FY26 Littlefield Call Out MBGF Repair
6491-51-001 · let Dec 4, 2025 · Lamb, Lubbock · Routine Maintenance Project - Sealed
$291,801Low bid: BK FIELD OPERATIONS LLC-38.8% vs estimate $476,500
$71,957Left on the table24.7% gap to the second bid
5BiddersSpread 69% low to high
40Items comparedAgainst statewide low-bid averages
The bids
| # | Bidder | Total | vs low | vs estimate | Gap to next | Loaded items | Cut items |
|---|---|---|---|---|---|---|---|
| 1 | BK FIELD OPERATIONS LLC | $291,801 | -38.8% | $71,957 | 3+$65,023 | 19-$174,064 | |
| 2 | E.V.G. ENTERPRISE | $363,758 | +24.7% | -23.7% | $7,128 | 6+$99,009 | 16-$108,069 |
| 3 | AUSTIN BARRICADE COMPANY, L.L.C. | $370,886 | +27.1% | -22.2% | $102,065 | 1+$229,121 | 20-$208,061 |
| 4 | BARRICADES UNLIMITED | $472,951 | +62.1% | -0.7% | $20,333 | 8+$156,289 | 9-$68,597 |
| 5 | TI-ZACK CONCRETE, LLC | $493,284 | +69.0% | 3.5% | 10+$193,913 | 8-$69,202 |
Loaded: priced 1.75x or more over the statewide average low bid. Cut: half of it or less. Only items worth at least $2,500 or 0.5% of the bid count. Checked for the top 5 bidders.
Where the job was won
BK FIELD OPERATIONS LLC vs E.V.G. ENTERPRISE, biggest item swings| Item | Qty | Low | 2nd | Market | 2nd minus low |
|---|---|---|---|---|---|
| 770-7001 REPLACE RAIL ELEMENT (W-BEAM) | 2,500 LF | $35.00 | $17.00 | $22.03 | -$45,000 |
| 770-7007 REPLACE STEEL POST W/O CONC FND | 250 EA | $80.00 | $200.00 | $46.70 | $30,000 |
| 771-7005 REPLACE POSTS (TL-4)(GIBRALTAR) | 150 EA | $400.00 | $200.00 | $159.54 | -$30,000 |
| 540-7038 MTL W-BEAM GD FEN (NESTED)(STEEL POST) | 150 LF | $30.00 | $200.00 | $25.83 | $25,500 |
| 770-7018 REPLACE BLOCKOUT | 250 EA | $1.00 | $100.00 | $44.95 | $24,750 |
| 544-7001 GUARDRAIL END TREATMENT (INSTALL) | 5 EA | $8,000.00 | $3,500.00 | $3,190.07 | -$22,500 |
| 770-7006 REPLACE TIMBER POST W/O CONC FND | 250 EA | $1.00 | $80.00 | $89.82 | $19,750 |
| 770-7008 REPLACE TIMBER POST W/ CONC FND | 250 EA | $1.00 | $80.00 | $94.21 | $19,750 |
| 540-7002 MTL W-BEAM GD FEN (STEEL POST) | 1,500 LF | $25.00 | $35.00 | $30.74 | $15,000 |
| 771-7020 REPLACE POST HARDWARE (TL-4) | 150 EA | $1.00 | $100.00 | $11.22 | $14,850 |
| 770-7009 REPLACE STEEL POST W/ CONC FND | 250 EA | $1.00 | $60.00 | $41.43 | $14,750 |
| 544-7002 GUARDRAIL END TREATMENT (MOVE & RESET) | 5 EA | $1.00 | $1,000.00 | $669.70 | $4,995 |
| 544-7003 GUARDRAIL END TREATMENT (REMOVE) | 5 EA | $1.00 | $1,000.00 | $284.94 | $4,995 |
| 505-7001 TMA (STATIONARY) | 50 DAY | $1.00 | $100.00 | $217.57 | $4,950 |
| 540-7005 MTL BEAM GD FEN TRANS (THRIE-BEAM) | 2 EA | $2,000.00 | $20.00 | $2,218.70 | -$3,960 |
| 540-7018 MTL W - BEAM GD FEN (LOW FILL CULVERT) | 250 LF | $40.00 | $30.00 | $90.29 | -$2,500 |
| 770-7010 REALIGN POSTS | 250 EA | $1.00 | $10.00 | $24.32 | $2,250 |
| 540-7040 MBGF (W-BEAM) (MED BAR) | 250 LF | $20.00 | $25.00 | $26.29 | $1,250 |
| 540-7006 MTL BEAM GD FEN TRANS (TL2) | 2 EA | $600.00 | $20.00 | $1,367.97 | -$1,160 |
| 658-7018 INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2 | 250 EA | $5.00 | $1.00 | $35.16 | -$1,000 |
Positive: the low bidder was cheaper on that item. These 20 items account for $76,670 of the $71,957 gap.
