IH 45, SL 8 South to Galveston C/L
0500-03-658 · let Mar 4, 2026 · Harris, Houston · Traffic Control Devices
$1,953,428Low bid: PROFESSIONAL TRAFFIC CONTROL LLC+33.1% vs estimate $1,467,694
$95,654Left on the table4.9% gap to the second bid
4BiddersSpread 20% low to high
65Items comparedAgainst statewide low-bid averages
The bids
| # | Bidder | Total | vs low | vs estimate | Gap to next | Loaded items | Cut items |
|---|---|---|---|---|---|---|---|
| 1 | PROFESSIONAL TRAFFIC CONTROL LLC | $1,953,428 | 33.1% | $95,654 | 0 | 4-$661,581 | |
| 2 | BATTERSON, LLP | $2,049,082 | +4.9% | 39.6% | $78,147 | 0 | 4-$664,081 |
| 3 | TRP INFRASTRUCTURE SERVICES, LLC | $2,127,229 | +8.9% | 44.9% | $214,070 | 3+$62,497 | 5-$665,179 |
| 4 | STRIPE LINES, INC. | $2,341,298 | +19.9% | 59.5% | 5+$151,150 | 3-$572,515 |
Loaded: priced 1.75x or more over the statewide average low bid. Cut: half of it or less. Only items worth at least $2,500 or 0.5% of the bid count. Checked for the top 4 bidders.
Where the job was won
PROFESSIONAL TRAFFIC CONTROL LLC vs BATTERSON, LLP, biggest item swings| Item | Qty | Low | 2nd | Market | 2nd minus low |
|---|---|---|---|---|---|
| 677-7005 ELIM EXT PM & MRKS (10") | 88,780 LF | $0.7000 | $1.25 | $0.7598 | $48,829 |
| 677-7006 ELIM EXT PM & MRKS (12") | 37,069 LF | $0.7500 | $1.50 | $1.27 | $27,802 |
| 677-7002 ELIM EXT PM & MRKS (6") | 324,552 LF | $0.3500 | $0.3000 | $0.2755 | -$16,228 |
| 503-7001 PORTABLE CHANGEABLE MESSAGE SIGN | 81 DAY | $40.00 | $200.00 | $87.82 | $12,960 |
| 672-7006 REFL PAV MRKR TY II-C-R | 11,599 EA | $4.25 | $5.25 | $4.19 | $11,599 |
| 668-7093 PREFAB PM TY C (W)(DBL ARROW) | 47 EA | $275.00 | $440.00 | $314.80 | $7,755 |
| 666-7242 RE PM TY III (W)(12")(SLD) | 22,504 LF | $3.00 | $2.66 | $2.62 | -$7,651 |
| 666-7243 RE PM TY III (W)(12")(DOT) | 5,865 LF | $2.00 | $3.00 | $1.66 | $5,865 |
| 677-7008 ELIM EXT PM & MRKS (24") | 5,550 LF | $2.00 | $3.00 | $2.87 | $5,550 |
| 668-7103 PREFAB PM TY C (W)(WORD) | 166 EA | $250.00 | $280.00 | $249.54 | $4,980 |
| 666-7244 RE PM TY III (W)(24")(SLD) | 5,550 LF | $6.20 | $7.00 | $7.96 | $4,440 |
| 678-7005 PAV SURF PREP FOR MRK (10") | 88,780 LF | $0.0500 | $0.1000 | $0.0939 | $4,439 |
| 6065-7002 MLTPLY PV MK W/WTY (W) (6") (BRK) | 39,730 LF | $0.6500 | $0.7500 | $0.7024 | $3,973 |
| 678-7006 PAV SURF PREP FOR MRK (12") | 37,069 LF | $0.2500 | $0.1500 | $0.2487 | -$3,707 |
| 666-7262 RE PM TY III (BLK)(6")(SHADOW) | 40,147 LF | $0.6700 | $0.7500 | $0.7183 | $3,212 |
| 658-7012 INSTL DEL ASSM (D-SW)SZ 1(BRF)CTB | 1,361 EA | $13.00 | $15.00 | $9.89 | $2,722 |
| 666-7354 PAVEMENT SLER (WORD) | 166 EA | $27.00 | $11.00 | $35.94 | -$2,656 |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 5 MO | $1,500.00 | $1,000.00 | $11,585.04 | -$2,500 |
| 6065-7001 MLTPLY PV MK W/WTY (W) (6") (SLD) | 123,840 LF | $0.6200 | $0.6000 | $0.6352 | -$2,477 |
| 6065-7004 MLTPLY PV MK W/WTY (Y) (6") (SLD) | 117,090 LF | $0.6200 | $0.6000 | $0.6356 | -$2,342 |
Positive: the low bidder was cheaper on that item. These 20 items account for $106,565 of the $95,654 gap.
