GTAO/NAAO Bridge FUA Repairs
0914-00-575 · let Mar 4, 2026 · Travis, Austin · Bridge Maintenance
$769,928Low bid: BK FIELD OPERATIONS LLC-25.5% vs estimate $1,033,376
$51,014Left on the table6.6% gap to the second bid
13BiddersSpread 85% low to high
36Items comparedAgainst statewide low-bid averages
The bids
| # | Bidder | Total | vs low | vs estimate | Gap to next | Loaded items | Cut items |
|---|---|---|---|---|---|---|---|
| 1 | BK FIELD OPERATIONS LLC | $769,928 | -25.5% | $51,014 | 7+$149,665 | 4-$623,885 | |
| 2 | TAYLOR BRIDGE LLC | $820,942 | +6.6% | -20.6% | $51,478 | 8+$204,449 | 5-$658,043 |
| 3 | GARRET SHIELDS INFRASTRUCTURE | $872,420 | +13.3% | -15.6% | $130,429 | 4+$115,853 | 2-$502,871 |
| 4 | ICOS MANAGEMENT, LLC | $1,002,849 | +30.3% | -3.0% | $70,353 | 11+$258,238 | 3-$612,957 |
| 5 | STRUCTURAL INTEGRITY GROUP LLC | $1,073,202 | +39.4% | 3.9% | $38,581 | 8+$222,726 | 5-$489,022 |
| 6 | RESTEK, INC. | $1,111,783 | +44.4% | 7.6% | $1,628 | ||
| 7 | SCR CIVIL CONSTRUCTION, LLC | $1,113,411 | +44.6% | 7.7% | $3,379 | ||
| 8 | BECK-REIT & SONS, LTD. | $1,116,790 | +45.1% | 8.1% | $67,440 | ||
| 9 | BLACKSMITH VENTURES LLC | $1,184,230 | +53.8% | 14.6% | $174 | ||
| 10 | ROAD DOCTORS LLC | $1,184,404 | +53.8% | 14.6% | $54,564 | ||
| 11 | PREMIER CONTRACTORS LLC | $1,238,968 | +60.9% | 19.9% | $4,616 | ||
| 12 | MPB, INC. | $1,243,584 | +61.5% | 20.3% | $179,279 | ||
| 13 | MYERS CONCRETE CONSTRUCTION, LP | $1,422,863 | +84.8% | 37.7% |
Loaded: priced 1.75x or more over the statewide average low bid. Cut: half of it or less. Only items worth at least $2,500 or 0.5% of the bid count. Checked for the top 5 bidders.
Where the job was won
BK FIELD OPERATIONS LLC vs TAYLOR BRIDGE LLC, biggest item swings| Item | Qty | Low | 2nd | Market | 2nd minus low |
|---|---|---|---|---|---|
| 460-7014 CMP (GAL STL 72 IN) | 260 LF | $600.00 | $770.00 | $600.00 | $44,200 |
| 735-7060 DRIFTWOOD REMOVAL | 85 CY | $60.00 | $500.00 | $72.46 | $37,400 |
| 446-7020 CLEAN AND PAINT EXIST STR (REF NO. 1) | 1 EA | $111,000.00 | $75,000.00 | $28,146.70 | -$36,000 |
| 500-7001 MOBILIZATION | 1 LS | $80,000.00 | $50,000.00 | $523,850.32 | -$30,000 |
| 480-7002 CLEAN EXIST CULVERTS | 175 CY | $125.00 | $250.00 | $42.86 | $21,875 |
| 785-7004 BRIDGE JOINT REPAIR (ARMOR) | 79 LF | $475.00 | $300.00 | $334.68 | -$13,825 |
| 429-7007 CONC STR REPAIR (VERTICAL & OVERHEAD) | 125 SF | $200.00 | $300.00 | $150.68 | $12,500 |
| 785-7002 BRIDGE JOINT REPAIR (HEADER) | 116 LF | $300.00 | $400.00 | $199.12 | $11,600 |
| 503-7001 PORTABLE CHANGEABLE MESSAGE SIGN | 33 DAY | $100.00 | $300.00 | $87.82 | $6,600 |
| 401-7001 FLOWABLE BACKFILL | 14 CY | $800.00 | $400.00 | $298.77 | -$5,600 |
| 784-7002 REP STL BRIDGE MEMBER (BEAM) | 1 EA | $6,000.00 | $500.00 | $9,648.10 | -$5,500 |
| 432-7045 RIPRAP (STONE PROTECTION)(24 IN) | 356 CY | $185.00 | $200.00 | $190.61 | $5,340 |
| 734-7002 LITTER REMOVAL | 10 CYC | $1.00 | $500.00 | $1,937.87 | $4,990 |
| 459-7009 GABION MATTRESSES (GALV) (24 IN) | 90 SY | $300.00 | $250.00 | $275.94 | -$4,500 |
| 432-7043 RIPRAP (STONE PROTECTION)(18 IN) | 265 CY | $185.00 | $200.00 | $184.74 | $3,975 |
| 432-7001 RIPRAP (CONC)(4 IN) | 3 CY | $2,000.00 | $700.00 | $573.24 | -$3,900 |
| 778-7002 CONCRETE RAIL REPAIR (MISC) | 30 LF | $250.00 | $120.00 | $113.22 | -$3,900 |
| 451-7052 RETROFIT RAIL (ADD HSS) | 348 LF | $130.00 | $120.00 | $125.03 | -$3,480 |
| 429-7001 CONC STR REPAIR(CLEAN & COAT WTH EPOXY) | 30 SF | $75.00 | $175.00 | $120.92 | $3,000 |
| 429-7002 CONC STR REPAIR (EPOXY MORTAR) | 48 SF | $120.00 | $175.00 | $151.82 | $2,640 |
Positive: the low bidder was cheaper on that item. These 20 items account for $47,415 of the $51,014 gap.
