FM 1082 FY 24 HSIP JONES CO
0975-02-023 · let Jan 7, 2026 · Jones, Abilene · Safety Improvement Projects
$2,611,155Low bid: J. H. STRAIN & SONS, INC.-4.9% vs estimate $2,746,601
$248,089Left on the table9.5% gap to the second bid
5BiddersSpread 37% low to high
60Items comparedAgainst statewide low-bid averages
The bids
| # | Bidder | Total | vs low | vs estimate | Gap to next | Loaded items | Cut items |
|---|---|---|---|---|---|---|---|
| 1 | J. H. STRAIN & SONS, INC. | $2,611,155 | -4.9% | $248,089 | 2+$290,678 | 2-$384,859 | |
| 2 | ROMAN EMPERORS ROAD, LLC | $2,859,244 | +9.5% | 4.1% | $137,459 | 4+$327,561 | 0 |
| 3 | CK NEWBERRY, LLC | $2,996,702 | +14.8% | 9.1% | $59,308 | 4+$122,102 | 1-$23,109 |
| 4 | GREY SKY CONSTRUCTION LLC | $3,056,010 | +17.0% | 11.3% | $519,626 | 8+$414,837 | 0 |
| 5 | A. L. HELMCAMP, INC. | $3,575,636 | +36.9% | 30.2% | 5+$746,400 | 1-$29,637 |
Loaded: priced 1.75x or more over the statewide average low bid. Cut: half of it or less. Only items worth at least $2,500 or 0.5% of the bid count. Checked for the top 5 bidders.
Where the job was won
J. H. STRAIN & SONS, INC. vs ROMAN EMPERORS ROAD, LLC, biggest item swings| Item | Qty | Low | 2nd | Market | 2nd minus low |
|---|---|---|---|---|---|
| 110-7001 EXCAV (ROADWAY) | 11,329 CY | $12.00 | $30.00 | $11.68 | $203,922 |
| 316-7007 ASPH (AC-20-5TR) | 67,045 GAL | $7.00 | $4.00 | $3.27 | -$201,135 |
| 500-7001 MOBILIZATION | 1 LS | $157,000.00 | $300,000.00 | $523,850.32 | $143,000 |
| 530-7015 DRIVEWAYS (BASE) | 2,846 SY | $22.00 | $50.00 | $27.85 | $79,688 |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 9 MO | $12,000.00 | $6,000.00 | $11,585.04 | -$54,000 |
| 530-7020 TURNOUTS (RAP) | 1,114 SY | $10.00 | $50.00 | $26.17 | $44,560 |
| 247-7176 FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS) | 4,973 CY | $70.00 | $65.00 | $88.59 | -$24,865 |
| 545-7010 CRASH CUSH ATTEN (INSTL)(R)(N)(TL3) | 2 EA | $36,300.00 | $24,000.00 | $25,783.02 | -$24,600 |
| 420-7011 CL B CONC (MISC) | 58 CY | $400.00 | $800.00 | $760.29 | $23,200 |
| 666-7266 RE PROFILE PM TY I(W)6"(SLD)(100MIL) | 81,669 LF | $0.6500 | $0.9000 | $0.6515 | $20,417 |
| 132-7002 EMBANK (FNL)(DC)(TY A) | 1,259 CY | $25.00 | $40.00 | $15.82 | $18,885 |
| 316-7211 AGGR (TY-PB, GR-4)(SAC-B) | 1,042 CY | $140.00 | $155.00 | $133.09 | $15,630 |
| 467-7324 SET (TY II) (24 IN) (CMP) (6: 1) (P) | 10 EA | $3,590.00 | $2,200.00 | $2,137.13 | -$13,900 |
| 666-7270 RE PROFILE PM TY I(Y)6"(SLD)(100MIL) | 51,815 LF | $0.6500 | $0.9000 | $0.6629 | $12,954 |
| 644-7001 IN SM RD SN SUP&AM TY10BWG(1)SA(P) | 164 EA | $720.00 | $650.00 | $696.14 | -$11,480 |
| 662-7097 WK ZN PAV MRK REMOV (Y)4"(SLD) | 7,680 LF | $0.5500 | $2.00 | $0.8126 | $11,136 |
| 462-7003 CONC BOX CULV (4 FT X 2 FT) | 72 LF | $550.00 | $420.00 | $419.86 | -$9,360 |
| 506-7039 TEMP SEDMT CONT FENCE (INSTALL) | 8,880 LF | $5.00 | $4.00 | $3.92 | -$8,880 |
| 506-7044 BIODEG EROSN CONT LOGS (INSTL) (12") | 2,360 LF | $5.00 | $8.00 | $5.23 | $7,080 |
| 316-7208 AGGR (TY-PB, GR-3)(SAC-B) | 438 CY | $140.00 | $155.00 | $110.18 | $6,570 |
Positive: the low bidder was cheaper on that item. These 20 items account for $238,822 of the $248,089 gap.
