| 1 | 104-7006 |
REMOV CONC (RIPRAP) | 55 | SY |
$80.00 |
$41.30 |
$25.00 |
$165.00 |
$150.00 |
$100.00 |
| 2 | 104-7032 |
REMOV CONC (ABUTMENT BACKWALL) | 28 | CY |
$1,650.00 |
$531.00 |
$50.00 |
$66.00 |
$3,000.00 |
$500.00 |
| 3 | 110-7002 |
EXCAV (CHANNEL) | 60 | CY |
$75.00 |
$147.50 |
$100.00 |
$66.00 |
$50.00 |
$150.00 |
| 4 | 132-7003 |
EMBANK (FNL)(OC)(TY B) | 564 | CY |
$75.00 |
$29.50 |
$25.00 |
$55.00 |
$50.00 |
$257.00 |
| 5 | 164-7010 |
DRILL SEED (PERM_RURAL_CLAY) | 4,310 | SY |
|
$4.72 |
$1.55 |
$1.00 |
$4.84 |
$0.6600 |
| 6 | 354-7033 |
PLANE ASPH CONC PAV(0" TO 3") | 6,118 | SY |
$10.00 |
$8.26 |
$17.00 |
$38.00 |
$13.75 |
$25.00 |
| 7 | 361-7008 |
FULL - DEPTH REPAIR CRCP (13") | 14 | CY |
$400.00 |
$1,416.00 |
$1,000.00 |
$2,160.00 |
$1,500.00 |
$2,000.00 |
| 8 | 400-7004 |
STRUCT EXCAV (BRIDGE) | 226 | CY |
$75.00 |
$147.50 |
$20.00 |
$86.00 |
$180.00 |
$56.00 |
| 9 | 400-7010 |
CEM STABIL BKFL | 226 | CY |
$400.00 |
$484.96 |
$300.00 |
$302.00 |
$360.00 |
$186.00 |
| 10 | 401-7001 |
FLOWABLE BACKFILL | 19 | CY |
$650.00 |
$472.00 |
$300.00 |
$302.00 |
$715.00 |
$431.00 |
| 11 | 403-7001 |
TEMPORARY SPL SHORING | 960 | SF |
$45.00 |
$41.30 |
$65.00 |
$10.00 |
$1.20 |
$71.00 |
| 12 | 420-7012 |
CL C CONC (ABUT) | 48 | CY |
$2,250.00 |
$1,178.82 |
$700.00 |
$1,760.00 |
$3,900.00 |
$1,700.00 |
| 13 | 422-7013 |
APPROACH SLAB | 60 | CY |
$1,300.00 |
$1,003.00 |
$700.00 |
$1,100.00 |
$1,560.00 |
$950.00 |
| 14 | 427-7005 |
EPOXY WATERPROOF FINISH (TY X) | 10,229 | SF |
$13.50 |
$17.70 |
$10.00 |
$8.00 |
$7.70 |
$7.00 |
| 15 | 429-7003 |
CONC STR REPAIR(DECK REP(PART DEPTH)) | 1,652 | SF |
$100.00 |
$171.10 |
$320.00 |
$121.00 |
$25.00 |
$25.00 |
| 16 | 429-7005 |
CONC STR REPAIR(DECK REP (FULL DEPTH)) | 551 | SF |
$180.00 |
$194.70 |
$300.00 |
$132.00 |
$50.00 |
$92.00 |
| 17 | 429-7007 |
CONC STR REPAIR (VERTICAL & OVERHEAD) | 408 | SF |
$195.00 |
$208.86 |
$230.00 |
$165.00 |
$220.00 |
$150.00 |
| 18 | 432-7001 |
RIPRAP (CONC)(4 IN) | 258 | CY |
$725.00 |
$531.00 |
$550.00 |
$540.00 |
$588.63 |
$750.00 |
| 19 | 432-7002 |
