00 |
$56.00 |
$64.15 |
$51.00 |
| 46 | 506-7024 |
CONSTRUCTION EXITS (REMOVE) | 231 | SY |
$9.50 |
$5.00 |
$15.50 |
$8.00 |
$15.00 |
$15.00 |
$16.80 |
$19.24 |
$16.00 |
| 47 | 506-7035 |
SANDBAGS FOR EROSION CONTROL | 600 | EA |
$9.50 |
$18.00 |
$21.00 |
$20.00 |
$13.00 |
$20.00 |
$22.40 |
$25.66 |
$21.00 |
| 48 | 506-7045 |
BIODEG EROSN CONT LOGS (INSTL) (18") | 6,680 | LF |
$11.40 |
$8.00 |
$8.35 |
$7.00 |
$8.00 |
$8.00 |
$8.96 |
$10.26 |
$9.00 |
| 49 | 506-7046 |
BIODEG EROSN CONT LOGS (REMOVE) | 3,340 | LF |
$2.85 |
$1.50 |
$1.55 |
$3.50 |
$6.00 |
$1.50 |
$1.68 |
$1.92 |
$2.00 |
| 50 | 530-7002 |
INTERSECTIONS (ACP) | 6,061 | SY |
$57.00 |
$100.00 |
$125.00 |
$120.00 |
$72.00 |
$100.00 |
$121.90 |
$123.53 |
$132.00 |
| 51 | 530-7006 |
DRIVEWAYS (CONC) | 358 | SY |
$109.25 |
$280.00 |
$150.00 |
$250.00 |
$100.00 |
$145.00 |
$140.00 |
$274.34 |
$345.00 |
| 52 | 530-7010 |
DRIVEWAYS (ACP) | 3,192 | SY |
$76.00 |
$48.00 |
$66.50 |
$122.00 |
$26.00 |
$60.00 |
$161.48 |
$52.05 |
$66.00 |
| 53 | 533-7001 |
MILL RUMBLE STRIPS (ASPHALT) (SHLDR) | 154,300 | LF |
$0.2400 |
$0.2500 |
$0.0800 |
$0.2200 |
$0.3500 |
$0.1700 |
$0.3000 |
$0.1200 |
$0.1000 |
| 54 | 543-7016 |
CABLE BARRIER SYS(INSTL)(TL-4)(20 '-0") | 89,320 | LF |
|
$15.00 |
$16.50 |
$17.70 |
$15.20 |
$16.00 |
$16.24 |
$20.53 |
$15.00 |
| 55 | 543-7018 |
CABLE BARRIER TERM SEC (INSTL)(TL-4) | 76 | EA |
|
$3,600.00 |
$4,700.00 |
$4,990.00 |
$3,600.00 |
$4,500.00 |
$3,864.00 |
$5,773.38 |
$3,495.00 |
| 56 | 560-7008 |
MAILBOX INSTALL-S (TWW-POST) TY 4 | 2 | EA |
$351.50 |
$230.00 |
$230.00 |
$240.00 |
$525.00 |
$220.00 |
$246.40 |
$282.25 |
$223.00 |
| 57 | 560-7010 |
MAILBOX INSTALL-M (TWW-POST) TY 4 | 2 | EA |
$760.00 |
$580.00 |
$575.00 |
$600.00 |
$890.00 |
$550.00 |
$616.00 |
$705.64 |
$558.00 |
| 58 | 610-7129 |
IN RD IL (TY SA) 40T-12-12(250W EQ)LED | 20 | EA |
|
$6,500.00 |
$6,400.00 |
$6,740.00 |
$6,400.00 |
$8,000.00 |
$6,860.00 |
$7,858.21 |
$6,204.00 |
| 59 | 618-7009 |
CONDT (HDPE) (2") | 3,520 | LF |
|
$15.00 |
$15.00 |
$16.00 |
$15.20 |
$12.00 |
$16.24 |
$18.60 |
$15.00 |
