Abilene Area Office Callout MBGF Repair
6492-52-001 · let Dec 2, 2025 · Taylor, Abilene · Routine Maintenance Project - Sealed
$845,277Low bid: BK FIELD OPERATIONS LLC-38.8% vs estimate $1,381,930
$140,440Left on the table16.6% gap to the second bid
4BiddersSpread 107% low to high
29Items comparedAgainst statewide low-bid averages
The bids
| # | Bidder | Total | vs low | vs estimate | Gap to next | Loaded items | Cut items |
|---|---|---|---|---|---|---|---|
| 1 | BK FIELD OPERATIONS LLC | $845,277 | -38.8% | $140,440 | 3+$176,267 | 12-$473,407 | |
| 2 | AUSTIN BARRICADE COMPANY, L.L.C. | $985,717 | +16.6% | -28.7% | $426,693 | 3+$223,400 | 7-$387,535 |
| 3 | HJC FARMS, INC. | $1,412,410 | +67.1% | 2.2% | $340,190 | 0 | 6-$154,437 |
| 4 | E.V.G. ENTERPRISE | $1,752,600 | +107.3% | 26.8% | 4+$439,112 | 0 |
Loaded: priced 1.75x or more over the statewide average low bid. Cut: half of it or less. Only items worth at least $2,500 or 0.5% of the bid count. Checked for the top 4 bidders.
Where the job was won
BK FIELD OPERATIONS LLC vs AUSTIN BARRICADE COMPANY, L.L.C., biggest item swings| Item | Qty | Low | 2nd | Market | 2nd minus low |
|---|---|---|---|---|---|
| 770-7001 REPLACE RAIL ELEMENT (W-BEAM) | 8,300 LF | $0.1000 | $20.00 | $22.03 | $165,170 |
| 771-7007 REPLACE POSTS (TL-4)(TRINITY) | 1,010 EA | $220.00 | $350.00 | $144.70 | $131,300 |
| 771-7005 REPLACE POSTS (TL-4)(GIBRALTAR) | 1,010 EA | $127.00 | $1.00 | $159.54 | -$127,260 |
| 770-7008 REPLACE TIMBER POST W/ CONC FND | 190 EA | $550.00 | $75.00 | $94.21 | -$90,250 |
| 770-7006 REPLACE TIMBER POST W/O CONC FND | 173 EA | $550.00 | $75.00 | $89.82 | -$82,175 |
| 770-7013 REM OBSOLETE GET & REPL W/ SGT | 105 EA | $2,400.00 | $3,000.00 | $2,869.78 | $63,000 |
| 771-7014 REPR OR REPLC CABLE BARR TERM SEC(TL-4) | 55 EA | $1.00 | $500.00 | $1,019.22 | $27,445 |
| 500-7002 MOBILIZATION (CALLOUT) | 5 EA | $1.00 | $2,500.00 | $600.85 | $12,495 |
| 770-7010 REALIGN POSTS | 255 EA | $1.00 | $50.00 | $24.32 | $12,495 |
| 770-7027 REPAIR RAIL ELEMENT (CURVED RAIL) | 325 LF | $1.00 | $33.00 | $24.16 | $10,400 |
| 778-7002 CONCRETE RAIL REPAIR (MISC) | 26 LF | $500.00 | $145.00 | $113.22 | -$9,230 |
| 770-7016 REPLACE SINGLE GDRAIL TERMINAL RAIL | 110 LF | $12.00 | $60.00 | $31.82 | $5,280 |
| 770-7015 REPL SINGLE GDRAIL TERM IMPACT HEAD | 5 EA | $500.00 | $1,500.00 | $975.38 | $5,000 |
| 770-7003 REPL RAIL ELMNT(THRIE-BM TRANS TO W-BM) | 75 EA | $1.00 | $65.00 | $65.99 | $4,800 |
| 771-7010 CABLE SPLICE / TURNBUCKLE (TL-4) | 40 EA | $1.00 | $100.00 | $88.10 | $3,960 |
| 503-7001 PORTABLE CHANGEABLE MESSAGE SIGN | 50 DAY | $1.00 | $75.00 | $87.82 | $3,700 |
| 770-7018 REPLACE BLOCKOUT | 850 EA | $1.00 | $5.00 | $44.95 | $3,400 |
| 770-7017 REPLACE SINGLE GDRAIL TERMINAL POST | 10 EA | $100.00 | $350.00 | $67.59 | $2,500 |
| 770-7002 REPLACE RAIL ELEMENT (THRIE-BEAM) | 50 LF | $100.00 | $55.00 | $40.34 | -$2,250 |
| 658-7020 INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BR) | 4 EA | $500.00 | $50.00 | $42.34 | -$1,800 |
Positive: the low bidder was cheaper on that item. These 20 items account for $137,980 of the $140,440 gap.
