WAO Miscellaneous Concrete
6489-59-001 · let Dec 11, 2025 · El Paso, El Paso · Routine Maintenance Project
$870,050Low bid: INTERNATIONAL EAGLE ENTERPRISES, INC.-5.3% vs estimate $918,714
$2,826Left on the table0.3% gap to the second bid
3BiddersSpread 1% low to high
23Items comparedAgainst statewide low-bid averages
The bids
| # | Bidder | Total | vs low | vs estimate | Gap to next | Loaded items | Cut items |
|---|---|---|---|---|---|---|---|
| 1 | INTERNATIONAL EAGLE ENTERPRISES, INC. | $870,050 | -5.3% | $2,826 | 13+$276,945 | 1-$438,850 | |
| 2 | SYNERGY PROJECT CONTRACTORS, INC. | $872,876 | +0.3% | -5.0% | $6,995 | 8+$387,961 | 1-$447,150 |
| 3 | HAWK CONSTRUCTION | $879,870 | +1.1% | -4.2% | 10+$348,943 | 1-$521,750 |
Loaded: priced 1.75x or more over the statewide average low bid. Cut: half of it or less. Only items worth at least $2,500 or 0.5% of the bid count. Checked for the top 3 bidders.
Where the job was won
INTERNATIONAL EAGLE ENTERPRISES, INC. vs SYNERGY PROJECT CONTRACTORS, INC., biggest item swings| Item | Qty | Low | 2nd | Market | 2nd minus low |
|---|---|---|---|---|---|
| 429-7009 CONC STR REPAIR (STANDARD) | 500 SF | $250.00 | $413.00 | $146.35 | $81,500 |
| 505-7001 TMA (STATIONARY) | 130 DAY | $1,000.00 | $418.90 | $217.57 | -$75,543 |
| 450-7012 RAIL (TY T402) | 200 LF | $320.00 | $118.00 | $153.00 | -$40,400 |
| 429-7006 CONC STR REPR(RAPID DECK REP(FULL DPT)) | 200 SF | $325.00 | $525.10 | $153.06 | $40,020 |
| 429-7004 CONC STR REPAIR(RAPID DECK REP(PRT DPT) | 200 SF | $260.00 | $389.40 | $85.28 | $25,880 |
| 429-7008 CONC STR REPR(RAPID VERT AND OVERHEAD) | 150 SF | $300.00 | $436.60 | $198.67 | $20,490 |
| 420-7002 CL A CONC (MISC) | 111 CY | $550.00 | $413.00 | $560.77 | -$15,207 |
| 420-7157 CL C CONC (HEADWALL) | 5 CY | $4,000.00 | $1,062.00 | $1,847.50 | -$14,690 |
| 427-7002 CONCRETE PAINT FINISH | 700 SF | $15.00 | $35.40 | $0.9252 | $14,280 |
| 420-7146 CL C CONC (WINGWALLS) | 5 CY | $4,000.00 | $1,298.00 | $2,100.77 | -$13,510 |
| 529-7007 CONC CURB (MONO) (TY II) | 1,000 LF | $20.00 | $30.68 | $6.85 | $10,680 |
| 500-7001 MOBILIZATION | 1 LS | $85,000.00 | $76,700.00 | $523,850.32 | -$8,300 |
| 401-7001 FLOWABLE BACKFILL | 20 CY | $550.00 | $236.00 | $298.77 | -$6,280 |
| 104-7036 REMOV CONC (RAIL) | 100 LF | $80.00 | $17.70 | $15.78 | -$6,230 |
| 503-7001 PORTABLE CHANGEABLE MESSAGE SIGN | 20 DAY | $300.00 | $47.20 | $87.82 | -$5,056 |
| 432-7005 RIPRAP (CONC)(CL B) | 150 CY | $550.00 | $531.00 | $556.52 | -$2,850 |
| 429-7007 CONC STR REPAIR (VERTICAL & OVERHEAD) | 50 SF | $300.00 | $342.20 | $150.68 | $2,110 |
| 104-7006 REMOV CONC (RIPRAP) | 200 SY | $40.00 | $29.50 | $14.32 | -$2,100 |
| 104-7028 REMOV CONC (WINGWALL) | 5 CY | $500.00 | $135.70 | $380.16 | -$1,822 |
| 104-7029 REMOV CONC (HEADWALL) | 5 CY | $500.00 | $153.40 | $433.45 | -$1,733 |
Positive: the low bidder was cheaper on that item. These 20 items account for $1,240 of the $2,826 gap.