| 60 | 618-7010 |
CONDT (HDPE) (2") BORE | 520 | LF |
|
$32.00 |
$31.50 |
$33.00 |
$31.35 |
$18.00 |
$33.60 |
$38.49 |
$31.00 |
| 61 | 620-7009 |
ELEC CONDR (NO.6) BARE | 4,040 | LF |
|
$3.00 |
$2.75 |
$2.90 |
$2.80 |
$3.00 |
$2.97 |
$3.40 |
$2.70 |
| 62 | 620-7010 |
ELEC CONDR (NO.6) INSULATED | 8,080 | LF |
|
$3.20 |
$3.15 |
$3.30 |
$3.15 |
$3.50 |
$3.36 |
$3.85 |
$3.05 |
| 63 | 624-7002 |
GROUND BOX TY A (122311)W/APRON | 2 | EA |
|
$1,300.00 |
$1,300.00 |
$1,375.00 |
$1,310.00 |
$1,500.00 |
$1,400.00 |
$1,603.72 |
$1,266.00 |
| 64 | 628-7009 |
ELC SRV TY A 120/240 060(NS)SS(E)SP(O) | 2 | EA |
|
$9,000.00 |
$9,000.00 |
$9,460.00 |
$9,000.00 |
$8,500.00 |
$9,632.00 |
$11,033.57 |
$8,710.00 |
| 65 | 636-7002 |
ALUMINUM SIGNS (TY G) | 96 | SF |
$33.25 |
$32.00 |
$31.50 |
$33.00 |
$37.00 |
$30.00 |
$33.60 |
$38.49 |
$31.00 |
| 66 | 644-7001 |
IN SM RD SN SUP&AM TY10BWG(1)SA(P) | 69 | EA |
$760.00 |
$750.00 |
$750.00 |
$780.00 |
$940.00 |
$750.00 |
$800.80 |
$917.33 |
$725.00 |
| 67 | 644-7002 |
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM) | 26 | EA |
$522.50 |
$920.00 |
$910.00 |
$957.00 |
$1,090.00 |
$900.00 |
$974.40 |
$1,116.19 |
$882.00 |
| 68 | 644-7004 |
IN SM RD SN SUP&AM TY10BWG(1)SA(T) | 54 | EA |
$855.00 |
$810.00 |
$805.00 |
$847.00 |
$1,000.00 |
$800.00 |
$862.40 |
$987.89 |
$780.00 |
| 69 | 644-7007 |
IN SM RD SN SUP&AM TY10BWG(1)SA(U) | 3 | EA |
$1,045.00 |
$1,000.00 |
$995.00 |
$1,045.00 |
$1,200.00 |
$950.00 |
$1,064.00 |
$1,218.82 |
$963.00 |
| 70 | 644-7026 |
IN SM RD SN SUP&AM TYS80(1)SA(P-BM) | 28 | EA |
$1,140.00 |
$1,200.00 |
$1,200.00 |
$1,210.00 |
$1,400.00 |
$1,100.00 |
$1,232.00 |
$1,411.27 |
$1,115.00 |
| 71 | 644-7028 |
IN SM RD SN SUP&AM TYS80(1)SA(T) | 2 | EA |
$997.50 |
$900.00 |
$890.00 |
$935.00 |
$1,230.00 |
$850.00 |
$952.00 |
$1,090.53 |
$861.00 |
| 72 | 644-7031 |
IN SM RD SN SUP&AM TYS80(1)SA(U) | 2 | EA |
$1,140.00 |
$1,100.00 |
$1,000.00 |
$1,090.00 |
$1,465.00 |
$1,000.00 |
$1,108.80 |
$1,270.14 |
$1,003.00 |
| 73 | 644-7033 |
IN SM RD SN SUP&AM TYS80(1)SA(U-2EXT) | 5 | EA |
$1,235.00 |
$1,100.00 |