BK FIELD OPERATIONS LLC: unbalanced items
Placed 1| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 770-7008 REPLACE TIMBER POST W/ CONC FND | 190 EA | $550.00 | $94.21 | 5.84x | $86,600 |
| 770-7006 REPLACE TIMBER POST W/O CONC FND | 173 EA | $550.00 | $89.82 | 6.12x | $79,611 |
| 778-7002 CONCRETE RAIL REPAIR (MISC) | 26 LF | $500.00 | $113.22 | 4.42x | $10,056 |
| 770-7001 REPLACE RAIL ELEMENT (W-BEAM) | 8,300 LF | $0.1000 | $22.03 | 0.00x | -$181,998 |
| 500-7033 MOBILIZATION (EMERGENCY) | 100 EA | $1.00 | $844.81 | 0.00x | -$84,381 |
| 505-7001 TMA (STATIONARY) | 300 DAY | $1.00 | $217.57 | 0.00x | -$64,972 |
| 771-7014 REPR OR REPLC CABLE BARR TERM SEC(TL-4) | 55 EA | $1.00 | $1,019.22 | 0.00x | -$56,002 |
| 770-7018 REPLACE BLOCKOUT | 850 EA | $1.00 | $44.95 | 0.02x | -$37,362 |
| 540-7015 DOWNSTREAM ANCHOR TERMINAL SECTION | 15 EA | $600.00 | $1,297.32 | 0.46x | -$10,460 |
| 770-7007 REPLACE STEEL POST W/O CONC FND | 172 EA | $1.00 | $46.70 | 0.02x | -$7,860 |
| 770-7009 REPLACE STEEL POST W/ CONC FND | 190 EA | $1.00 | $41.43 | 0.02x | -$7,682 |
| 770-7027 REPAIR RAIL ELEMENT (CURVED RAIL) | 325 LF | $1.00 | $24.16 | 0.04x | -$7,528 |
| 770-7010 REALIGN POSTS | 255 EA | $1.00 | $24.32 | 0.04x | -$5,947 |
AUSTIN BARRICADE COMPANY, L.L.C.: unbalanced items
Placed 2| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 771-7007 REPLACE POSTS (TL-4)(TRINITY) | 1,010 EA | $350.00 | $144.70 | 2.42x | $207,357 |
| 500-7002 MOBILIZATION (CALLOUT) | 5 EA | $2,500.00 | $600.85 | 4.16x | $9,496 |
| 770-7010 REALIGN POSTS | 255 EA | $50.00 | $24.32 | 2.06x | $6,548 |
| 771-7005 REPLACE POSTS (TL-4)(GIBRALTAR) | 1,010 EA | $1.00 | $159.54 | 0.01x | -$160,122 |
| 500-7033 MOBILIZATION (EMERGENCY) | 100 EA | $1.00 | $844.81 | 0.00x | -$84,381 |
| 505-7001 TMA (STATIONARY) | 300 DAY | $1.00 | $217.57 | 0.00x | -$64,972 |
| 770-7018 REPLACE BLOCKOUT | 850 EA | $5.00 | $44.95 | 0.11x | -$33,962 |
| 771-7014 REPR OR REPLC CABLE BARR TERM SEC(TL-4) | 55 EA | $500.00 | $1,019.22 | 0.49x | -$28,557 |
| 770-7007 REPLACE STEEL POST W/O CONC FND | 172 EA | $1.00 | $46.70 | 0.02x | -$7,860 |
| 770-7009 REPLACE STEEL POST W/ CONC FND | 190 EA | $1.00 | $41.43 | 0.02x | -$7,682 |
HJC FARMS, INC.: unbalanced items
Placed 3| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 500-7033 MOBILIZATION (EMERGENCY) | 100 EA | $1.00 | $844.81 | 0.00x | -$84,381 |
| 770-7018 REPLACE BLOCKOUT | 850 EA | $3.50 | $44.95 | 0.08x | -$35,237 |
| 770-7008 REPLACE TIMBER POST W/ CONC FND | 190 EA | $40.00 | $94.21 | 0.42x | -$10,300 |
| 770-7006 REPLACE TIMBER POST W/O CONC FND | 173 EA | $40.00 | $89.82 | 0.45x | -$8,619 |
| 770-7007 REPLACE STEEL POST W/O CONC FND | 172 EA | $0.0100 | $46.70 | 0.00x | -$8,030 |
| 770-7009 REPLACE STEEL POST W/ CONC FND | 190 EA | $0.0100 | $41.43 | 0.00x | -$7,870 |
E.V.G. ENTERPRISE: unbalanced items
Placed 4| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 770-7013 REM OBSOLETE GET & REPL W/ SGT | 105 EA | $6,000.00 | $2,869.78 | 2.09x | $328,673 |
| 771-7014 REPR OR REPLC CABLE BARR TERM SEC(TL-4) | 55 EA | $2,000.00 | $1,019.22 | 1.96x | $53,943 |
| 770-7009 REPLACE STEEL POST W/ CONC FND | 190 EA | $200.00 | $41.43 | 4.83x | $30,128 |
| 770-7007 REPLACE STEEL POST W/O CONC FND | 172 EA | $200.00 | $46.70 | 4.28x | $26,368 |