FY 26 CRCP on IH 27 Hale Co
0905-12-046 · let Dec 3, 2025 · Hale, Lubbock · Rehabilitation of Existing Road
$2,229,251Low bid: WINDING ROAD CONSTRUCTION, INC.-13.6% vs estimate $2,581,176
$331,615Left on the table14.9% gap to the second bid
3BiddersSpread 21% low to high
12Items comparedAgainst statewide low-bid averages
The bids
| # | Bidder | Total | vs low | vs estimate | Gap to next | Loaded items | Cut items |
|---|---|---|---|---|---|---|---|
| 1 | WINDING ROAD CONSTRUCTION, INC. | $2,229,251 | -13.6% | $331,615 | 0 | 4-$562,725 | |
| 2 | O. TREVINO CONSTRUCTION, LLC | $2,560,865 | +14.9% | -0.8% | $128,493 | 2+$54,071 | 2-$368,726 |
| 3 | SILVER CREEK CONSTRUCTION, INC. | $2,689,358 | +20.6% | 4.2% | 0 | 2-$123,783 |
Loaded: priced 1.75x or more over the statewide average low bid. Cut: half of it or less. Only items worth at least $2,500 or 0.5% of the bid count. Checked for the top 3 bidders.
Where the job was won
WINDING ROAD CONSTRUCTION, INC. vs O. TREVINO CONSTRUCTION, LLC, biggest item swings| Item | Qty | Low | 2nd | Market | 2nd minus low |
|---|---|---|---|---|---|
| 361-7057 FULL - DEPTH REPAIR CRCP (10") | 8,267 SY | $239.00 | $253.00 | $239.80 | $115,738 |
| 500-7001 MOBILIZATION | 1 LS | $150,000.00 | $250,000.00 | $523,850.32 | $100,000 |
| 503-7001 PORTABLE CHANGEABLE MESSAGE SIGN | 408 DAY | $10.00 | $157.00 | $87.82 | $59,976 |
| 505-7001 TMA (STATIONARY) | 408 DAY | $10.00 | $157.00 | $217.57 | $59,976 |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 11 MO | $5,000.00 | $2,960.00 | $11,585.04 | -$22,440 |
| 721-7001 FIBER REINFORCED POLYMER PATCHING MATLS | 3,920 LB | $7.50 | $11.00 | $4.41 | $13,720 |
| 713-7005 LONGT CRACK CLEANING AND SEALING (CRCP) | 290 LF | $2.75 | $15.00 | $14.53 | $3,553 |
| 400-7010 CEM STABIL BKFL | 30 CY | $280.00 | $350.00 | $138.14 | $2,100 |
| 721-7002 BULKING AGGREGATE | 1,680 LB | $1.00 | $0.4000 | $1.41 | -$1,008 |
Positive: the low bidder was cheaper on that item. These 9 items account for $331,615 of the $331,615 gap.
WINDING ROAD CONSTRUCTION, INC.: unbalanced items
Placed 1| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 500-7001 MOBILIZATION | 1 LS | $150,000.00 | $523,850.32 | 0.29x | -$373,850 |
| 505-7001 TMA (STATIONARY) | 408 DAY | $10.00 | $217.57 | 0.05x | -$84,689 |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 11 MO | $5,000.00 | $11,585.04 | 0.43x | -$72,435 |
| 503-7001 PORTABLE CHANGEABLE MESSAGE SIGN | 408 DAY | $10.00 | $87.82 | 0.11x | -$31,750 |
O. TREVINO CONSTRUCTION, LLC: unbalanced items
Placed 2| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 503-7001 PORTABLE CHANGEABLE MESSAGE SIGN | 408 DAY | $157.00 | $87.82 | 1.79x | $28,226 |
| 721-7001 FIBER REINFORCED POLYMER PATCHING MATLS | 3,920 LB | $11.00 | $4.41 | 2.50x | $25,845 |
| 500-7001 MOBILIZATION | 1 LS | $250,000.00 | $523,850.32 | 0.48x | -$273,850 |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 11 MO | $2,960.00 | $11,585.04 | 0.26x | -$94,875 |