$1,000.00 |
$1,090.00 |
$1,700.00 |
$1,000.00 |
$1,108.80 |
$1,270.14 |
$1,003.00 |
| 74 | 644-7035 |
IN SM RD SN SUP&AM TYS80(1)SA(U-WC) | 2 | EA |
$1,235.00 |
$1,100.00 |
$1,000.00 |
$1,090.00 |
$1,600.00 |
$1,000.00 |
$1,108.80 |
$1,270.14 |
$1,003.00 |
| 75 | 644-7065 |
RELOCATE SM RD SN SUP&AM TY 10BWG | 24 | EA |
|
$720.00 |
$715.00 |
$754.00 |
$835.00 |
$700.00 |
$767.20 |
$878.84 |
$694.00 |
| 76 | 644-7073 |
REMOVE SM RD SN SUP&AM | 203 | EA |
$95.00 |
$110.00 |
$105.00 |
$110.00 |
$105.00 |
$100.00 |
$112.00 |
$128.30 |
$102.00 |
| 77 | 647-7001 |
INSTALL LRSS (STRUCT STEEL) | 548.6 | LB |
$6.18 |
$8.00 |
$7.85 |
$8.50 |
$10.00 |
$13.00 |
$8.40 |
$9.62 |
$8.00 |
| 78 | 647-7003 |
REMOVE LRSA | 1 | EA |
$760.00 |
$1,300.00 |
$1,300.00 |
$1,320.00 |
$1,570.00 |
$1,100.00 |
$1,344.00 |
$1,539.57 |
$1,216.00 |
| 79 | 658-7050 |
INSTL DEL ASSM (D-DY)SZ 1(YFLX)GND | 76 | EA |
|
$95.00 |
$94.00 |
$100.00 |
$157.00 |
$100.00 |
$100.80 |
$115.47 |
$92.00 |
| 80 | 658-7058 |
INSTL OM ASSM (OM-2Z)(WFLX)GND | 60 | EA |
$142.50 |
$95.00 |
$94.00 |
$100.00 |
$157.00 |
$100.00 |
$100.80 |
$115.47 |
$92.00 |
| 81 | 658-7078 |
REMOVE DELIN & OBJECT MARKER ASSMS | 148 | EA |
$23.75 |
$16.00 |
$15.50 |
$16.50 |
$16.00 |
$15.00 |
$16.80 |
$19.24 |
$16.00 |
| 82 | 662-7005 |
WK ZN PAV MRK NON-REMOV (W)6"(BRK) | 25,540 | LF |
$0.4800 |
$0.3100 |
$0.3100 |
$0.3300 |
$0.3100 |
$0.3000 |
$0.3400 |
$0.3100 |
$0.3000 |
| 83 | 662-7008 |
WK ZN PAV MRK NON-REMOV (W)6"(SLD) | 217,255 | LF |
$0.4800 |
$0.3100 |
$0.3000 |
$0.3200 |
$0.3000 |
$0.2900 |
$0.3200 |
$0.2700 |
$0.3000 |
| 84 | 662-7012 |
WK ZN PAV MRK NON-REMOV (W)8"(SLD) | 29,020 | LF |
$0.9500 |
$0.3600 |
$0.3700 |
$0.3800 |
$0.3700 |
$0.3500 |
$0.3900 |
$0.4600 |
$0.3500 |
| 85 | 662-7038 |
WK ZN PAV MRK NON-REMOV (Y)6"(SLD) | 217,255 | LF |
$0.4800 |
$0.3100 |
$0.3000 |
$0.3200 |
$0.3000 |
$0.2900 |
$0.3200 |
$0.2700 |
$0.3000 |
| 86 | 662-7047 |
WK ZN PAV MRK REMOV (REFL) TY I-A | 6,252 | EA |
$4.75 |
$4.50 |
$4.50 |
$4.70 |
$4.50 |
$4.30 |
$4.82 |
$6.41 |
$4.35 |
| 87 | 662-7049 |