BK FIELD OPERATIONS LLC: unbalanced items
Placed 1| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 771-7005 REPLACE POSTS (TL-4)(GIBRALTAR) | 150 EA | $400.00 | $159.54 | 2.51x | $36,070 |
| 544-7001 GUARDRAIL END TREATMENT (INSTALL) | 5 EA | $8,000.00 | $3,190.07 | 2.51x | $24,050 |
| 771-7014 REPR OR REPLC CABLE BARR TERM SEC(TL-4) | 5 EA | $2,000.00 | $1,019.22 | 1.96x | $4,904 |
| 770-7008 REPLACE TIMBER POST W/ CONC FND | 250 EA | $1.00 | $94.21 | 0.01x | -$23,303 |
| 770-7006 REPLACE TIMBER POST W/O CONC FND | 250 EA | $1.00 | $89.82 | 0.01x | -$22,205 |
| 540-7018 MTL W - BEAM GD FEN (LOW FILL CULVERT) | 250 LF | $40.00 | $90.29 | 0.44x | -$12,572 |
| 540-7015 DOWNSTREAM ANCHOR TERMINAL SECTION | 10 EA | $100.00 | $1,297.32 | 0.08x | -$11,973 |
| 770-7018 REPLACE BLOCKOUT | 250 EA | $1.00 | $44.95 | 0.02x | -$10,989 |
| 505-7001 TMA (STATIONARY) | 50 DAY | $1.00 | $217.57 | 0.00x | -$10,829 |
| 500-7033 MOBILIZATION (EMERGENCY) | 12 EA | $1.00 | $844.81 | 0.00x | -$10,126 |
| 770-7009 REPLACE STEEL POST W/ CONC FND | 250 EA | $1.00 | $41.43 | 0.02x | -$10,108 |
| 658-7036 INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2 | 250 EA | $1.00 | $37.39 | 0.03x | -$9,098 |
| 540-7029 MTL BM GD FEN TRANS (ANCHOR PLATE) | 10 EA | $2.00 | $757.97 | 0.00x | -$7,560 |
E.V.G. ENTERPRISE: unbalanced items
Placed 2| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 770-7007 REPLACE STEEL POST W/O CONC FND | 250 EA | $200.00 | $46.70 | 4.28x | $38,326 |
| 540-7038 MTL W-BEAM GD FEN (NESTED)(STEEL POST) | 150 LF | $200.00 | $25.83 | 7.74x | $26,125 |
| 770-7018 REPLACE BLOCKOUT | 250 EA | $100.00 | $44.95 | 2.22x | $13,761 |
| 771-7020 REPLACE POST HARDWARE (TL-4) | 150 EA | $100.00 | $11.22 | 8.91x | $13,317 |
| 771-7014 REPR OR REPLC CABLE BARR TERM SEC(TL-4) | 5 EA | $1,800.00 | $1,019.22 | 1.77x | $3,904 |
| 544-7003 GUARDRAIL END TREATMENT (REMOVE) | 5 EA | $1,000.00 | $284.94 | 3.51x | $3,575 |
| 540-7018 MTL W - BEAM GD FEN (LOW FILL CULVERT) | 250 LF | $30.00 | $90.29 | 0.33x | -$15,072 |
| 540-7015 DOWNSTREAM ANCHOR TERMINAL SECTION | 10 EA | $1.00 | $1,297.32 | 0.00x | -$12,963 |
| 500-7033 MOBILIZATION (EMERGENCY) | 12 EA | $1.00 | $844.81 | 0.00x | -$10,126 |
| 658-7036 INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2 | 250 EA | $1.00 | $37.39 | 0.03x | -$9,098 |
| 658-7018 INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2 | 250 EA | $1.00 | $35.16 | 0.03x | -$8,539 |