INTERNATIONAL EAGLE ENTERPRISES, INC.: unbalanced items
Placed 1| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 505-7001 TMA (STATIONARY) | 130 DAY | $1,000.00 | $217.57 | 4.60x | $101,716 |
| 429-7004 CONC STR REPAIR(RAPID DECK REP(PRT DPT) | 200 SF | $260.00 | $85.28 | 3.05x | $34,943 |
| 429-7006 CONC STR REPR(RAPID DECK REP(FULL DPT)) | 200 SF | $325.00 | $153.06 | 2.12x | $34,388 |
| 450-7012 RAIL (TY T402) | 200 LF | $320.00 | $153.00 | 2.09x | $33,400 |
| 529-7007 CONC CURB (MONO) (TY II) | 1,000 LF | $20.00 | $6.85 | 2.92x | $13,153 |
| 420-7157 CL C CONC (HEADWALL) | 5 CY | $4,000.00 | $1,847.50 | 2.17x | $10,763 |
| 427-7002 CONCRETE PAINT FINISH | 700 SF | $15.00 | $0.9252 | 16.21x | $9,852 |
| 420-7146 CL C CONC (WINGWALLS) | 5 CY | $4,000.00 | $2,100.77 | 1.90x | $9,496 |
| 429-7007 CONC STR REPAIR (VERTICAL & OVERHEAD) | 50 SF | $300.00 | $150.68 | 1.99x | $7,466 |
| 104-7036 REMOV CONC (RAIL) | 100 LF | $80.00 | $15.78 | 5.07x | $6,422 |
| 500-7001 MOBILIZATION | 1 LS | $85,000.00 | $523,850.32 | 0.16x | -$438,850 |
SYNERGY PROJECT CONTRACTORS, INC.: unbalanced items
Placed 2| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 429-7009 CONC STR REPAIR (STANDARD) | 500 SF | $413.00 | $146.35 | 2.82x | $133,326 |
| 429-7006 CONC STR REPR(RAPID DECK REP(FULL DPT)) | 200 SF | $525.10 | $153.06 | 3.43x | $74,408 |
| 429-7004 CONC STR REPAIR(RAPID DECK REP(PRT DPT) | 200 SF | $389.40 | $85.28 | 4.57x | $60,823 |
| 429-7008 CONC STR REPR(RAPID VERT AND OVERHEAD) | 150 SF | $436.60 | $198.67 | 2.20x | $35,689 |
| 505-7001 TMA (STATIONARY) | 130 DAY | $418.90 | $217.57 | 1.93x | $26,173 |
| 427-7002 CONCRETE PAINT FINISH | 700 SF | $35.40 | $0.9252 | 38.26x | $24,132 |
| 529-7007 CONC CURB (MONO) (TY II) | 1,000 LF | $30.68 | $6.85 | 4.48x | $23,833 |
| 429-7007 CONC STR REPAIR (VERTICAL & OVERHEAD) | 50 SF | $342.20 | $150.68 | 2.27x | $9,576 |
| 500-7001 MOBILIZATION | 1 LS | $76,700.00 | $523,850.32 | 0.15x | -$447,150 |
HAWK CONSTRUCTION: unbalanced items
Placed 3| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 429-7009 CONC STR REPAIR (STANDARD) | 500 SF | $325.00 | $146.35 | 2.22x | $89,326 |
| 505-7001 TMA (STATIONARY) | 130 DAY | $858.00 | $217.57 | 3.94x | $83,256 |
| 429-7006 CONC STR REPR(RAPID DECK REP(FULL DPT)) | 200 SF | $405.00 | $153.06 | 2.65x | $50,388 |
| 429-7004 CONC STR REPAIR(RAPID DECK REP(PRT DPT) | 200 SF | $315.00 | $85.28 | 3.69x | $45,943 |
| 429-7008 CONC STR REPR(RAPID VERT AND OVERHEAD) | 150 SF | $366.00 | $198.67 | 1.84x | $25,099 |
| 529-7007 CONC CURB (MONO) (TY II) | 1,000 LF | $24.00 | $6.85 | 3.51x | $17,153 |
| 104-7006 REMOV CONC (RIPRAP) | 200 SY | $75.00 | $14.32 | 5.24x | $12,136 |
| 429-7007 CONC STR REPAIR (VERTICAL & OVERHEAD) | 50 SF | $385.00 | $150.68 | 2.56x | $11,716 |
| 104-7036 REMOV CONC (RAIL) | 100 LF | $95.00 | $15.78 | 6.02x | $7,922 |
| 427-7002 CONCRETE PAINT FINISH | 700 SF | $9.50 | $0.9252 | 10.27x | $6,002 |
| 500-7001 MOBILIZATION | 1 LS | $2,100.00 | $523,850.32 | 0.00x | -$521,750 |