PROFESSIONAL TRAFFIC CONTROL LLC: unbalanced items
Placed 1| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 500-7001 MOBILIZATION | 1 LS | $5,000.00 | $523,850.32 | 0.01x | -$518,850 |
| 505-7003 TMA (MOBILE OPERATION) | 324 DAY | $1.00 | $229.60 | 0.00x | -$74,065 |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 5 MO | $1,500.00 | $11,585.04 | 0.13x | -$50,425 |
| 678-7002 PAV SURF PREP FOR MRK (6") | 324,552 LF | $0.0100 | $0.0662 | 0.15x | -$18,240 |
BATTERSON, LLP: unbalanced items
Placed 2| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 500-7001 MOBILIZATION | 1 LS | $5,000.00 | $523,850.32 | 0.01x | -$518,850 |
| 505-7003 TMA (MOBILE OPERATION) | 324 DAY | $1.00 | $229.60 | 0.00x | -$74,065 |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 5 MO | $1,000.00 | $11,585.04 | 0.09x | -$52,925 |
| 678-7002 PAV SURF PREP FOR MRK (6") | 324,552 LF | $0.0100 | $0.0662 | 0.15x | -$18,240 |
TRP INFRASTRUCTURE SERVICES, LLC: unbalanced items
Placed 3| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 658-7012 INSTL DEL ASSM (D-SW)SZ 1(BRF)CTB | 1,361 EA | $29.00 | $9.89 | 2.93x | $26,003 |
| 658-7032 INSTL DEL ASSM (D-SY)SZ 1(BRF)CTB (BI) | 967 EA | $29.00 | $9.51 | 3.05x | $18,846 |
| 505-7001 TMA (STATIONARY) | 20 DAY | $1,100.00 | $217.57 | 5.06x | $17,649 |
| 500-7001 MOBILIZATION | 1 LS | $27,000.00 | $523,850.32 | 0.05x | -$496,850 |
| 505-7003 TMA (MOBILE OPERATION) | 324 DAY | $10.00 | $229.60 | 0.04x | -$71,149 |
| 677-7005 ELIM EXT PM & MRKS (10") | 88,780 LF | $0.2500 | $0.7598 | 0.33x | -$45,260 |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 5 MO | $4,200.00 | $11,585.04 | 0.36x | -$36,925 |
| 678-7002 PAV SURF PREP FOR MRK (6") | 324,552 LF | $0.0200 | $0.0662 | 0.30x | -$14,994 |
STRIPE LINES, INC.: unbalanced items
Placed 4| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 666-7242 RE PM TY III (W)(12")(SLD) | 22,504 LF | $5.00 | $2.62 | 1.90x | $53,452 |
| 666-7243 RE PM TY III (W)(12")(DOT) | 5,865 LF | $6.40 | $1.66 | 3.85x | $27,786 |
| 658-7012 INSTL DEL ASSM (D-SW)SZ 1(BRF)CTB | 1,361 EA | $30.00 | $9.89 | 3.03x | $27,364 |
| 678-7005 PAV SURF PREP FOR MRK (10") | 88,780 LF | $0.3500 | $0.0939 | 3.73x | $22,737 |
| 658-7032 INSTL DEL ASSM (D-SY)SZ 1(BRF)CTB (BI) | 967 EA | $30.00 | $9.51 | 3.15x | $19,813 |
| 500-7001 MOBILIZATION | 1 LS | $5,000.00 | $523,850.32 | 0.01x | -$518,850 |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 5 MO | $4,500.00 | $11,585.04 | 0.39x | -$35,425 |
| 678-7002 PAV SURF PREP FOR MRK (6") | 324,552 LF | $0.0100 | $0.0662 | 0.15x | -$18,240 |