| 500-7002 MOBILIZATION (CALLOUT) | 12 EA | $1.00 | $600.85 | 0.00x | -$7,198 |
| 540-7029 MTL BM GD FEN TRANS (ANCHOR PLATE) | 10 EA | $100.00 | $757.97 | 0.13x | -$6,580 |
| 770-7019 REPAIR STEEL POST WITH BASE PLATE | 50 EA | $10.00 | $137.68 | 0.07x | -$6,384 |
| 658-7019 INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI) | 250 EA | $1.00 | $26.51 | 0.04x | -$6,378 |
| 505-7001 TMA (STATIONARY) | 50 DAY | $100.00 | $217.57 | 0.46x | -$5,879 |
AUSTIN BARRICADE COMPANY, L.L.C.: unbalanced items
Placed 3| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 505-7001 TMA (STATIONARY) | 50 DAY | $4,800.00 | $217.57 | 22.06x | $229,121 |
| 770-7001 REPLACE RAIL ELEMENT (W-BEAM) | 2,500 LF | $10.00 | $22.03 | 0.45x | -$30,069 |
| 770-7008 REPLACE TIMBER POST W/ CONC FND | 250 EA | $1.00 | $94.21 | 0.01x | -$23,303 |
| 770-7006 REPLACE TIMBER POST W/O CONC FND | 250 EA | $1.00 | $89.82 | 0.01x | -$22,205 |
| 540-7018 MTL W - BEAM GD FEN (LOW FILL CULVERT) | 250 LF | $8.00 | $90.29 | 0.09x | -$20,572 |
| 540-7015 DOWNSTREAM ANCHOR TERMINAL SECTION | 10 EA | $1.00 | $1,297.32 | 0.00x | -$12,963 |
| 770-7007 REPLACE STEEL POST W/O CONC FND | 250 EA | $1.00 | $46.70 | 0.02x | -$11,424 |
| 500-7033 MOBILIZATION (EMERGENCY) | 12 EA | $1.00 | $844.81 | 0.00x | -$10,126 |
| 770-7009 REPLACE STEEL POST W/ CONC FND | 250 EA | $1.00 | $41.43 | 0.02x | -$10,108 |
| 658-7036 INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2 | 250 EA | $1.00 | $37.39 | 0.03x | -$9,098 |
| 658-7018 INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2 | 250 EA | $1.00 | $35.16 | 0.03x | -$8,539 |
BARRICADES UNLIMITED: unbalanced items
Placed 4| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 770-7010 REALIGN POSTS | 250 EA | $150.00 | $24.32 | 6.17x | $31,419 |
| 544-7001 GUARDRAIL END TREATMENT (INSTALL) | 5 EA | $8,000.00 | $3,190.07 | 2.51x | $24,050 |
| 500-7002 MOBILIZATION (CALLOUT) | 12 EA | $2,500.00 | $600.85 | 4.16x | $22,790 |
| 771-7014 REPR OR REPLC CABLE BARR TERM SEC(TL-4) | 5 EA | $5,000.00 | $1,019.22 | 4.91x | $19,904 |
| 500-7033 MOBILIZATION (EMERGENCY) | 12 EA | $2,500.00 | $844.81 | 2.96x | $19,862 |
| 770-7007 REPLACE STEEL POST W/O CONC FND | 250 EA | $120.00 | $46.70 | 2.57x | $18,326 |
| 505-7001 TMA (STATIONARY) | 50 DAY | $500.00 | $217.57 | 2.30x | $14,121 |
| 771-7020 REPLACE POST HARDWARE (TL-4) | 150 EA | $50.00 | $11.22 | 4.46x | $5,817 |
| 770-7008 REPLACE TIMBER POST W/ CONC FND | 250 EA | $10.00 | $94.21 | 0.11x | -$21,053 |