RIPRAP (CONC)(5 IN) | 48 | CY |
$700.00 |
$767.00 |
$600.00 |
$756.00 |
$664.49 |
$750.00 |
| 20 | 432-7013 |
RIPRAP (MOW STRIP)(4 IN) | 40 | CY |
|
$885.00 |
$500.00 |
$756.00 |
$595.54 |
$675.00 |
| 21 | 432-7043 |
RIPRAP (STONE PROTECTION)(18 IN) | 6 | CY |
$500.00 |
$1,180.00 |
$250.00 |
$432.00 |
$750.00 |
$650.00 |
| 22 | 438-7010 |
CLEANING AND SEALING JOINTS (FOAM) | 251 | LF |
|
$413.00 |
$100.00 |
$55.00 |
$154.00 |
$88.00 |
| 23 | 439-7003 |
CONCRETE OVERLAY (2.5 IN) | 6,118 | SY |
$128.00 |
$56.25 |
$45.00 |
$86.00 |
$88.00 |
$100.00 |
| 24 | 451-7024 |
RETROFIT RAIL (TY SSTR) | 896 | LF |
|
$149.86 |
$190.00 |
$716.00 |
$206.80 |
$211.00 |
| 25 | 458-7007 |
WATERPROOFING (TY 10) | 72 | SY |
$16.00 |
$206.50 |
$95.00 |
$432.00 |
$120.00 |
$60.00 |
| 26 | 483-7008 |
HYDRO-DEMOLITION (1 IN) | 6,118 | SY |
$77.00 |
$17.70 |
$70.00 |
$46.00 |
$105.61 |
$62.00 |
| 27 | 496-7022 |
REMOV STR (APPROACH SLAB) | 2 | EA |
$4,905.00 |
$8,260.00 |
$1,000.00 |
$21,600.00 |
$21,000.00 |
$5,720.00 |
| 28 | 500-7001 |
MOBILIZATION | 1 | LS |
$350,000.00 |
$322,000.00 |
$250,000.00 |
$80,000.00 |
$642,758.00 |
$550,000.00 |
| 29 | 502-7001 |
BARRICADES, SIGNS AND TRAFFIC HANDLING | 10 | MO |
$20,000.00 |
$11,800.00 |
$3,500.00 |
$1.00 |
$15,000.00 |
$189,000.00 |
| 30 | 503-7002 |
PORTABLE CHANGEABLE MESSAGE SIGN | 2 | EA |
|
$8,260.00 |
$5,000.00 |
$11,000.00 |
$21,000.00 |
$25,000.00 |
| 31 | 505-7001 |
TMA (STATIONARY) | 60 | DAY |
$345.00 |
$182.90 |
$325.00 |
$275.00 |
$350.00 |
$550.00 |
| 32 | 505-7002 |
TMA (MOBILE OPERATION) | 72 | HR |
$100.00 |
$295.00 |
$325.00 |
$220.00 |
$50.00 |
$87.00 |
| 33 | 506-7043 |
BIODEG EROSN CONT LOGS (INSTL) (8") | 1,960 | LF |
|
$14.16 |
$10.00 |
$5.00 |
$12.49 |
$6.75 |
| 34 | 506-7046 |
BIODEG EROSN CONT LOGS (REMOVE) | 1,960 | LF |
|
$2.36 |
$3.00 |
$1.00 |
$10.45 |
$1.50 |
| 35 | 510-7003 |
ONE-WAY TRAF CONT (PORT TRAF SIG) | 4 | MO |
|
$17,700.00 |
$7,500.00 |
$10,800.00 |
$4,750.00 |
$5,000.00 |
| 36 | 512-7017 |
PORT CTB (DES SOURCE)(F-SHAPE)(TY 1) | 1,080 | LF |
$28.00 |
$53.10 |
$120.00 |
$55.00 |
$41.00 |
