Bid Tab X-ray: 6485-15-001

Nov 12, 2025 · Montgomery Sign up free
Set your company to personalize scores

Asphalt Repair RMC 6485-15-001

6485-15-001 · let Nov 12, 2025 · Montgomery, Houston · Routine Maintenance Project - Sealed

$293,700Low bid: FORDE CONSTRUCTION COMPANY, INC.-1.9% vs estimate $299,450
$144,900Left on the table49.3% gap to the second bid
2BiddersSpread 49% low to high
6Items comparedAgainst statewide low-bid averages

The bids

#BidderTotalvs lowvs estimateGap to nextLoaded itemsCut items
1FORDE CONSTRUCTION COMPANY, INC. $293,700-1.9% $144,900 1+$10,083 1-$3,005
2MC2 CIVIL, LLC $438,600+49.3%46.5% 3+$58,238 1-$3,005

Loaded: priced 1.75x or more over the statewide average low bid. Cut: half of it or less. Only items worth at least $2,500 or 0.5% of the bid count. Checked for the top 2 bidders.

Where the job was won

FORDE CONSTRUCTION COMPANY, INC. vs MC2 CIVIL, LLC, biggest item swings
ItemQtyLow2ndMarket2nd minus low
700-7007 POTHOLE REPAIR(SAW-CUT)(0"-5" DEEP)3,500 SY $71.00$98.00$71.00 $94,500
700-7008 POTHOLE REPAIR(SAW-CUT)(5"-10" DEEP)200 SY $80.00$225.00$80.00 $29,000
351-7008 FLEXIBLE PAVEMENT STRUCTURE REPAIR(9")150 SY $150.00$250.00$82.78 $15,000
500-7033 MOBILIZATION (EMERGENCY)1 EA $1,000.00$5,000.00$844.81 $4,000
505-7001 TMA (STATIONARY)30 DAY $170.00$250.00$217.57 $2,400
500-7002 MOBILIZATION (CALLOUT)6 EA $100.00$100.00$600.85 $0

Positive: the low bidder was cheaper on that item. These 6 items account for $144,900 of the $144,900 gap.

FORDE CONSTRUCTION COMPANY, INC.: unbalanced items

Placed 1
ItemQtyTheir priceMarketx market$ vs market
351-7008 FLEXIBLE PAVEMENT STRUCTURE REPAIR(9")150 SY $150.00$82.781.81x$10,083
500-7002 MOBILIZATION (CALLOUT)6 EA $100.00$600.850.17x-$3,005

MC2 CIVIL, LLC: unbalanced items

Placed 2
ItemQtyTheir priceMarketx market$ vs market
700-7008 POTHOLE REPAIR(SAW-CUT)(5"-10" DEEP)200 SY $225.00$80.002.81x$29,000
351-7008 FLEXIBLE PAVEMENT STRUCTURE REPAIR(9")150 SY $250.00$82.783.02x$25,083
500-7033 MOBILIZATION (EMERGENCY)1 EA $5,000.00$844.815.92x$4,155
500-7002 MOBILIZATION (CALLOUT)6 EA $100.00$600.850.17x-$3,005