Bid tab 0914-00-509

Let Mar 5, 2026 · Austin · Travis Sign up free

‹ Mar 2026 results

FY 26 FUA - AUS BR Maint

Let date
Thursday, March 5, 2026
CCSJ
0914-00-509
District
Austin
County
Travis
Highway
Various
Limits
Various Bridge locations: Burnet to Blanco, Gillespie, Llano & Mason
Classification
Bridge Maintenance · Construction
Project number
C 914-00-509
Working days
237
DBE goal
0%

Bidders 14

#ContractorTotal bidvs estimatevs low
EEEngineer's estimate$1,877,685
1 PREMIER CONTRACTORS LLC Low bidder $1,606,502 -14.4%
2 TAYLOR BRIDGE LLC $1,728,062 -8.0% +7.6%
3 BLACKSMITH VENTURES LLC $1,732,650 -7.7% +7.9%
4 GARRET SHIELDS INFRASTRUCTURE $1,777,320 -5.3% +10.6%
5 BK FIELD OPERATIONS LLC $1,872,338 -0.3% +16.5%
6 STRUCTURAL INTEGRITY GROUP LLC $1,938,906 +3.3% +20.7%
7 ROY JORGENSEN ASSOCIATES, INC. $1,979,350 +5.4% +23.2%
8 PATHFIELD INVESTMENTS LLC $2,021,540 +7.7% +25.8%
9 SCR CIVIL CONSTRUCTION, LLC $2,109,909 +12.4% +31.3%
10 RESTEK, INC. $2,131,289 +13.5% +32.7%
11 MPB, INC. $2,693,095 +43.4% +67.6%
12 ICOS MANAGEMENT, LLC $2,706,305 +44.1% +68.5%
13 SOUTHERN ROAD & BRIDGE, LLC $2,807,140 +49.5% +74.7%
14 BUILT RIGHT CONSTRUCTION OF OKLAHOMA, LLC $3,912,545 +108.4% +143.5%