$15.00 |
| 37 | 512-7029 |
PORT CTB (MOVE)(F-SHAPE)(TY 1) | 2,280 | LF |
$14.00 |
$41.30 |
$35.00 |
$44.00 |
$19.00 |
$10.00 |
| 38 | 512-7041 |
PORT CTB (STKPL)(F-SHAPE)(TY 1) | 1,080 | LF |
$28.00 |
$53.10 |
$35.00 |
$44.00 |
$36.50 |
$15.00 |
| 39 | 512-7070 |
PORT CTB (CONNECTION HARDWARE) | 74 | EA |
$55.00 |
$118.00 |
$150.00 |
$220.00 |
$25.00 |
$198.63 |
| 40 | 514-7001 |
PERM CTB (SGL SLOPE) (TY 1) (42 ) | 840 | LF |
$150.00 |
$90.86 |
$135.00 |
$324.00 |
$160.60 |
$125.00 |
| 41 | 540-7002 |
MTL W-BEAM GD FEN (STEEL POST) | 400 | LF |
|
$118.00 |
$33.00 |
$44.00 |
$36.03 |
$32.75 |
| 42 | 540-7005 |
MTL BEAM GD FEN TRANS (THRIE-BEAM) | 4 | EA |
|
$8,850.00 |
$3,000.00 |
$4,320.00 |
$2,486.00 |
$2,260.00 |
| 43 | 542-7001 |
REMOVE METAL BEAM GUARD FENCE | 800 | LF |
$8.00 |
$17.70 |
$5.00 |
$5.00 |
$3.30 |
$3.00 |
| 44 | 542-7002 |
REMOVE TERMINAL ANCHOR SECTION | 2 | EA |
|
$5,900.00 |
$250.00 |
$550.00 |
$242.00 |
$220.00 |
| 45 | 542-7004 |
RM MTL BM GD FENCE TRANS (THRIE-BEAM) | 2 | EA |
$650.00 |
$9,440.00 |
$250.00 |
$550.00 |
$280.50 |
$255.00 |
| 46 | 544-7001 |
GUARDRAIL END TREATMENT (INSTALL) | 4 | EA |
|
$8,260.00 |
$4,000.00 |
$4,950.00 |
$3,410.00 |
$3,100.00 |
| 47 | 544-7003 |
GUARDRAIL END TREATMENT (REMOVE) | 4 | EA |
$750.00 |
$1,770.00 |
$300.00 |
$550.00 |
$368.50 |
$335.00 |
| 48 | 545-7002 |
CRASH CUSH ATTEN (MOVE & RESET) | 4 | EA |
$3,000.00 |
$5,900.00 |
$2,000.00 |
$5,500.00 |
$2,145.00 |
$1,950.00 |
| 49 | 545-7004 |
CRASH CUSH ATTEN (REMOVE) | 4 | EA |
$2,090.00 |
$5,900.00 |
$1,500.00 |
$5,500.00 |
$1,100.00 |
$1,000.00 |
| 50 | 545-7006 |
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3) | 2 | EA |
$30,000.00 |
$39,900.00 |
$32,000.00 |
$38,500.00 |
$33,715.00 |
$30,650.00 |
| 51 | 545-7014 |
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3) | 4 | EA |
$10,000.00 |
$14,160.00 |
$12,000.00 |
$13,200.00 |
$9,460.00 |
$8,600.00 |
| 52 | 658-7013 |
INSTL DEL ASSM (D-SW)SZ 1(BRF)CTB (BI) | 10 | EA |
|
$64.90 |
$30.00 |
$55.00 |
$45.65 |
$41.50 |
| 53 | 658-7019 |
