Bid Tab X-ray: 6495-99-001

Jan 13, 2026 · Pecos Sign up free
Set your company to personalize scores

6495-99-001 ASPPM

6495-99-001 · let Jan 13, 2026 · Pecos, Odessa · Material Maintenance Project

$101,065Low bid: SOUTHERN SOURCING SOLUTIONS, LLC-5.5% vs estimate $107,000
$235Left on the table0.2% gap to the second bid
2BiddersSpread 0% low to high
5Items comparedAgainst statewide low-bid averages

The bids

#BidderTotalvs lowvs estimateGap to nextLoaded itemsCut items
1SOUTHERN SOURCING SOLUTIONS, LLC $101,065-5.5% $235 0 0
2TOUCHSTONE RESOURCES, LLC $101,300+0.2%-5.3% 0 0

Loaded: priced 1.75x or more over the statewide average low bid. Cut: half of it or less. Only items worth at least $2,500 or 0.5% of the bid count. Checked for the top 2 bidders.

Where the job was won

SOUTHERN SOURCING SOLUTIONS, LLC vs TOUCHSTONE RESOURCES, LLC, biggest item swings
ItemQtyLow2ndMarket2nd minus low
8012-7043 ASPH CONC PATCH MAT (DEL)(ST4)100 TON $203.00$215.00$197.37 $1,200
8012-7041 ASPH CONC PATCH MAT (DEL)(ST2)100 TON $199.98$196.00$175.27 -$398
8012-7040 ASPH CONC PATCH MAT (DEL)(ST1)100 TON $190.72$187.00$158.39 -$372
8012-7042 ASPH CONC PATCH MAT (DEL)(ST3)100 TON $203.20$200.00$195.54 -$320
8012-7044 ASPH CONC PATCH MAT (DEL)(ST5)100 TON $213.75$215.00$197.24 $125

Positive: the low bidder was cheaper on that item. These 5 items account for $235 of the $235 gap.