| 1 | 100-7004 |
PREP ROW (TREE REMOVE) (12"-24" DIA) | 10 | EA |
$3,500.00 |
$400.00 |
$1,500.00 |
$800.00 |
$500.00 |
$100.00 |
$2,000.00 |
| 2 | 100-7005 |
PREP ROW (TREE REMOVE) (24"-36" DIA) | 10 | EA |
$3,500.00 |
$500.00 |
$1,000.00 |
$1,200.00 |
$1,000.00 |
$200.00 |
$2,000.00 |
| 3 | 104-7006 |
REMOV CONC (RIPRAP) | 17 | SY |
$187.00 |
$27.00 |
$50.00 |
$270.00 |
$150.00 |
$75.00 |
$250.00 |
| 4 | 401-7001 |
FLOWABLE BACKFILL | 32 | CY |
$1,700.00 |
$525.00 |
$750.00 |
$675.00 |
$500.00 |
$350.00 |
$500.00 |
| 5 | 420-7064 |
CL C CONC (COLUMN ENCASEMENT) | 1.5 | CY |
$3,500.00 |
$4,500.00 |
$2,500.00 |
$17,600.00 |
$10,000.00 |
$2,000.00 |
$15,000.00 |
| 6 | 429-7002 |
CONC STR REPAIR (EPOXY MORTAR) | 45 | SF |
$250.00 |
$140.00 |
$250.00 |
$230.00 |
$300.00 |
$300.00 |
$350.00 |
| 7 | 429-7005 |
CONC STR REPAIR(DECK REP (FULL DEPTH)) | 32 | SF |
$250.00 |
$100.00 |
$750.00 |
$900.00 |
$200.00 |
$350.00 |
$350.00 |
| 8 | 429-7007 |
CONC STR REPAIR (VERTICAL & OVERHEAD) | 534 | SF |
$425.00 |
$430.00 |
$750.00 |
$347.00 |
$175.00 |
$420.00 |
$325.00 |
| 9 | 429-7009 |
CONC STR REPAIR (STANDARD) | 20 | SF |
$350.00 |
$225.00 |
$750.00 |
$500.00 |
$200.00 |
$400.00 |
$325.00 |
| 10 | 432-7003 |
RIPRAP (CONC)(6 IN) | 1 | CY |
$2,045.00 |
$1,000.00 |
$1,000.00 |
$9,160.00 |
$1,000.00 |
$2,000.00 |
$2,500.00 |
| 11 | 432-7043 |
RIPRAP (STONE PROTECTION)(18 IN) | 110 | CY |
$250.00 |
$255.00 |
$400.00 |
$300.00 |
$225.00 |
$350.00 |
$350.00 |
| 12 | 432-7045 |
RIPRAP (STONE PROTECTION)(24 IN) | 199 | CY |
$320.00 |
$250.00 |
$400.00 |
$300.00 |
$225.00 |
$350.00 |
$350.00 |
| 13 | 438-7004 |
CLEANING AND SEALING EXIST JOINTS (CL3) | 180 | LF |
$60.00 |
$70.00 |
$75.00 |
$58.00 |
$75.00 |
$65.00 |
$85.00 |
| 14 | 446-7005 |
CLEAN & PAINT EXIST RAIL (SYSTEM II) | 1 | LS |
$25,000.00 |
$156,000.00 |
$150,000.00 |
$180,000.00 |
$150,000.00 |
$50,000.00 |
$250,000.00 |
| 15 | 446-7021 |
CLEAN AND PAINT EXIST STR (REF NO. 2) | 8 | EA |
$2,500.00 |
$5,645.00 |
$4,800.00 |
$6,480.00 |
$4,800.00 |
$20,000.00 |
$18,000.00 |
| 16 | 495-7001 |
RAISING EXIST STRUCT | 3 | LS |
$32,000.00 |
$15,000.00 |
$5,000.00 |
$26,200.00 |
$75,000.00 |
$20,000.00 |
$100,000.00 |
| 17 | 500-7001 |
MOBILIZATION | 1 | LS |
$169,820.77 |
$61,000.00 |
$100,000.00 |
$123,000.00 |
$150,000.00 |
$120,000.00 |
$200,000.00 |
| 18 | 502-7001 |
BARRICADES, SIGNS AND TRAFFIC HANDLING | 12 | MO |
$20,000.00 |
$3,785.00 |
$1.00 |
$4,000.00 |
$5,000.00 |
$1.00 |
$2,000.00 |