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI) | 8 | EA |
|
$64.90 |
$35.00 |
$55.00 |
$47.85 |
$43.50 |
| 54 | 662-7008 |
WK ZN PAV MRK NON-REMOV (W)6"(SLD) | 1,265 | LF |
$2.00 |
$2.30 |
$2.50 |
$2.00 |
$2.20 |
$2.00 |
| 55 | 662-7068 |
WK ZN PAV MRK REMOV (W)6"(SLD) | 11,760 | LF |
$2.00 |
$1.44 |
$1.75 |
$2.00 |
$1.38 |
$1.25 |
| 56 | 662-7077 |
WK ZN PAV MRK REMOV (W)24"(SLD) | 24 | LF |
|
$24.15 |
$25.00 |
$33.00 |
$23.10 |
$21.00 |
| 57 | 662-7100 |
WK ZN PAV MRK REMOV (Y)6"(SLD) | 13,480 | LF |
$2.00 |
$1.44 |
$1.75 |
$2.00 |
$1.38 |
$1.25 |
| 58 | 666-7289 |
TY I HIGH PERF PM (W)6"(BRK)(090MIL) | 1,120 | LF |
$1.00 |
$2.88 |
$3.00 |
$3.00 |
$2.75 |
$2.50 |
| 59 | 666-7292 |
TY I HIGH PERF PM (W)6"(SLD)(090MIL) | 5,184 | LF |
$0.8000 |
$2.88 |
$3.00 |
$3.00 |
$2.75 |
$2.50 |
| 60 | 666-7301 |
TY I HIGH PERF PM (Y)6"(BRK)(090MIL) | 170 | LF |
|
$2.88 |
$3.00 |
$3.00 |
$2.75 |
$2.50 |
| 61 | 666-7304 |
TY I HIGH PERF PM (Y)6"(SLD)(090MIL) | 5,454 | LF |
$0.8000 |
$2.88 |
$3.00 |
$3.00 |
$2.75 |
$2.50 |
| 62 | 666-7347 |
PAVEMENT SLER 6" | 11,928 | LF |
$0.2500 |
$1.50 |
$1.80 |
$2.00 |
$1.49 |
$1.35 |
| 63 | 672-7004 |
REFL PAV MRKR TY II-A-A | 68 | EA |
|
$11.50 |
$20.00 |
$17.00 |
$11.00 |
$10.00 |
| 64 | 672-7006 |
REFL PAV MRKR TY II-C-R | 58 | EA |
$7.50 |
$11.50 |
$20.00 |
$17.00 |
$11.00 |
$10.00 |
| 65 | 677-7001 |
ELIM EXT PM & MRKS (4") | 5,720 | LF |
$0.9000 |
$4.60 |
$5.00 |
$5.00 |
$4.40 |
$4.00 |
| 66 | 678-7002 |
PAV SURF PREP FOR MRK (6") | 11,928 | LF |
$0.2000 |
$1.44 |
$1.75 |
$2.00 |
$1.38 |
$1.25 |
| 67 | 713-7004 |
CRACK CLEANING AND SEALING (JCP) | 620 | LF |
$20.00 |
$22.00 |
$25.00 |
$86.00 |
$44.00 |
$22.00 |
| 68 | 778-7004 |
CONCRETE RAIL REPLACEMENT (IN-KIND) | 32 | LF |
$550.00 |
$220.00 |
$250.00 |
$864.00 |
$700.00 |
$600.00 |
| 69 | 785-7011 |
BRIDGE JOINT REPLACEMENT (SEJ) | 270 | LF |
$900.00 |
$357.50 |
$500.00 |
$385.00 |
$1,300.00 |
$540.00 |
| 70 | 786-7001 |
CARBON FIBER REINF POLYMER PROTECTION | 318 | SF |
$135.00 |
$60.50 |
$125.00 |
$86.00 |
$77.00 |
$115.00 |
| 1 | 104-7006 |
REMOV CONC (RIPRAP) | 41 | SY |
$80.00 |
|
