US 59 from SH 155 to Marion C/L
0062-04-052 · let Jan 6, 2026 · Cass, Atlanta · Restoration
$7,736,641Low bid: SILVER CREEK CONSTRUCTION, INC.-3.3% vs estimate $8,004,038
$1,142,071Left on the table14.8% gap to the second bid
5BiddersSpread 47% low to high
54Items comparedAgainst statewide low-bid averages
The bids
| # | Bidder | Total | vs low | vs estimate | Gap to next | Loaded items | Cut items |
|---|---|---|---|---|---|---|---|
| 1 | SILVER CREEK CONSTRUCTION, INC. | $7,736,641 | -3.3% | $1,142,071 | 0 | 0 | |
| 2 | WINDING ROAD CONSTRUCTION, INC. | $8,878,711 | +14.8% | 10.9% | $688,866 | 2+$305,046 | 1-$127,191 |
| 3 | O. TREVINO CONSTRUCTION, LLC | $9,567,578 | +23.7% | 19.5% | $442,042 | 2+$484,908 | 0 |
| 4 | GREY SKY CONSTRUCTION LLC | $10,009,620 | +29.4% | 25.1% | $1,388,901 | 2+$330,283 | 1-$261,967 |
| 5 | EAST TEXAS BRIDGE, INC. | $11,398,521 | +47.3% | 42.4% | 1+$101,501 | 1-$229,492 |
Loaded: priced 1.75x or more over the statewide average low bid. Cut: half of it or less. Only items worth at least $2,500 or 0.5% of the bid count. Checked for the top 5 bidders.
Where the job was won
SILVER CREEK CONSTRUCTION, INC. vs WINDING ROAD CONSTRUCTION, INC., biggest item swings| Item | Qty | Low | 2nd | Market | 2nd minus low |
|---|---|---|---|---|---|
| 361-7058 FULL - DEPTH REPAIR CRCP (13") | 30,909 SY | $193.00 | $229.00 | $196.12 | $1,112,724 |
| 505-7001 TMA (STATIONARY) | 156 DAY | $200.00 | $1,677.00 | $217.57 | $230,412 |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 14 MO | $10,000.00 | $2,500.00 | $11,585.04 | -$105,000 |
| 500-7001 MOBILIZATION | 1 LS | $773,000.00 | $680,520.00 | $523,850.32 | -$92,480 |
| 720-7001 SPALLING REPAIR (HYDRAULIC CEMENT) | 2,165 CF | $154.75 | $119.00 | $206.00 | -$77,399 |
| 505-7003 TMA (MOBILE OPERATION) | 24 DAY | $550.00 | $1,677.00 | $229.60 | $27,048 |
| 503-7002 PORTABLE CHANGEABLE MESSAGE SIGN | 2 EA | $20,000.00 | $10,000.00 | $9,253.78 | -$20,000 |
| 677-7002 ELIM EXT PM & MRKS (6") | 344,655 LF | $0.4500 | $0.5000 | $0.2755 | $17,233 |
| 533-7003 MILL RUMBLE STRIPS (CONC) (SHLDR) | 2,000 LF | $6.00 | $12.50 | $0.8732 | $13,000 |
| 666-7315 ALL-WTHER PM TY I (Y)6"(SLD)(100MIL) | 161,131 LF | $0.5700 | $0.6300 | $0.6819 | $9,668 |
| 666-7309 ALL-WTHER PM TY I (W)6"(SLD)(100MIL) | 158,401 LF | $0.5700 | $0.6300 | $0.6917 | $9,504 |
| 401-7001 FLOWABLE BACKFILL | 30 CY | $300.00 | $500.00 | $298.77 | $6,000 |
| 678-7002 PAV SURF PREP FOR MRK (6") | 344,655 LF | $0.0100 | $0.0200 | $0.0662 | $3,447 |
| 666-7430 ALL-WTHER PM TY I (BLK)6"(SHADOW)100MIL | 19,800 LF | $0.6500 | $0.7200 | $0.6909 | $1,386 |
| 668-7111 PREFAB PM TY C (W)(36")(YLD TRI) | 273 EA | $50.00 | $55.00 | $38.96 | $1,365 |
| 666-7310 ALL-WTHER PM TY I (W)6"(BRK)(100MIL) | 19,790 LF | $0.6000 | $0.6600 | $0.8630 | $1,187 |
| 677-7004 ELIM EXT PM & MRKS (8") | 11,590 LF | $0.7000 | $0.7700 | $0.6468 | $811 |
| 666-7425 ALL-WTHER PM TY I (W) 8"(SLD)(100MIL) | 6,090 LF | $0.9000 | $0.9900 | $1.07 | $548 |
| 677-7024 ELIM EXT PM & MRKS (36")(YLD TRI) | 273 EA | $20.00 | $22.00 | $17.68 | $546 |
| 672-7004 REFL PAV MRKR TY II-A-A | 1,271 EA | $4.00 | $4.40 | $3.97 | $508 |
Positive: the low bidder was cheaper on that item. These 20 items account for $1,140,509 of the $1,142,071 gap.