WK ZN PAV MRK REMOV (REFL) TY I-C | 6,204 | EA |
$4.75 |
$4.50 |
$4.50 |
$4.70 |
$4.50 |
$4.30 |
$4.82 |
$6.41 |
$4.35 |
| 88 | 662-7057 |
WK ZN PAV MRK REMOV (TRAF BTN) TY W | 18,557 | EA |
$9.50 |
$4.00 |
$3.90 |
$4.10 |
$3.95 |
$3.75 |
$4.20 |
$5.77 |
$3.80 |
| 89 | 662-7059 |
WK ZN PAV MRK REMOV (TRAF BTN) TY Y | 18,696 | EA |
$9.50 |
$4.00 |
$3.90 |
$4.10 |
$3.95 |
$3.75 |
$4.20 |
$5.77 |
$3.80 |
| 90 | 662-7112 |
WK ZN PAV MRK SHT TERM (TAB)TY W | 9,113 | EA |
$1.66 |
$1.25 |
$1.55 |
$1.25 |
$1.50 |
$1.25 |
$2.26 |
$2.57 |
$1.55 |
| 91 | 662-7114 |
WK ZN PAV MRK SHT TERM (TAB)TY Y-2 | 320 | EA |
$1.43 |
$1.25 |
$1.55 |
$1.20 |
$1.55 |
$1.25 |
$2.44 |
$2.57 |
$1.55 |
| 92 | 666-7018 |
REFL PAV MRK TY I (W)8"(DOT)(100MIL) | 1,702 | LF |
$0.9500 |
$1.10 |
$1.05 |
$1.10 |
$1.05 |
$1.00 |
$1.12 |
$2.18 |
$1.05 |
| 93 | 666-7024 |
REFL PAV MRK TY I (W)8"(SLD)(100MIL) | 28,140 | LF |
$1.14 |
$1.00 |
$0.9400 |
$1.00 |
$0.9400 |
$0.9000 |
$1.01 |
$1.80 |
$0.9500 |
| 94 | 666-7290 |
TY I HIGH PERF PM (W)6"(BRK)(100MIL) | 25,560 | LF |
$0.6700 |
$0.7500 |
$0.7300 |
$0.7700 |
$0.7300 |
$0.7000 |
$0.7800 |
$0.9800 |
$0.7500 |
| 95 | 666-7305 |
TY I HIGH PERF PM (Y)6"(SLD)(100MIL) | 104,980 | LF |
$0.4800 |
$0.7000 |
$0.6800 |
$0.7200 |
$0.6800 |
$0.6500 |
$0.7300 |
$0.9500 |
$0.7000 |
| 96 | 668-7089 |
PREFAB PM TY C (W)(24")(SLD) | 525 | LF |
$19.00 |
$18.00 |
$18.00 |
$17.70 |
$17.80 |
$17.50 |
$19.06 |
$15.40 |
$17.25 |
| 97 | 668-7091 |
PREFAB PM TY C (W)(ARROW) | 88 | EA |
$237.50 |
$240.00 |
$235.00 |
$250.00 |
$235.00 |
$225.00 |
$252.00 |
$224.52 |
$228.00 |
| 98 | 668-7111 |
PREFAB PM TY C (W)(36")(YLD TRI) | 210 | EA |
$33.25 |
$60.00 |
$59.00 |
$62.00 |
$59.00 |
$56.50 |
$63.28 |
$60.94 |
$58.00 |
| 99 | 672-7004 |
REFL PAV MRKR TY II-A-A | 398 | EA |
$3.80 |
$5.30 |
$5.25 |
$5.50 |
$5.25 |
$5.00 |
$5.60 |
$6.41 |
$5.10 |
| 100 | 672-7006 |
REFL PAV MRKR TY II-C-R | 1,787 | EA |
$4.75 |
$4.50 |
$4.20 |
$4.40 |
$4.20 |
$4.00 |
$4.48 |
$6.41 |
$4.05 |
| 101 | 677-7002 |
ELIM EXT PM & MRKS (6") | 538,760 | LF |
$0.6000 |
$0.3000 |
$0.6800 |
$0.7000 |
$0.7000 |