|
|
|
|
| 2 | 104-7032 |
REMOV CONC (ABUTMENT BACKWALL) | 14 | CY |
$1,650.00 |
|
|
|
|
|
| 3 | 110-7002 |
EXCAV (CHANNEL) | 30 | CY |
$75.00 |
|
|
|
|
|
| 4 | 132-7003 |
EMBANK (FNL)(OC)(TY B) | 282 | CY |
$75.00 |
|
|
|
|
|
| 5 | 164-7010 |
DRILL SEED (PERM_RURAL_CLAY) | 2,895 | SY |
$0.6000 |
|
|
|
|
|
| 6 | 354-7033 |
PLANE ASPH CONC PAV(0" TO 3") | 1,711 | SY |
$10.00 |
|
|
|
|
|
| 7 | 361-7008 |
FULL - DEPTH REPAIR CRCP (13") | 7 | CY |
$400.00 |
|
|
|
|
|
| 8 | 400-7004 |
STRUCT EXCAV (BRIDGE) | 113 | CY |
$75.00 |
|
|
|
|
|
| 9 | 400-7010 |
CEM STABIL BKFL | 113 | CY |
$400.00 |
|
|
|
|
|
| 10 | 401-7001 |
FLOWABLE BACKFILL | 5 | CY |
$650.00 |
|
|
|
|
|
| 11 | 403-7001 |
TEMPORARY SPL SHORING | 480 | SF |
$45.00 |
|
|
|
|
|
| 12 | 420-7012 |
CL C CONC (ABUT) | 24 | CY |
$2,250.00 |
|
|
|
|
|
| 13 | 422-7013 |
APPROACH SLAB | 30 | CY |
$1,300.00 |
|
|
|
|
|
| 14 | 427-7005 |
EPOXY WATERPROOF FINISH (TY X) | 800 | SF |
$13.50 |
|
|
|
|
|
| 15 | 429-7003 |
CONC STR REPAIR(DECK REP(PART DEPTH)) | 462 | SF |
$100.00 |
|
|
|
|
|
| 16 | 429-7005 |
CONC STR REPAIR(DECK REP (FULL DEPTH)) | 154 | SF |
$180.00 |
|
|
|
|
|
| 17 | 429-7007 |
CONC STR REPAIR (VERTICAL & OVERHEAD) | 55 | SF |
$195.00 |
|
|
|
|
|
| 18 | 432-7001 |
RIPRAP (CONC)(4 IN) | 126 | CY |
$725.00 |
|
|
|
|
|
| 19 | 432-7002 |
RIPRAP (CONC)(5 IN) | 25 | CY |
$700.00 |
|
|
|
|
|
| 21 | 432-7043 |
RIPRAP (STONE PROTECTION)(18 IN) | 3 | CY |
$500.00 |
|
|
|
|
|
| 23 | 439-7003 |
CONCRETE OVERLAY (2.5 IN) | 1,711 | SY |
$128.00 |
|
|
|
|
|
| 25 | 458-7007 |
WATERPROOFING (TY 10) | 36 | SY |
$16.00 |
|
|
|
|
|
| 26 | 483-7008 |
HYDRO-DEMOLITION (1 IN) | 1,711 | SY |
$77.00 |
|
|
|
|
|
| 27 | 496-7022 |
REMOV STR (APPROACH SLAB) | 1 | EA |
$4,905.00 |
|
|
|
|
|
| 28 | 500-7001 |
MOBILIZATION | 0.5 | LS |
$350,000.00 |
|
|
|
|
|
| 29 | 502-7001 |
BARRICADES, SIGNS AND TRAFFIC HANDLING | 4 | MO |
$20,000.00 |
|
|
|
|
|
| 31 | 505-7001 |
TMA (STATIONARY) | 20 | DAY |
$345.00 |
|
|
|
|
|
| 32 | 505-7002 |
TMA (MOBILE OPERATION) | 24 | HR |
$100.00 |
|
|
|
|
|
| 33 | 506-7043 |
