FY26 - District Thermo - 11
6491-72-001 · let Nov 6, 2025 · Brazos, Bryan · Routine Maintenance Project
$2,845,805Low bid: STRIPE LINES, INC.-39.7% vs estimate $4,719,225
$111,520Left on the table3.9% gap to the second bid
7BiddersSpread 75% low to high
34Items comparedAgainst statewide low-bid averages
The bids
| # | Bidder | Total | vs low | vs estimate | Gap to next | Loaded items | Cut items |
|---|---|---|---|---|---|---|---|
| 1 | STRIPE LINES, INC. | $2,845,805 | -39.7% | $111,520 | 0 | 2-$69,801 | |
| 2 | STRIPING TECHNOLOGY, L.P. | $2,957,325 | +3.9% | -37.3% | $40,953 | 1+$22,000 | 1-$32,399 |
| 3 | STRIPE-A-ZONE, LLC | $2,998,278 | +5.4% | -36.5% | $196,498 | 0 | 2-$73,199 |
| 4 | D. I. J. CONSTRUCTION, INC. | $3,194,775 | +12.3% | -32.3% | $699,375 | 1+$43,992 | 1-$32,399 |
| 5 | TRP INFRASTRUCTURE SERVICES, LLC | $3,894,150 | +36.8% | -17.5% | $373,980 | 0 | 0 |
| 6 | PAVEMENT MARKINGS INC. | $4,268,130 | +50.0% | -9.6% | $705,975 | ||
| 7 | INTERSTATE BARRICADES & MARKINGS, INC. | $4,974,105 | +74.8% | 5.4% |
Loaded: priced 1.75x or more over the statewide average low bid. Cut: half of it or less. Only items worth at least $2,500 or 0.5% of the bid count. Checked for the top 5 bidders.
Where the job was won
STRIPE LINES, INC. vs STRIPING TECHNOLOGY, L.P., biggest item swings| Item | Qty | Low | 2nd | Market | 2nd minus low |
|---|---|---|---|---|---|
| 666-7409 REFL PAV MRK TY I (W)6"(SLD)(060MIL) | 3,500,000 LF | $0.2900 | $0.2800 | $0.3171 | -$35,000 |
| 666-7421 REFL PAV MRK TY I (Y)6"(SLD)(060MIL) | 3,000,000 LF | $0.2900 | $0.2800 | $0.3278 | -$30,000 |
| 505-7003 TMA (MOBILE OPERATION) | 250 DAY | $10.00 | $100.00 | $229.60 | $22,500 |
| 666-7436 REFL PAV MRK TY I (W)12"(DOT)(060MIL) | 10,000 LF | $0.8000 | $3.00 | $0.8000 | $22,000 |
| 533-7001 MILL RUMBLE STRIPS (ASPHALT) (SHLDR) | 200,000 LF | $0.1500 | $0.2500 | $0.2040 | $20,000 |
| 533-7002 MILL RUMBLE STRIPS (ASPH) (CENTERLINE) | 100,000 LF | $0.1500 | $0.3500 | $0.2394 | $20,000 |
| 666-7028 REFL PAV MRK TY I (W)12"(SLD)(060MIL) | 10,000 LF | $1.09 | $3.00 | $2.58 | $19,100 |
| 666-7138 RE PV MRK TY I(BLACK)6"(SHADOW)(100MIL) | 100,000 LF | $0.4700 | $0.6200 | $0.6844 | $15,000 |
| 666-7418 REFL PAV MRK TY I (Y)6"(BRK)(060MIL) | 400,000 LF | $0.2900 | $0.3200 | $0.3503 | $12,000 |
| 666-7411 REFL PAV MRK TY I (W)6"(SLD)(100MIL) | 300,000 LF | $0.4400 | $0.4000 | $0.4757 | -$12,000 |
| 500-7002 MOBILIZATION (CALLOUT) | 10 EA | $500.00 | $1,500.00 | $600.85 | $10,000 |
| 666-7347 PAVEMENT SLER 6" | 200,000 LF | $0.2000 | $0.2500 | $0.1841 | $10,000 |
| 666-7022 REFL PAV MRK TY I (W)8"(SLD)(060MIL) | 80,000 LF | $0.5000 | $0.6200 | $0.6127 | $9,600 |
| 666-7273 RE PROFILE PM TY I(Y)6"(BRK)(090MIL) | 40,000 LF | $0.5000 | $0.6200 | $0.5289 | $4,800 |
| 666-7406 REFL PAV MRK TY I (W)6"(BRK)(060MIL) | 150,000 LF | $0.2900 | $0.3200 | $0.3582 | $4,500 |
| 666-7265 RE PROFILE PM TY I(W)6"(SLD)(090MIL) | 400,000 LF | $0.4900 | $0.5000 | $0.5887 | $4,000 |
| 668-7137 PRFB RUMBLE STRIP (BLK)(1')(EDGELINE) | 4,000 LF | $3.00 | $4.00 | $2.68 | $4,000 |
| 666-7350 PAVEMENT SLER 12" | 1,500 LF | $0.3000 | $2.00 | $0.6885 | $2,550 |
| 677-7001 ELIM EXT PM & MRKS (4") | 50,000 LF | $0.3000 | $0.2500 | $0.2643 | -$2,500 |
| 677-7002 ELIM EXT PM & MRKS (6") | 50,000 LF | $0.3000 | $0.3500 | $0.2755 | $2,500 |
Positive: the low bidder was cheaper on that item. These 20 items account for $103,050 of the $111,520 gap.