SS 63, US 80 - SL 281
0138-08-033 · let Feb 4, 2026 · Gregg, Tyler · Rehabilitation of Existing Road
$3,172,923Low bid: MADDEN CONTRACTING COMPANY, LLC.-9.7% vs estimate $3,513,305
$109,901Left on the table3.5% gap to the second bid
4BiddersSpread 34% low to high
59Items comparedAgainst statewide low-bid averages
The bids
| # | Bidder | Total | vs low | vs estimate | Gap to next | Loaded items | Cut items |
|---|---|---|---|---|---|---|---|
| 1 | MADDEN CONTRACTING COMPANY, LLC. | $3,172,923 | -9.7% | $109,901 | 1+$89,809 | 3-$481,478 | |
| 2 | EAST TEXAS BRIDGE, INC. | $3,282,823 | +3.5% | -6.6% | $353,288 | 0 | 1-$323,850 |
| 3 | LONGVIEW BRIDGE AND ROAD, LTD. | $3,636,112 | +14.6% | 3.5% | $615,861 | 0 | 0 |
| 4 | DREWERY CONSTRUCTION COMPANY, INCORPORATED | $4,251,973 | +34.0% | 21.0% | 3+$337,278 | 1-$103,931 |
Loaded: priced 1.75x or more over the statewide average low bid. Cut: half of it or less. Only items worth at least $2,500 or 0.5% of the bid count. Checked for the top 4 bidders.
Where the job was won
MADDEN CONTRACTING COMPANY, LLC. vs EAST TEXAS BRIDGE, INC., biggest item swings| Item | Qty | Low | 2nd | Market | 2nd minus low |
|---|---|---|---|---|---|
| 500-7001 MOBILIZATION | 1 LS | $102,000.00 | $200,000.00 | $523,850.32 | $98,000 |
| 354-7051 PLANE ASPH CONC PAV(2") | 109,357 SY | $1.75 | $2.45 | $1.86 | $76,550 |
| 351-7007 FLEXIBLE PAVEMENT STRUCTURE REPAIR(8") | 1,000 SY | $150.00 | $79.70 | $60.19 | -$70,300 |
| 354-7097 PLANE ASPH CONC PAV (1.25") | 70,827 SY | $2.50 | $1.75 | $2.50 | -$53,120 |
| 662-7122 WK ZN PAV MRK SHT TERM RMV (W)(6") | 18,648 LF | $0.0100 | $1.65 | $1.09 | $30,583 |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 6 MO | $5,000.00 | $10,000.00 | $11,585.04 | $30,000 |
| 344-7081 SP MIXES SP-C SAC-A PG 82-22 | 12,029 TON | $180.50 | $179.00 | $180.50 | -$18,044 |
| 3005-7001 MEMBRANE UNDERSEAL | 21,871 GAL | $4.00 | $4.75 | $4.76 | $16,403 |
| 503-7001 PORTABLE CHANGEABLE MESSAGE SIGN | 200 DAY | $50.00 | $100.00 | $87.82 | $10,000 |
| 479-7003 ADJUSTING MANHOLES & INLETS | 3 EA | $4,000.00 | $1,000.00 | $1,535.11 | -$9,000 |
| 505-7001 TMA (STATIONARY) | 86 DAY | $300.00 | $200.00 | $217.57 | -$8,600 |
| 662-7123 WK ZN PAV MRK SHT TERM RMV (Y)(6") | 18,538 LF | $1.85 | $1.65 | $1.21 | -$3,708 |
| 505-7003 TMA (MOBILE OPERATION) | 14 DAY | $0.0100 | $200.00 | $229.60 | $2,800 |
| 666-7423 REFL PAV MRK TY I (Y)6"(SLD)(100MIL) | 37,606 LF | $0.7000 | $0.7700 | $0.4986 | $2,632 |
| 401-7001 FLOWABLE BACKFILL | 5 CY | $1,000.00 | $500.00 | $298.77 | -$2,500 |
| 666-7411 REFL PAV MRK TY I (W)6"(SLD)(100MIL) | 30,740 LF | $0.7000 | $0.7700 | $0.4757 | $2,152 |
| 432-7031 RIPRAP (STONE COMMON)(DRY)(12 IN) | 10 CY | $500.00 | $300.00 | $152.41 | -$2,000 |
| 662-7038 WK ZN PAV MRK NON-REMOV (Y)6"(SLD) | 37,606 LF | $0.6000 | $0.6500 | $0.2770 | $1,880 |
| 644-7001 IN SM RD SN SUP&AM TY10BWG(1)SA(P) | 20 EA | $679.00 | $750.00 | $696.14 | $1,420 |
| 160-7002 FURN & PLACE TOPSOIL (4") | 70 SY | $28.57 | $10.00 | $1.43 | -$1,300 |
Positive: the low bidder was cheaper on that item. These 20 items account for $103,849 of the $109,901 gap.
MADDEN CONTRACTING COMPANY, LLC.: unbalanced items
Placed 1| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 351-7007 FLEXIBLE PAVEMENT STRUCTURE REPAIR(8") | 1,000 SY | $150.00 | $60.19 | 2.49x | $89,809 |
| 500-7001 MOBILIZATION | 1 LS | $102,000.00 | $523,850.32 | 0.19x | -$421,850 |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 6 MO | $5,000.00 | $11,585.04 | 0.43x | -$39,510 |
| 662-7122 WK ZN PAV MRK SHT TERM RMV (W)(6") | 18,648 LF | $0.0100 | $1.09 | 0.01x | -$20,117 |
EAST TEXAS BRIDGE, INC.: unbalanced items
Placed 2| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 500-7001 MOBILIZATION | 1 LS | $200,000.00 | $523,850.32 | 0.38x | -$323,850 |
DREWERY CONSTRUCTION COMPANY, INCORPORATED: unbalanced items
Placed 4| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 354-7051 PLANE ASPH CONC PAV(2") | 109,357 SY | $4.00 | $1.86 | 2.15x | $234,352 |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 6 MO | $25,000.00 | $11,585.04 | 2.16x | $80,490 |
| 503-7001 PORTABLE CHANGEABLE MESSAGE SIGN | 200 DAY | $200.00 | $87.82 | 2.28x | $22,436 |
| 3005-7001 MEMBRANE UNDERSEAL | 21,871 GAL | $0.0100 | $4.76 | 0.00x | -$103,931 |