BIODEG EROSN CONT LOGS (INSTL) (8") | 1,040 | LF |
$7.00 |
|
|
|
|
|
| 34 | 506-7046 |
BIODEG EROSN CONT LOGS (REMOVE) | 1,040 | LF |
$2.75 |
|
|
|
|
|
| 37 | 512-7029 |
PORT CTB (MOVE)(F-SHAPE)(TY 1) | 1,080 | LF |
$14.00 |
|
|
|
|
|
| 38 | 512-7041 |
PORT CTB (STKPL)(F-SHAPE)(TY 1) | 540 | LF |
$28.00 |
|
|
|
|
|
| 39 | 512-7070 |
PORT CTB (CONNECTION HARDWARE) | 18 | EA |
$55.00 |
|
|
|
|
|
| 40 | 514-7001 |
PERM CTB (SGL SLOPE) (TY 1) (42 ) | 420 | LF |
$150.00 |
|
|
|
|
|
| 43 | 542-7001 |
REMOVE METAL BEAM GUARD FENCE | 125 | LF |
$8.00 |
|
|
|
|
|
| 45 | 542-7004 |
RM MTL BM GD FENCE TRANS (THRIE-BEAM) | 1 | EA |
$650.00 |
|
|
|
|
|
| 47 | 544-7003 |
GUARDRAIL END TREATMENT (REMOVE) | 1 | EA |
$750.00 |
|
|
|
|
|
| 48 | 545-7002 |
CRASH CUSH ATTEN (MOVE & RESET) | 1 | EA |
$3,000.00 |
|
|
|
|
|
| 49 | 545-7004 |
CRASH CUSH ATTEN (REMOVE) | 1 | EA |
$2,090.00 |
|
|
|
|
|
| 50 | 545-7006 |
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3) | 1 | EA |
$30,000.00 |
|
|
|
|
|
| 51 | 545-7014 |
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3) | 1 | EA |
$10,000.00 |
|
|
|
|
|
| 54 | 662-7008 |
WK ZN PAV MRK NON-REMOV (W)6"(SLD) | 390 | LF |
$2.00 |
|
|
|
|
|
| 55 | 662-7068 |
WK ZN PAV MRK REMOV (W)6"(SLD) | 4,310 | LF |
$2.00 |
|
|
|
|
|
| 57 | 662-7100 |
WK ZN PAV MRK REMOV (Y)6"(SLD) | 3,540 | LF |
$2.00 |
|
|
|
|
|
| 58 | 666-7289 |
TY I HIGH PERF PM (W)6"(BRK)(090MIL) | 560 | LF |
$1.00 |
|
|
|
|
|
| 59 | 666-7292 |
TY I HIGH PERF PM (W)6"(SLD)(090MIL) | 387 | LF |
$0.8000 |
|
|
|
|
|
| 61 | 666-7304 |
TY I HIGH PERF PM (Y)6"(SLD)(090MIL) | 387 | LF |
$0.8000 |
|
|
|
|
|
| 62 | 666-7347 |
PAVEMENT SLER 6" | 1,334 | LF |
$0.2500 |
|
|
|
|
|
| 64 | 672-7006 |
REFL PAV MRKR TY II-C-R | 29 | EA |
$7.50 |
|
|
|
|
|
| 65 | 677-7001 |
ELIM EXT PM & MRKS (4") | 1,790 | LF |
$0.9000 |
|
|
|
|
|
| 66 | 678-7002 |
PAV SURF PREP FOR MRK (6") | 1,334 | LF |
$0.2000 |
|
|
|
|
|
| 67 | 713-7004 |
CRACK CLEANING AND SEALING (JCP) | 250 | LF |
$20.00 |
|
|
|
|
|
| 68 | 778-7004 |
CONCRETE RAIL REPLACEMENT (IN-KIND) | 16 | LF |
$550.00 |
|
|
|
|
|