$0.6500 |
$0.7300 |
$0.7300 |
$0.7000 |
| 102 | 677-7004 |
ELIM EXT PM & MRKS (8") | 27,240 | LF |
$1.43 |
$0.9000 |
$0.8900 |
$0.9300 |
$0.9000 |
$0.8500 |
$0.9500 |
$0.7300 |
$0.9000 |
| 103 | 678-7008 |
PAV SURF PREP FOR MRK (24") | 525 | LF |
$11.40 |
$2.20 |
$2.10 |
$2.20 |
$2.10 |
$2.00 |
$2.24 |
$1.15 |
$2.05 |
| 104 | 678-7009 |
PAV SURF PREP FOR MRK (ARROW) | 88 | EA |
$142.50 |
$32.00 |
$31.50 |
$33.00 |
$31.35 |
$30.00 |
$33.60 |
$44.90 |
$30.40 |
| 105 | 678-7023 |
PAV SURF PREP FOR MRK (36")(YLD TRI) | 210 | EA |
$23.75 |
$5.50 |
$5.25 |
$5.50 |
$5.25 |
$5.00 |
$5.60 |
$25.66 |
$5.10 |
| 106 | 730-7019 |
FULL - WIDTH MOWING | 6 | CYC |
$5,700.00 |
$5,000.00 |
$5,100.00 |
$4,600.00 |
$30,000.00 |
$16,000.00 |
$15,000.00 |
$8,420.58 |
$5,065.00 |
| 107 | 734-7002 |
LITTER REMOVAL | 6 | CYC |
$2,850.00 |
$7,500.00 |
$4,300.00 |
$2,815.00 |
$20,000.00 |
$4,525.00 |
$15,000.00 |
$15,914.60 |
$3,925.00 |
| 108 | 3002-7001 |
REINFORCED FAB FOR ASPH PVMNT OVERLAYS | 323,897.02 | SY |
$6.80 |
$6.50 |
$6.80 |
$6.90 |
$6.50 |
$7.00 |
$7.13 |
$8.12 |
$7.00 |
| 109 | 3002-7002 |
ASPH FOR REINF FAB (PG76-28) | 48,584.55 | GAL |
$4.75 |
$5.00 |
$3.50 |
$5.00 |
$3.85 |
$6.00 |
$5.81 |
$5.37 |
$6.00 |
| 110 | 6016-7001 |
TEMP SPEED MONITOR SYS | 2 | EA |
$12,825.00 |
$12,000.00 |
$8,900.00 |
$16,500.00 |
$31,265.00 |
$20,000.00 |
$13,200.24 |
$22,963.59 |
$20,560.00 |
| 23 | 416-7040 |
DRILL SHAFT (RDWY ILL POLE) (30 IN) | 160 | LF |
$380.00 |
|
|
|
|
|
|
|
|
| 24 | 432-7004 |
RIPRAP (CONC)(CL A) | 54.15 | CY |
$950.00 |
|
|
|
|
|
|
|
|
| 25 | 432-7014 |
RIPRAP (MOW STRIP)(5 IN) | 2,236.12 | CY |
$500.00 |
|
|
|
|
|
|
|
|
| 54 | 543-7016 |
CABLE BARRIER SYS(INSTL)(TL-4)(20 '-0") | 47,420 | LF |
$14.75 |
|
|
|
|
|
|
|
|
| 55 | 543-7018 |
CABLE BARRIER TERM SEC (INSTL)(TL-4) | 32 | EA |
$2,850.00 |
|
|
|
|
|
|
|
|
| 58 | 610-7129 |
IN RD IL (TY SA) 40T-12-12(250W EQ)LED | 20 | EA |
$8,550.00 |
|
|
|
|
|
|
|
|
| 59 | 618-7009 |
CONDT (HDPE) (2") | 3,520 | LF |
$14.25 |
|
|
|
|
|
|
|
|
| 60 | 618-7010 |
CONDT (HDPE) (2") BORE | 520 | LF |
$33.25 |
|
|