| 19 | 503-7001 |
PORTABLE CHANGEABLE MESSAGE SIGN | 260 | DAY |
$187.62 |
$1.00 |
$1.00 |
$120.00 |
$100.00 |
$1.00 |
$50.00 |
| 20 | 505-7001 |
TMA (STATIONARY) | 100 | DAY |
$473.03 |
$100.00 |
$1.00 |
$225.00 |
$400.00 |
$1.00 |
$300.00 |
| 21 | 505-7003 |
TMA (MOBILE OPERATION) | 100 | DAY |
$473.33 |
$1.00 |
$1.00 |
$600.00 |
$400.00 |
$1.00 |
$300.00 |
| 22 | 506-7035 |
SANDBAGS FOR EROSION CONTROL | 100 | EA |
$40.00 |
$2.00 |
$10.00 |
$11.00 |
$10.00 |
$20.00 |
$10.00 |
| 23 | 506-7040 |
TEMP SDMT CONT FENCE (INLET PROTECTION) | 750 | LF |
$10.00 |
$2.00 |
$4.00 |
$7.00 |
$15.00 |
$3.00 |
$12.00 |
| 24 | 506-7041 |
TEMP SEDMT CONT FENCE (REMOVE) | 750 | LF |
$10.00 |
$1.00 |
$1.00 |
$1.15 |
$1.00 |
$3.00 |
$5.00 |
| 25 | 506-7044 |
BIODEG EROSN CONT LOGS (INSTL) (12") | 100 | LF |
$28.34 |
$2.00 |
$4.00 |
$12.00 |
$10.00 |
$5.00 |
$25.00 |
| 26 | 506-7046 |
BIODEG EROSN CONT LOGS (REMOVE) | 100 | LF |
$50.00 |
$1.00 |
$1.00 |
$2.30 |
$1.00 |
$50.00 |
$5.00 |
| 27 | 540-7003 |
MTL THRIE-BEAM GD FEN (TIM POST) | 20 | LF |
$100.00 |
$30.00 |
$125.00 |
$150.00 |
$150.00 |
$100.00 |
$100.00 |
| 28 | 542-7001 |
REMOVE METAL BEAM GUARD FENCE | 20 | LF |
$80.00 |
$3.00 |
$75.00 |
$30.00 |
$5.00 |
$50.00 |
$20.00 |
| 29 | 712-7004 |
JT / CRCK ROUT / SEAL(RUBBER - ASPHALT) | 50 | LF |
$1,200.00 |
$45.00 |
$125.00 |
$65.00 |
$175.00 |
$50.00 |
$20.00 |
| 30 | 770-7006 |
REPLACE TIMBER POST W/O CONC FND | 11 | EA |
$200.00 |
$25.00 |
$100.00 |
$1,420.00 |
$25.00 |
$200.00 |
$250.00 |
| 31 | 778-7004 |
CONCRETE RAIL REPLACEMENT (IN-KIND) | 2 | LF |
$340.00 |
$145.00 |
$1,000.00 |
$2,500.00 |
$500.00 |
$400.00 |
$2,500.00 |
| 32 | 780-7005 |
CNC CRACK REPAIR (FLOOD)(GRAVITY) | 495 | SF |
$40.00 |
$12.00 |
$15.00 |
$29.00 |
$75.00 |
$20.00 |
$10.00 |
| 33 | 784-7002 |
REP STL BRIDGE MEMBER (BEAM) | 1 | EA |
$40,000.00 |
$5,000.00 |
$2,500.00 |
$9,255.00 |
$50,000.00 |
$50,000.00 |
$50,000.00 |
| 34 | 784-7008 |
REP STL BRIDGE MEMBER (BEARINGS) | 20 | EA |
$4,000.00 |
$2,000.00 |
$500.00 |
$1,500.00 |
$5,000.00 |
$15,000.00 |
$12,000.00 |
| 35 | 786-7002 |
CARBON FIBER REINF POLYMER STRENGTHNING | 25 | SF |
$155.13 |
$85.00 |
$500.00 |
$500.00 |
$150.00 |
$165.00 |
$200.00 |
| 36 | 787-7001 |
REPLACING ELASTOMERIC BEARING PADS | 20 | EA |
$8,000.00 |
$3,180.00 |
$1,000.00 |
$4,900.00 |
$3,000.00 |
$15,000.00 |
$5,000.00 |
| 37 | 788-7001 |
CONCRETE BEAM REPAIR | 3 | EA |
$20,000.00 |
$3,950.00 |
$2,500.00 |
$6,200.00 |
$25,000.00 |
$10,000.00 |
$10,000.00 |