| 69 | 785-7011 |
BRIDGE JOINT REPLACEMENT (SEJ) | 82 | LF |
$900.00 |
|
|
|
|
|
| 70 | 786-7001 |
CARBON FIBER REINF POLYMER PROTECTION | 120 | SF |
$135.00 |
|
|
|
|
|
| 1 | 104-7006 |
REMOV CONC (RIPRAP) | 5 | SY |
$80.00 |
|
|
|
|
|
| 5 | 164-7010 |
DRILL SEED (PERM_RURAL_CLAY) | 1,415 | SY |
$0.6000 |
|
|
|
|
|
| 6 | 354-7033 |
PLANE ASPH CONC PAV(0" TO 3") | 2,696 | SY |
$10.00 |
|
|
|
|
|
| 10 | 401-7001 |
FLOWABLE BACKFILL | 1 | CY |
$650.00 |
|
|
|
|
|
| 14 | 427-7005 |
EPOXY WATERPROOF FINISH (TY X) | 7,299 | SF |
$13.50 |
|
|
|
|
|
| 15 | 429-7003 |
CONC STR REPAIR(DECK REP(PART DEPTH)) | 728 | SF |
$100.00 |
|
|
|
|
|
| 16 | 429-7005 |
CONC STR REPAIR(DECK REP (FULL DEPTH)) | 243 | SF |
$180.00 |
|
|
|
|
|
| 17 | 429-7007 |
CONC STR REPAIR (VERTICAL & OVERHEAD) | 226 | SF |
$195.00 |
|
|
|
|
|
| 19 | 432-7002 |
RIPRAP (CONC)(5 IN) | 1 | CY |
$700.00 |
|
|
|
|
|
| 20 | 432-7013 |
RIPRAP (MOW STRIP)(4 IN) | 40 | CY |
$725.00 |
|
|
|
|
|
| 22 | 438-7010 |
CLEANING AND SEALING JOINTS (FOAM) | 251 | LF |
$80.00 |
|
|
|
|
|
| 23 | 439-7003 |
CONCRETE OVERLAY (2.5 IN) | 2,696 | SY |
$128.00 |
|
|
|
|
|
| 24 | 451-7024 |
RETROFIT RAIL (TY SSTR) | 896 | LF |
$235.00 |
|
|
|
|
|
| 26 | 483-7008 |
HYDRO-DEMOLITION (1 IN) | 2,696 | SY |
$77.00 |
|
|
|
|
|
| 28 | 500-7001 |
MOBILIZATION | 0.2 | LS |
$350,000.00 |
|
|
|
|
|
| 29 | 502-7001 |
BARRICADES, SIGNS AND TRAFFIC HANDLING | 4 | MO |
$20,000.00 |
|
|
|
|
|
| 30 | 503-7002 |
PORTABLE CHANGEABLE MESSAGE SIGN | 2 | EA |
$12,750.00 |
|
|
|
|
|
| 31 | 505-7001 |
TMA (STATIONARY) | 20 | DAY |
$345.00 |
|
|
|
|
|
| 32 | 505-7002 |
TMA (MOBILE OPERATION) | 24 | HR |
$100.00 |
|
|
|
|
|
| 33 | 506-7043 |
BIODEG EROSN CONT LOGS (INSTL) (8") | 920 | LF |
$7.00 |
|
|
|
|
|
| 34 | 506-7046 |
BIODEG EROSN CONT LOGS (REMOVE) | 920 | LF |
$2.75 |
|
|
|
|
|
| 35 | 510-7003 |
ONE-WAY TRAF CONT (PORT TRAF SIG) | 4 | MO |
$9,000.00 |
|
|
|
|
|
| 36 | 512-7017 |
PORT CTB (DES SOURCE)(F-SHAPE)(TY 1) | 600 | LF |
$28.00 |
|
|
|
|
|
| 37 | 512-7029 |
PORT CTB (MOVE)(F-SHAPE)(TY 1) | 600 | LF |
$14.00 |
|
|
|
|
|