|
|
|
|
|
|
| 61 | 620-7009 |
ELEC CONDR (NO.6) BARE | 4,040 | LF |
$2.61 |
|
|
|
|
|
|
|
|
| 62 | 620-7010 |
ELEC CONDR (NO.6) INSULATED | 8,080 | LF |
$2.99 |
|
|
|
|
|
|
|
|
| 63 | 624-7002 |
GROUND BOX TY A (122311)W/APRON | 2 | EA |
$1,900.00 |
|
|
|
|
|
|
|
|
| 64 | 628-7009 |
ELC SRV TY A 120/240 060(NS)SS(E)SP(O) | 2 | EA |
$9,500.00 |
|
|
|
|
|
|
|
|
| 79 | 658-7050 |
INSTL DEL ASSM (D-DY)SZ 1(YFLX)GND | 32 | EA |
$142.50 |
|
|
|
|
|
|
|
|
| 81 | 658-7078 |
REMOVE DELIN & OBJECT MARKER ASSMS | 32 | EA |
$23.75 |
|
|
|
|
|
|
|
|
| 10 | 150-7001 |
BLADING | 10 | STA |
$114.00 |
|
|
|
|
|
|
|
|
| 12 | 314-7011 |
EMULS ASPH (EROSN CONT)(CSS-1H) | 24,237.38 | GAL |
$3.50 |
|
|
|
|
|
|
|
|
| 24 | 432-7004 |
RIPRAP (CONC)(CL A) | 80.03 | CY |
$950.00 |
|
|
|
|
|
|
|
|
| 25 | 432-7014 |
RIPRAP (MOW STRIP)(5 IN) | 1,995.84 | CY |
$500.00 |
|
|
|
|
|
|
|
|
| 43 | 505-7001 |
TMA (STATIONARY) | 300 | DAY |
$199.50 |
|
|
|
|
|
|
|
|
| 44 | 505-7003 |
TMA (MOBILE OPERATION) | 15 | DAY |
$247.00 |
|
|
|
|
|
|
|
|
| 45 | 506-7020 |
CONSTRUCTION EXITS (INSTALL) (TY 1) | 120 | SY |
$57.00 |
|
|
|
|
|
|
|
|
| 46 | 506-7024 |
CONSTRUCTION EXITS (REMOVE) | 120 | SY |
$9.50 |
|
|
|
|
|
|
|
|
| 47 | 506-7035 |
SANDBAGS FOR EROSION CONTROL | 100 | EA |
$9.50 |
|
|
|
|
|
|
|
|
| 48 | 506-7045 |
BIODEG EROSN CONT LOGS (INSTL) (18") | 1,480 | LF |
$11.40 |
|
|
|
|
|
|
|
|
| 49 | 506-7046 |
BIODEG EROSN CONT LOGS (REMOVE) | 740 | LF |
$2.85 |
|
|
|
|
|
|
|
|
| 54 | 543-7016 |
CABLE BARRIER SYS(INSTL)(TL-4)(20 '-0") | 41,900 | LF |
$14.75 |
|
|
|
|
|
|
|
|
| 55 | 543-7018 |
CABLE BARRIER TERM SEC (INSTL)(TL-4) | 44 | EA |
$2,850.00 |
|
|
|
|
|
|
|
|
| 75 | 644-7065 |
RELOCATE SM RD SN SUP&AM TY 10BWG | 24 | EA |
$522.50 |
|
|
|
|
|
|
|
|
| 79 | 658-7050 |
INSTL DEL ASSM (D-DY)SZ 1(YFLX)GND | 44 | EA |
$142.50 |
|
|
|
|
|
|
|
|
| 81 | 658-7078 |
REMOVE DELIN & OBJECT MARKER ASSMS | 44 | EA |
$23.75 |
|
|
|
|
|
|
|
|
| 106 | 730-7019 |
FULL - WIDTH MOWING | 3 | CYC |
$5,700.00 |
|
|
|
|
|
|
|
|
| 107 | 734-7002 |
LITTER REMOVAL | 3 | CYC |
$2,850.00 |
|
|
|
|
|
|
|
|