086301075 FM 493 HIDALGO (OVERLAY)
0863-01-075 · let Dec 2, 2025 · Hidalgo, Pharr · Overlay
$11,224,907Low bid: IOC COMPANY LLC-20.3% vs estimate $14,084,469
$1,070,122Left on the table9.5% gap to the second bid
5BiddersSpread 48% low to high
140Items comparedAgainst statewide low-bid averages
The bids
| # | Bidder | Total | vs low | vs estimate | Gap to next | Loaded items | Cut items |
|---|---|---|---|---|---|---|---|
| 1 | IOC COMPANY LLC | $11,224,907 | -20.3% | $1,070,122 | 0 | 2-$479,201 | |
| 2 | FOREMOST PAVING, INC. | $12,295,029 | +9.5% | -12.7% | $2,927,116 | 0 | 0 |
| 3 | TEXAS CORDIA CONSTRUCTION, LLC | $15,222,146 | +35.6% | 8.1% | $149,161 | 1+$126,217 | 0 |
| 4 | POSILLICO CIVIL, INC. | $15,371,307 | +36.9% | 9.1% | $1,263,219 | 4+$715,933 | 0 |
| 5 | CK NEWBERRY, LLC | $16,634,527 | +48.2% | 18.1% | 2+$1,460,299 | 0 |
Loaded: priced 1.75x or more over the statewide average low bid. Cut: half of it or less. Only items worth at least $2,500 or 0.5% of the bid count. Checked for the top 5 bidders.
Where the job was won
IOC COMPANY LLC vs FOREMOST PAVING, INC., biggest item swings| Item | Qty | Low | 2nd | Market | 2nd minus low |
|---|---|---|---|---|---|
| 500-7001 MOBILIZATION | 1 LS | $125,500.00 | $500,000.00 | $523,850.32 | $374,500 |
| 354-7051 PLANE ASPH CONC PAV(2") | 404,391 SY | $1.00 | $1.75 | $1.86 | $303,293 |
| 351-7007 FLEXIBLE PAVEMENT STRUCTURE REPAIR(8") | 14,764 SY | $48.20 | $60.50 | $60.19 | $181,597 |
| 344-7064 SP MIXES SP-D SAC-A PG76-22 | 29,955 TON | $106.50 | $109.00 | $129.17 | $74,888 |
| 354-7032 PLANE ASPH CONC PAV(0" TO 2") | 17,029 SY | $1.00 | $4.10 | $2.13 | $52,790 |
| 346-7009 STONE-MTRX-ASPH SMA-D SAC-A PG76-22 | 46,726 TON | $120.00 | $119.00 | $152.44 | -$46,726 |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 10 MO | $3,500.00 | $7,525.00 | $11,585.04 | $40,250 |
| 533-7001 MILL RUMBLE STRIPS (ASPHALT) (SHLDR) | 115,568 LF | $0.1200 | $0.4500 | $0.2040 | $38,137 |
| 134-7001 BACKFILL (TY A) | 509 STA | $346.00 | $277.00 | $224.26 | -$35,121 |
| 540-7001 MTL W-BEAM GD FEN (TIM POST) | 1,675 LF | $24.51 | $45.00 | $25.60 | $34,321 |
| 3007-7001 BONDING COURSE | 47,117 GAL | $3.50 | $2.80 | $3.32 | -$32,982 |
| 688-7004 VEH LP DETECT (SAWCUT) | 5,566 LF | $16.90 | $12.50 | $13.72 | -$24,490 |
| 432-7013 RIPRAP (MOW STRIP)(4 IN) | 135 CY | $600.00 | $420.00 | $616.83 | -$24,300 |
| 544-7001 GUARDRAIL END TREATMENT (INSTALL) | 19 EA | $3,365.00 | $4,600.00 | $3,190.07 | $23,465 |
| 666-7030 REFL PAV MRK TY I (W)12"(SLD)(100MIL) | 7,367 LF | $1.10 | $3.80 | $2.94 | $19,891 |
| 666-7036 REFL PAV MRK TY I (W)24"(SLD)(100MIL) | 2,799 LF | $6.00 | $10.80 | $7.19 | $13,435 |
| 658-7032 INSTL DEL ASSM (D-SY)SZ 1(BRF)CTB (BI) | 290 EA | $15.00 | $50.00 | $9.51 | $10,150 |
| 666-7027 REFL PAV MRK TY I (W)12"(LNDP)(100MIL) | 3,682 LF | $1.10 | $3.40 | $1.59 | $8,469 |
| 542-7001 REMOVE METAL BEAM GUARD FENCE | 1,401 LF | $4.00 | $10.00 | $2.84 | $8,406 |
| 666-7244 RE PM TY III (W)(24")(SLD) | 807 LF | $6.50 | $16.80 | $7.96 | $8,312 |
Positive: the low bidder was cheaper on that item. These 20 items account for $1,028,285 of the $1,070,122 gap.
IOC COMPANY LLC: unbalanced items
Placed 1TEXAS CORDIA CONSTRUCTION, LLC: unbalanced items
Placed 3| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 3007-7001 BONDING COURSE | 47,117 GAL | $6.00 | $3.32 | 1.81x | $126,217 |
POSILLICO CIVIL, INC.: unbalanced items
Placed 4| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 10 MO | $52,000.00 | $11,585.04 | 4.49x | $404,150 |
| 3007-7001 BONDING COURSE | 47,117 GAL | $6.00 | $3.32 | 1.81x | $126,217 |
| 505-7003 TMA (MOBILE OPERATION) | 200 DAY | $700.00 | $229.60 | 3.05x | $94,081 |
| 505-7001 TMA (STATIONARY) | 200 DAY | $675.00 | $217.57 | 3.10x | $91,486 |