| 39 | 512-7070 |
PORT CTB (CONNECTION HARDWARE) | 30 | EA |
$55.00 |
|
|
|
|
|
| 41 | 540-7002 |
MTL W-BEAM GD FEN (STEEL POST) | 400 | LF |
$40.00 |
|
|
|
|
|
| 42 | 540-7005 |
MTL BEAM GD FEN TRANS (THRIE-BEAM) | 4 | EA |
$3,000.00 |
|
|
|
|
|
| 43 | 542-7001 |
REMOVE METAL BEAM GUARD FENCE | 450 | LF |
$8.00 |
|
|
|
|
|
| 44 | 542-7002 |
REMOVE TERMINAL ANCHOR SECTION | 2 | EA |
$500.00 |
|
|
|
|
|
| 46 | 544-7001 |
GUARDRAIL END TREATMENT (INSTALL) | 4 | EA |
$5,000.00 |
|
|
|
|
|
| 47 | 544-7003 |
GUARDRAIL END TREATMENT (REMOVE) | 2 | EA |
$750.00 |
|
|
|
|
|
| 48 | 545-7002 |
CRASH CUSH ATTEN (MOVE & RESET) | 2 | EA |
$3,000.00 |
|
|
|
|
|
| 49 | 545-7004 |
CRASH CUSH ATTEN (REMOVE) | 2 | EA |
$2,090.00 |
|
|
|
|
|
| 51 | 545-7014 |
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3) | 2 | EA |
$10,000.00 |
|
|
|
|
|
| 52 | 658-7013 |
INSTL DEL ASSM (D-SW)SZ 1(BRF)CTB (BI) | 10 | EA |
$60.00 |
|
|
|
|
|
| 53 | 658-7019 |
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI) | 8 | EA |
$50.00 |
|
|
|
|
|
| 54 | 662-7008 |
WK ZN PAV MRK NON-REMOV (W)6"(SLD) | 485 | LF |
$2.00 |
|
|
|
|
|
| 55 | 662-7068 |
WK ZN PAV MRK REMOV (W)6"(SLD) | 3,140 | LF |
$2.00 |
|
|
|
|
|
| 56 | 662-7077 |
WK ZN PAV MRK REMOV (W)24"(SLD) | 24 | LF |
$6.00 |
|
|
|
|
|
| 57 | 662-7100 |
WK ZN PAV MRK REMOV (Y)6"(SLD) | 6,400 | LF |
$2.00 |
|
|
|
|
|
| 59 | 666-7292 |
TY I HIGH PERF PM (W)6"(SLD)(090MIL) | 4,410 | LF |
$0.8000 |
|
|
|
|
|
| 60 | 666-7301 |
TY I HIGH PERF PM (Y)6"(BRK)(090MIL) | 170 | LF |
$1.00 |
|
|
|
|
|
| 61 | 666-7304 |
TY I HIGH PERF PM (Y)6"(SLD)(090MIL) | 4,680 | LF |
$0.8000 |
|
|
|
|
|
| 62 | 666-7347 |
PAVEMENT SLER 6" | 9,260 | LF |
$0.2500 |
|
|
|
|
|
| 63 | 672-7004 |
REFL PAV MRKR TY II-A-A | 68 | EA |
$7.50 |
|
|
|
|
|
| 65 | 677-7001 |
ELIM EXT PM & MRKS (4") | 2,140 | LF |
$0.9000 |
|
|
|
|
|
| 66 | 678-7002 |
PAV SURF PREP FOR MRK (6") | 9,260 | LF |
$0.2000 |
|
|
|
|
|
| 67 | 713-7004 |
CRACK CLEANING AND SEALING (JCP) | 120 | LF |
$20.00 |
|
|
|
|
|
| 69 | 785-7011 |
BRIDGE JOINT REPLACEMENT (SEJ) | 106 | LF |
$900.00 |
|
|
|
|
|