Bid Tab X-ray: 1549-03-031

Feb 4, 2026 · San Patricio Sign up free
Set your company to personalize scores

FM 1069 San Pat overlay pt 2

1549-03-031 · let Feb 4, 2026 · San Patricio, Corpus Christi · Overlay

$2,477,701Low bid: ANDERSON COLUMBIA CO., INC.-0.7% vs estimate $2,494,844
$35,335Left on the table1.4% gap to the second bid
4BiddersSpread 15% low to high
82Items comparedAgainst statewide low-bid averages

The bids

#BidderTotalvs lowvs estimateGap to nextLoaded itemsCut items
1ANDERSON COLUMBIA CO., INC. $2,477,701-0.7% $35,335 0 4-$1,316,904
2HUNTER INDUSTRIES, LTD. $2,513,036+1.4%0.7% $220,194 0 4-$1,249,468
3CK NEWBERRY, LLC $2,733,230+10.3%9.6% $114,663 0 5-$1,115,658
4J E CONSTRUCTION SERVICES, LLC $2,847,893+14.9%14.2% 2+$67,298 3-$1,157,238

Loaded: priced 1.75x or more over the statewide average low bid. Cut: half of it or less. Only items worth at least $2,500 or 0.5% of the bid count. Checked for the top 4 bidders.

Where the job was won

ANDERSON COLUMBIA CO., INC. vs HUNTER INDUSTRIES, LTD., biggest item swings
ItemQtyLow2ndMarket2nd minus low
500-7001 MOBILIZATION1 LS $65,000.00$170,017.22$523,850.32 $105,017
502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING7 MO $12,000.00$1,910.33$11,585.04 -$70,628
354-7003 PLANE & TEXT ASPH CONC PAV(0" TO 3")94,617 SY $1.45$2.09$2.75 $60,555
530-7010 DRIVEWAYS (ACP)2,878 SY $45.00$30.80$54.96 -$40,868
316-7212 AGGR (TY-PB, GR-4S OR 4)(SAC-B)873 CY $165.00$132.30$125.13 -$28,547
100-7002 PREPARING ROW141 STA $175.00$304.70$6,072.92 $18,288
351-7004 FLEXIBLE PAVEMENT STRUCTURE REPAIR(5")2,449 SY $42.00$36.38$35.89 -$13,763
505-7003 TMA (MOBILE OPERATION)107 DAY $100.00$189.44$229.60 $9,570
316-7070 ASPH(AC-15P, HFRS-2P OR CRS-2P)33,126 GAL $3.60$3.41$3.32 -$6,294
506-7044 BIODEG EROSN CONT LOGS (INSTL) (12")526 LF $9.00$19.25$5.23 $5,392
529-7002 CONC CURB (TY II)691 LF $18.00$23.00$26.45 $3,455
666-7422 REFL PAV MRK TY I (Y)6"(SLD)(090MIL)25,684 LF $0.7500$0.6600$0.5014 -$2,312
668-7089 PREFAB PM TY C (W)(24")(SLD)1,042 LF $18.00$16.00$13.72 -$2,084
505-7001 TMA (STATIONARY)107 DAY $100.00$81.19$217.57 -$2,013
658-7078 REMOVE DELIN & OBJECT MARKER ASSMS107 EA $11.00$28.00$23.28 $1,819
341-7050 D-GR HMA TY-D SAC-B PG70-2213,120 TON $114.50$114.40$116.75 -$1,312
662-7114 WK ZN PAV MRK SHT TERM (TAB)TY Y-23,882 EA $1.30$1.63$0.5715 $1,281
662-7112 WK ZN PAV MRK SHT TERM (TAB)TY W2,105 EA $1.20$1.63$1.03 $905
506-7046 BIODEG EROSN CONT LOGS (REMOVE)526 LF $3.00$4.50$1.29 $789
662-7038 WK ZN PAV MRK NON-REMOV (Y)6"(SLD)25,684 LF $0.3500$0.3200$0.2770 -$771

Positive: the low bidder was cheaper on that item. These 20 items account for $38,480 of the $35,335 gap.

ANDERSON COLUMBIA CO., INC.: unbalanced items

Placed 1
ItemQtyTheir priceMarketx market$ vs market
100-7002 PREPARING ROW141 STA $175.00$6,072.920.03x-$831,607
500-7001 MOBILIZATION1 LS $65,000.00$523,850.320.12x-$458,850
505-7003 TMA (MOBILE OPERATION)107 DAY $100.00$229.600.44x-$13,867
505-7001 TMA (STATIONARY)107 DAY $100.00$217.570.46x-$12,580

HUNTER INDUSTRIES, LTD.: unbalanced items

Placed 2
ItemQtyTheir priceMarketx market$ vs market
100-7002 PREPARING ROW141 STA $304.70$6,072.920.05x-$813,319
500-7001 MOBILIZATION1 LS $170,017.22$523,850.320.32x-$353,833
502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING7 MO $1,910.33$11,585.040.16x-$67,723
505-7001 TMA (STATIONARY)107 DAY $81.19$217.570.37x-$14,593

CK NEWBERRY, LLC: unbalanced items

Placed 3
ItemQtyTheir priceMarketx market$ vs market
100-7002 PREPARING ROW141 STA $50.00$6,072.920.01x-$849,232
354-7003 PLANE & TEXT ASPH CONC PAV(0" TO 3")94,617 SY $1.00$2.750.36x-$165,684
502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING7 MO $2,500.00$11,585.040.22x-$63,595
505-7003 TMA (MOBILE OPERATION)107 DAY $50.00$229.600.22x-$19,217
505-7001 TMA (STATIONARY)107 DAY $50.00$217.570.23x-$17,930

J E CONSTRUCTION SERVICES, LLC: unbalanced items

Placed 4
ItemQtyTheir priceMarketx market$ vs market
505-7003 TMA (MOBILE OPERATION)107 DAY $685.00$229.602.98x$48,728
662-7038 WK ZN PAV MRK NON-REMOV (Y)6"(SLD)25,684 LF $1.00$0.27703.61x$18,570
100-7002 PREPARING ROW141 STA $224.00$6,072.920.04x-$824,698
500-7001 MOBILIZATION1 LS $260,156.00$523,850.320.50x-$263,694
502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING7 MO $1,750.00$11,585.040.15x-$68,845