Bid Tab X-ray: 6496-95-001

Mar 18, 2026 · Harrison Sign up free
Set your company to personalize scores

Callout Cable Barrier Repair (S) FY '26

6496-95-001 · let Mar 18, 2026 · Harrison, Atlanta · Routine Maintenance Project

$597,215Low bid: BK FIELD OPERATIONS LLC+3.9% vs estimate $574,800
$137,410Left on the table23.0% gap to the second bid
3BiddersSpread 28% low to high
21Items comparedAgainst statewide low-bid averages

The bids

#BidderTotalvs lowvs estimateGap to nextLoaded itemsCut items
1BK FIELD OPERATIONS LLC $597,2153.9% $137,410 3+$229,223 8-$224,692
2H. V. CAVER, INC. $734,625+23.0%27.8% $29,725 3+$94,109 6-$95,483
3AUSTIN BARRICADE COMPANY, L.L.C. $764,350+28.0%33.0% 5+$324,545 7-$184,280

Loaded: priced 1.75x or more over the statewide average low bid. Cut: half of it or less. Only items worth at least $2,500 or 0.5% of the bid count. Checked for the top 3 bidders.

Where the job was won

BK FIELD OPERATIONS LLC vs H. V. CAVER, INC., biggest item swings
ItemQtyLow2ndMarket2nd minus low
771-7001 REPLACE POSTS (TL-3)(GIBRALTAR)2,000 EA $210.00$160.75$116.37 -$98,500
771-7007 REPLACE POSTS (TL-4)(TRINITY)250 EA $1.00$271.00$144.70 $67,500
771-7005 REPLACE POSTS (TL-4)(GIBRALTAR)250 EA $1.00$167.50$159.54 $41,625
505-7001 TMA (STATIONARY)200 DAY $1.00$200.00$217.57 $39,800
771-7013 REPR OR REPLC CABLE BARR TERM SEC(TL-3)45 EA $800.00$1,500.00$971.01 $31,500
771-7020 REPLACE POST HARDWARE (TL-4)250 EA $1.00$78.75$11.22 $19,438
771-7014 REPR OR REPLC CABLE BARR TERM SEC(TL-4)20 EA $600.00$1,500.00$1,019.22 $18,000
771-7019 REPLACE POST HARDWARE (TL-3)250 EA $120.00$67.25$115.33 -$13,188
771-7003 REPLACE POSTS (TL-3)(TRINITY)250 EA $200.00$243.00$60.40 $10,750
432-7013 RIPRAP (MOW STRIP)(4 IN)100 CY $100.00$200.00$616.83 $10,000
731-7003 PAVEMENT EDGES, STRUCTURES & FIXTURES100 MI $200.00$275.00$377.01 $7,500
771-7009 CABLE SPLICE / TURNBUCKLE (TL-3)25 EA $500.00$300.00$217.53 -$5,000
771-7015 REPLACE CABLE (TL-3)1,000 LF $4.00$1.00$6.19 -$3,000
771-7010 CABLE SPLICE / TURNBUCKLE (TL-4)10 EA $1.00$300.00$88.10 $2,990
771-7011 REPAIR CONCRETE FOUNDATION (TL-3)20 EA $1.00$100.00$52.78 $1,980
505-7002 TMA (MOBILE OPERATION)100 HR $1.00$20.00$64.00 $1,900
500-7002 MOBILIZATION (CALLOUT)25 EA $1.00$50.00$600.85 $1,225
771-7017 CHECK / RE-TENSION CABLE (TL-3)300 EA $1.00$5.00$44.22 $1,200
771-7018 CHECK / RE-TENSION CABLE (TL-4)300 EA $1.00$5.00$67.25 $1,200
771-7012 REPAIR CONCRETE FOUNDATION (TL-4)10 EA $1.00$100.00$68.08 $990

Positive: the low bidder was cheaper on that item. These 20 items account for $137,910 of the $137,410 gap.