Bid tab: unit prices 32 items

ExcelCSV
SeqBid codeDescriptionQtyUnitEstimate #1 PREMIER CONTRAC…#2 TAYLOR BRIDGE L…#3 BLACKSMITH VENT…#4 GARRET SHIELDS …#5 BK FIELD OPERAT…#6 STRUCTURAL INTE…#7 ROY JORGENSEN A…#8 PATHFIELD INVES…
1100-7004 PREP ROW (TREE REMOVE) (12"-24" DIA)6EA $1,500.00 $500.00 $300.00 $1,200.00 $1,000.00 $300.00 $500.00 $1.00 $500.00
2100-7005 PREP ROW (TREE REMOVE) (24"-36" DIA)6EA $1,200.00 $1,500.00 $600.00 $2,500.00 $2,000.00 $400.00 $650.00 $1.00 $2,000.00
3104-7006 REMOV CONC (RIPRAP)9SY $200.00 $300.00 $100.00 $300.00 $40.00 $800.00 $145.25 $50.00 $400.00
4351-7001 FLEXIBLE PAVEMENT STRUCTURE REPAIR(2")2SY $1,500.00 $250.00 $500.00 $1,200.00 $100.00 $800.00 $1.00 $500.00 $1,700.00
5401-7001 FLOWABLE BACKFILL9CY $550.00 $1,000.00 $350.00 $400.00 $400.00 $700.00 $1,400.00 $300.00 $1,100.00
6420-7011 CL B CONC (MISC)5CY $600.00 $1,000.00 $750.00 $700.00 $1,000.00 $1,000.00 $2,200.00 $750.00 $1,200.00
7420-7044 CL C CONC (FOOTING)8CY $2,500.00 $1,500.00 $1,000.00 $800.00 $1,500.00 $1,200.00 $1,750.00 $600.00 $1,400.00
8420-7067 CL C CONC (MISC)18CY $1,100.00 $2,000.00 $850.00 $700.00 $1,000.00 $950.00 $1,940.00 $1,000.00 $2,000.00
9429-7002 CONC STR REPAIR (EPOXY MORTAR)45SF $295.00 $300.00 $175.00 $200.00 $200.00 $140.00 $215.00 $100.00 $200.00
10429-7005 CONC STR REPAIR(DECK REP (FULL DEPTH))10SF $500.00 $1,500.00 $500.00 $600.00 $250.00 $400.00 $1,523.00 $250.00 $400.00
11429-7007 CONC STR REPAIR (VERTICAL & OVERHEAD)631SF $430.00 $500.00 $400.00 $180.00 $180.00 $120.00 $367.00 $100.00 $290.00
12429-7009 CONC STR REPAIR (STANDARD)35SF $225.00 $300.00 $200.00 $200.00 $150.00 $350.00 $138.00 $100.00 $260.00
13432-7029 RIPRAP (STONE COMMON)(DRY)(6 IN)5CY $250.00 $300.00 $1,000.00 $600.00 $200.00 $500.00 $1,165.00 $300.00 $400.00
14432-7045 RIPRAP (STONE PROTECTION)(24 IN)916CY $230.00 $250.00 $200.00 $180.00 $180.00 $210.00 $185.00 $175.00 $340.00
15438-7001 CLEANING AND SEALING EXISTING JOINTS221LF $110.00 $70.00 $100.00 $45.00 $40.00 $80.00 $58.00 $35.00 $90.00
16446-7002 CLEAN & PAINT EXIST STR (SYSTEM II)2LS $288,500.00 $250,000.00 $400,000.00 $400,000.00 $420,000.00 $501,630.00 $419,600.00 $490,000.00 $395,000.00
17446-7005 CLEAN & PAINT EXIST RAIL (SYSTEM II)3LS $21,350.00 $25,000.00 $30,000.00 $50,000.00 $50,000.00 $65,412.00 $54,720.00 $75,256.12 $75,000.00
18446-7009 CLEAN & PAINT EXIST PIL (SPL PROT SYS)1LS $5,000.00 $25,000.00 $25,000.00 $30,000.00 $35,000.00 $36,000.00 $28,860.00 $36,000.00 $30,000.00
19446-7021 CLEAN AND PAINT EXIST STR (REF NO. 2)40EA $721.00 $500.00 $1,000.00 $1,000.00 $2,200.00 $1,350.00 $1,082.00 $1,390.00 $1,000.00
20459-7008 GABION MATTRESSES (GALV)(18 IN)20SY $220.00 $500.00 $285.00 $350.00 $300.00 $300.00 $525.00 $250.00 $450.00
21459-7010 GABIONS (3' X 3')(GALV)25CY $500.00 $500.00 $325.00 $350.00 $300.00 $350.00 $400.00 $500.00 $300.00
22480-7002 CLEAN EXIST CULVERTS16CY $75.00 $500.00 $250.00 $300.00 $150.00 $200.00 $707.00 $500.00 $1,000.00
23500-7001 MOBILIZATION1LS $270,000.00 $150,000.00 $200,000.00 $100,000.00 $100,000.00 $130,000.00 $179,000.00 $280,000.00 $180,000.00
24502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING12MO $5,000.00 $1.00 $1.00 $5,000.00 $5,000.00 $1.00 $5,500.00 $1,000.00 $2,000.00
25503-7001 PORTABLE CHANGEABLE MESSAGE SIGN260DAY $100.00 $1.00 $1.00 $1.00 $100.00 $1.00 $50.00 $10.00 $1.00
26505-7001 TMA (STATIONARY)130DAY $100.00 $1.00 $1.00 $1.00 $300.00 $1.00 $125.00 $250.00 $1.00
27505-7003 TMA (MOBILE OPERATION)130DAY $100.00 $1.00 $1.00 $1.00 $300.00 $1.00 $1.00 $1.00 $1.00
28506-7035 SANDBAGS FOR EROSION CONTROL130EA $10.00 $35.00 $1.00 $5.00 $2.00 $15.00 $5.00 $1.00 $25.00
29770-7010 REALIGN POSTS2EA $100.00 $1,000.00 $1,000.00 $1,000.00 $100.00 $800.00 $1,000.00 $200.00 $500.00
30776-7001 REPAIR (STEEL RAIL)55LF $320.00 $250.00 $125.00 $125.00 $200.00 $300.00 $415.00 $75.00 $350.00
31780-7005 CNC CRACK REPAIR (FLOOD)(GRAVITY)75SF $15.00 $100.00 $75.00 $70.00 $10.00 $100.00 $21.00 $10.00 $300.00
32788-7001 CONCRETE BEAM REPAIR20EA $9,000.00 $5,000.00 $1,000.00 $7,500.00 $500.00 $2,250.00 $1.00 $2,500.00 $1,500.00

Showing the first 8 bidders. The Excel and CSV downloads include all 14.