Bid Tab X-ray: 6491-03-001

Jan 14, 2026 · Rockwall Sign up free
Set your company to personalize scores

Rockwall Veg Mgmt FY 2026

6491-03-001 · let Jan 14, 2026 · Rockwall, Dallas · Routine Maintenance Project - Sealed

$643,984Low bid: JASCO+20.5% vs estimate $534,507
$27,636Left on the table4.3% gap to the second bid
3BiddersSpread 10% low to high
10Items comparedAgainst statewide low-bid averages

The bids

#BidderTotalvs lowvs estimateGap to nextLoaded itemsCut items
1JASCO $643,98420.5% $27,636 1+$100,253 2-$501,837
2PREMIER CONTRACTORS LLC $671,620+4.3%25.7% $39,434 2+$125,976 1-$503,850
3ANTHONY SERVICES $711,054+10.4%33.0% 2+$79,455 1-$498,850

Loaded: priced 1.75x or more over the statewide average low bid. Cut: half of it or less. Only items worth at least $2,500 or 0.5% of the bid count. Checked for the top 3 bidders.

Where the job was won

JASCO vs PREMIER CONTRACTORS LLC, biggest item swings
ItemQtyLow2ndMarket2nd minus low
731-7002 BROADCAST APPLICATION98 MI $1,000.00$1,200.00$906.21 $19,600
731-7005 WICK APPLICATION OF HERBICIDE1,399 AC $90.00$100.00$83.77 $13,990
734-7001 LITTER REMOVAL2,390 AC $25.00$30.00$15.14 $11,950
730-7016 FULL-WIDTH MOWING (RURAL)2,030 AC $50.00$45.00$44.99 -$10,150
731-7003 PAVEMENT EDGES, STRUCTURES & FIXTURES98 MI $1,400.00$1,300.00$377.01 -$9,800
500-7001 MOBILIZATION1 LS $27,500.00$20,000.00$523,850.32 -$7,500
505-7003 TMA (MOBILE OPERATION)24 DAY $1.00$200.00$229.60 $4,776
730-7020 STRIP MOWING200 AC $40.00$50.00$32.12 $2,000
730-7017 FULL-WIDTH MOWING (URBAN)1,520 AC $55.00$56.00$47.61 $1,520
730-7021 SPOT MOWING50 AC $50.00$75.00$30.27 $1,250

Positive: the low bidder was cheaper on that item. These 10 items account for $27,636 of the $27,636 gap.

JASCO: unbalanced items

Placed 1
ItemQtyTheir priceMarketx market$ vs market
731-7003 PAVEMENT EDGES, STRUCTURES & FIXTURES98 MI $1,400.00$377.013.71x$100,253
500-7001 MOBILIZATION1 LS $27,500.00$523,850.320.05x-$496,350
505-7003 TMA (MOBILE OPERATION)24 DAY $1.00$229.600.00x-$5,486

PREMIER CONTRACTORS LLC: unbalanced items

Placed 2
ItemQtyTheir priceMarketx market$ vs market
731-7003 PAVEMENT EDGES, STRUCTURES & FIXTURES98 MI $1,300.00$377.013.45x$90,453
734-7001 LITTER REMOVAL2,390 AC $30.00$15.141.98x$35,522
500-7001 MOBILIZATION1 LS $20,000.00$523,850.320.04x-$503,850

ANTHONY SERVICES: unbalanced items

Placed 3
ItemQtyTheir priceMarketx market$ vs market
731-7003 PAVEMENT EDGES, STRUCTURES & FIXTURES98 MI $1,100.00$377.012.92x$70,853
505-7003 TMA (MOBILE OPERATION)24 DAY $588.00$229.602.56x$8,602
500-7001 MOBILIZATION1 LS $25,000.00$523,850.320.05x-$498,850