BK FIELD OPERATIONS LLC: unbalanced items

Placed 1
ItemQtyTheir priceMarketx market$ vs market
771-7001 REPLACE POSTS (TL-3)(GIBRALTAR)2,000 EA $210.00$116.371.80x$187,261
771-7003 REPLACE POSTS (TL-3)(TRINITY)250 EA $200.00$60.403.31x$34,900
771-7009 CABLE SPLICE / TURNBUCKLE (TL-3)25 EA $500.00$217.532.30x$7,062
432-7013 RIPRAP (MOW STRIP)(4 IN)100 CY $100.00$616.830.16x-$51,683
505-7001 TMA (STATIONARY)200 DAY $1.00$217.570.00x-$43,314
771-7005 REPLACE POSTS (TL-4)(GIBRALTAR)250 EA $1.00$159.540.01x-$39,634
771-7007 REPLACE POSTS (TL-4)(TRINITY)250 EA $1.00$144.700.01x-$35,924
771-7018 CHECK / RE-TENSION CABLE (TL-4)300 EA $1.00$67.250.01x-$19,876
500-7002 MOBILIZATION (CALLOUT)25 EA $1.00$600.850.00x-$14,996
771-7017 CHECK / RE-TENSION CABLE (TL-3)300 EA $1.00$44.220.02x-$12,965
505-7002 TMA (MOBILE OPERATION)100 HR $1.00$64.000.02x-$6,300

H. V. CAVER, INC.: unbalanced items

Placed 2
ItemQtyTheir priceMarketx market$ vs market
771-7003 REPLACE POSTS (TL-3)(TRINITY)250 EA $243.00$60.404.02x$45,650
771-7007 REPLACE POSTS (TL-4)(TRINITY)250 EA $271.00$144.701.87x$31,576
771-7020 REPLACE POST HARDWARE (TL-4)250 EA $78.75$11.227.02x$16,883
432-7013 RIPRAP (MOW STRIP)(4 IN)100 CY $200.00$616.830.32x-$41,683
771-7018 CHECK / RE-TENSION CABLE (TL-4)300 EA $5.00$67.250.07x-$18,676
500-7002 MOBILIZATION (CALLOUT)25 EA $50.00$600.850.08x-$13,771
771-7017 CHECK / RE-TENSION CABLE (TL-3)300 EA $5.00$44.220.11x-$11,765
771-7015 REPLACE CABLE (TL-3)1,000 LF $1.00$6.190.16x-$5,189
505-7002 TMA (MOBILE OPERATION)100 HR $20.00$64.000.31x-$4,400

AUSTIN BARRICADE COMPANY, L.L.C.: unbalanced items

Placed 3
ItemQtyTheir priceMarketx market$ vs market
771-7001 REPLACE POSTS (TL-3)(GIBRALTAR)2,000 EA $220.00$116.371.89x$207,261
771-7013 REPR OR REPLC CABLE BARR TERM SEC(TL-3)45 EA $2,000.00$971.012.06x$46,304
500-7002 MOBILIZATION (CALLOUT)25 EA $2,000.00$600.853.33x$34,979
771-7003 REPLACE POSTS (TL-3)(TRINITY)250 EA $150.00$60.402.48x$22,400
505-7002 TMA (MOBILE OPERATION)100 HR $200.00$64.003.13x$13,600
432-7013 RIPRAP (MOW STRIP)(4 IN)100 CY $50.00$616.830.08x-$56,683
505-7001 TMA (STATIONARY)200 DAY $1.00$217.570.00x-$43,314
771-7005 REPLACE POSTS (TL-4)(GIBRALTAR)250 EA $70.00$159.540.44x-$22,384
771-7018 CHECK / RE-TENSION CABLE (TL-4)300 EA $1.00$67.250.01x-$19,876
771-7007 REPLACE POSTS (TL-4)(TRINITY)250 EA $70.00$144.700.48x-$18,674
771-7017 CHECK / RE-TENSION CABLE (TL-3)300 EA $1.00$44.220.02x-$12,965
771-7014 REPR OR REPLC CABLE BARR TERM SEC(TL-4)20 EA $500.00$1,019.220.49x-$10,384