| 540-7018 MTL W - BEAM GD FEN (LOW FILL CULVERT) | 250 LF | $40.00 | $90.29 | 0.44x | -$12,572 |
| 770-7018 REPLACE BLOCKOUT | 250 EA | $12.00 | $44.95 | 0.27x | -$8,239 |
| 770-7009 REPLACE STEEL POST W/ CONC FND | 250 EA | $10.00 | $41.43 | 0.24x | -$7,858 |
| 770-7019 REPAIR STEEL POST WITH BASE PLATE | 50 EA | $25.00 | $137.68 | 0.18x | -$5,634 |
| 540-7005 MTL BEAM GD FEN TRANS (THRIE-BEAM) | 2 EA | $10.00 | $2,218.70 | 0.00x | -$4,417 |
| 544-7002 GUARDRAIL END TREATMENT (MOVE & RESET) | 5 EA | $1.00 | $669.70 | 0.00x | -$3,343 |
| 542-7001 REMOVE METAL BEAM GUARD FENCE | 1,500 LF | $1.00 | $2.84 | 0.35x | -$2,765 |
| 540-7006 MTL BEAM GD FEN TRANS (TL2) | 2 EA | $10.00 | $1,367.97 | 0.01x | -$2,716 |
TI-ZACK CONCRETE, LLC: unbalanced items
Placed 5| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 540-7002 MTL W-BEAM GD FEN (STEEL POST) | 1,500 LF | $82.50 | $30.74 | 2.68x | $77,634 |
| 500-7033 MOBILIZATION (EMERGENCY) | 12 EA | $4,000.00 | $844.81 | 4.73x | $37,862 |
| 540-7038 MTL W-BEAM GD FEN (NESTED)(STEEL POST) | 150 LF | $159.50 | $25.83 | 6.17x | $20,050 |
| 770-7020 RESET SGT IMPACT HEAD | 10 EA | $1,650.00 | $142.42 | 11.59x | $15,076 |
| 540-7040 MBGF (W-BEAM) (MED BAR) | 250 LF | $72.60 | $26.29 | 2.76x | $11,578 |
| 500-7002 MOBILIZATION (CALLOUT) | 12 EA | $1,500.00 | $600.85 | 2.50x | $10,790 |
| 771-7012 REPAIR CONCRETE FOUNDATION (TL-4) | 5 EA | $1,320.00 | $68.08 | 19.39x | $6,260 |
| 540-7028 MTL BM GD FEN TRANS (31"-28") | 10 EA | $825.00 | $256.17 | 3.22x | $5,688 |
| 771-7016 REPLACE CABLE (TL-4) | 1,000 LF | $7.70 | $2.15 | 3.58x | $5,551 |
| 540-7006 MTL BEAM GD FEN TRANS (TL2) | 2 EA | $3,080.00 | $1,367.97 | 2.25x | $3,424 |
| 770-7006 REPLACE TIMBER POST W/O CONC FND | 250 EA | $16.50 | $89.82 | 0.18x | -$18,330 |
| 770-7008 REPLACE TIMBER POST W/ CONC FND | 250 EA | $27.50 | $94.21 | 0.29x | -$16,678 |
| 658-7036 INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2 | 250 EA | $9.90 | $37.39 | 0.26x | -$6,873 |
| 658-7018 INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2 | 250 EA | $7.70 | $35.16 | 0.22x | -$6,864 |
| 770-7007 REPLACE STEEL POST W/O CONC FND | 250 EA | $22.00 | $46.70 | 0.47x | -$6,174 |
| 540-7029 MTL BM GD FEN TRANS (ANCHOR PLATE) | 10 EA | $196.90 | $757.97 | 0.26x | -$5,611 |
| 770-7019 REPAIR STEEL POST WITH BASE PLATE | 50 EA | $36.30 | $137.68 | 0.26x | -$5,069 |
| 658-7019 INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI) | 250 EA | $12.10 | $26.51 | 0.46x | -$3,603 |