J. H. STRAIN & SONS, INC.: unbalanced items
Placed 1ROMAN EMPERORS ROAD, LLC: unbalanced items
Placed 2CK NEWBERRY, LLC: unbalanced items
Placed 3| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 316-7208 AGGR (TY-PB, GR-3)(SAC-B) | 438 CY | $225.00 | $110.18 | 2.04x | $50,292 |
| 462-7003 CONC BOX CULV (4 FT X 2 FT) | 72 LF | $800.00 | $419.86 | 1.91x | $27,370 |
| 132-7002 EMBANK (FNL)(DC)(TY A) | 1,259 CY | $35.00 | $15.82 | 2.21x | $24,146 |
| 462-7006 CONC BOX CULV (5 FT X 2 FT) | 39 LF | $1,000.00 | $479.64 | 2.08x | $20,294 |
| 505-7001 TMA (STATIONARY) | 120 DAY | $25.00 | $217.57 | 0.11x | -$23,109 |
GREY SKY CONSTRUCTION LLC: unbalanced items
Placed 4| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 316-7007 ASPH (AC-20-5TR) | 67,045 GAL | $6.00 | $3.27 | 1.84x | $183,120 |
| 132-7002 EMBANK (FNL)(DC)(TY A) | 1,259 CY | $50.00 | $15.82 | 3.16x | $43,031 |
| 420-7011 CL B CONC (MISC) | 58 CY | $1,500.00 | $760.29 | 1.97x | $42,903 |
| 316-7208 AGGR (TY-PB, GR-3)(SAC-B) | 438 CY | $200.00 | $110.18 | 1.82x | $39,342 |
| 560-7008 MAILBOX INSTALL-S (TWW-POST) TY 4 | 32 EA | $1,500.00 | $337.58 | 4.44x | $37,198 |
| 462-7003 CONC BOX CULV (4 FT X 2 FT) | 72 LF | $750.00 | $419.86 | 1.79x | $23,770 |
| 506-7044 BIODEG EROSN CONT LOGS (INSTL) (12") | 2,360 LF | $15.00 | $5.23 | 2.87x | $23,065 |
| 662-7114 WK ZN PAV MRK SHT TERM (TAB)TY Y-2 | 4,128 EA | $6.00 | $0.5715 | 10.50x | $22,409 |
A. L. HELMCAMP, INC.: unbalanced items
Placed 5| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 110-7001 EXCAV (ROADWAY) | 11,329 CY | $32.00 | $11.68 | 2.74x | $230,180 |
| 351-7003 FLEXIBLE PAVEMENT STRUCTURE REPAIR(4") | 5,726 SY | $67.00 | $35.01 | 1.91x | $183,147 |
| 316-7208 AGGR (TY-PB, GR-3)(SAC-B) | 438 CY | $500.00 | $110.18 | 4.54x | $170,742 |
| 316-7211 AGGR (TY-PB, GR-4)(SAC-B) | 1,042 CY | $250.00 | $133.09 | 1.88x | $121,818 |
| 132-7002 EMBANK (FNL)(DC)(TY A) | 1,259 CY | $48.00 | $15.82 | 3.03x | $40,513 |
| 508-7001 CONSTRUCTING DETOURS | 610 SY | $35.00 | $83.58 | 0.42x | -$29,637 |