BK FIELD OPERATIONS LLC: unbalanced items
Placed 1| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 446-7020 CLEAN AND PAINT EXIST STR (REF NO. 1) | 1 EA | $111,000.00 | $28,146.70 | 3.94x | $82,853 |
| 438-7001 CLEANING AND SEALING EXISTING JOINTS | 494 LF | $80.00 | $15.92 | 5.03x | $31,657 |
| 480-7002 CLEAN EXIST CULVERTS | 175 CY | $125.00 | $42.86 | 2.92x | $14,375 |
| 401-7001 FLOWABLE BACKFILL | 14 CY | $800.00 | $298.77 | 2.68x | $7,017 |
| 764-7001 DRAIN INLET CLEANING | 5 EA | $1,200.00 | $124.25 | 9.66x | $5,379 |
| 432-7001 RIPRAP (CONC)(4 IN) | 3 CY | $2,000.00 | $573.24 | 3.49x | $4,280 |
| 778-7002 CONCRETE RAIL REPAIR (MISC) | 30 LF | $250.00 | $113.22 | 2.21x | $4,103 |
| 500-7001 MOBILIZATION | 1 LS | $80,000.00 | $523,850.32 | 0.15x | -$443,850 |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 12 MO | $1.00 | $11,585.04 | 0.00x | -$139,009 |
| 505-7001 TMA (STATIONARY) | 100 DAY | $1.00 | $217.57 | 0.00x | -$21,657 |
| 734-7002 LITTER REMOVAL | 10 CYC | $1.00 | $1,937.87 | 0.00x | -$19,369 |
TAYLOR BRIDGE LLC: unbalanced items
Placed 2| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 446-7020 CLEAN AND PAINT EXIST STR (REF NO. 1) | 1 EA | $75,000.00 | $28,146.70 | 2.66x | $46,853 |
| 735-7060 DRIFTWOOD REMOVAL | 85 CY | $500.00 | $72.46 | 6.90x | $36,341 |
| 480-7002 CLEAN EXIST CULVERTS | 175 CY | $250.00 | $42.86 | 5.83x | $36,250 |
| 438-7001 CLEANING AND SEALING EXISTING JOINTS | 494 LF | $80.00 | $15.92 | 5.03x | $31,657 |
| 785-7002 BRIDGE JOINT REPAIR (HEADER) | 116 LF | $400.00 | $199.12 | 2.01x | $23,303 |
| 429-7007 CONC STR REPAIR (VERTICAL & OVERHEAD) | 125 SF | $300.00 | $150.68 | 1.99x | $18,665 |
| 503-7001 PORTABLE CHANGEABLE MESSAGE SIGN | 33 DAY | $300.00 | $87.82 | 3.42x | $7,002 |
| 764-7001 DRAIN INLET CLEANING | 5 EA | $1,000.00 | $124.25 | 8.05x | $4,379 |
| 500-7001 MOBILIZATION | 1 LS | $50,000.00 | $523,850.32 | 0.10x | -$473,850 |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 12 MO | $1.00 | $11,585.04 | 0.00x | -$139,009 |
| 505-7001 TMA (STATIONARY) | 100 DAY | $1.00 | $217.57 | 0.00x | -$21,657 |
| 734-7002 LITTER REMOVAL | 10 CYC | $500.00 | $1,937.87 | 0.26x | -$14,379 |
| 784-7002 REP STL BRIDGE MEMBER (BEAM) | 1 EA | $500.00 | $9,648.10 | 0.05x | -$9,148 |
GARRET SHIELDS INFRASTRUCTURE: unbalanced items
Placed 3| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 446-7020 CLEAN AND PAINT EXIST STR (REF NO. 1) | 1 EA | $110,000.00 | $28,146.70 | 3.91x | $81,853 |
| 480-7002 CLEAN EXIST CULVERTS | 175 CY | $120.00 | $42.86 | 2.80x | $13,500 |
| 438-7001 CLEANING AND SEALING EXISTING JOINTS | 494 LF | $40.00 | $15.92 | 2.51x | $11,897 |
| 778-7002 CONCRETE RAIL REPAIR (MISC) | 30 LF | $400.00 | $113.22 | 3.53x | $8,603 |
| 500-7001 MOBILIZATION | 1 LS | $100,000.00 | $523,850.32 | 0.19x | -$423,850 |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 12 MO | $5,000.00 | $11,585.04 | 0.43x | -$79,021 |
ICOS MANAGEMENT, LLC: unbalanced items
Placed 4| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 446-7020 CLEAN AND PAINT EXIST STR (REF NO. 1) | 1 EA | $107,000.00 | $28,146.70 | 3.80x | $78,853 |
| 480-7002 CLEAN EXIST CULVERTS | 175 CY | $321.00 | $42.86 | 7.49x | $48,675 |
| 785-7004 BRIDGE JOINT REPAIR (ARMOR) | 79 LF | $642.00 | $334.68 | 1.92x | $24,278 |
| 438-7001 CLEANING AND SEALING EXISTING JOINTS | 494 LF | $64.00 | $15.92 | 4.02x | $23,753 |
| 764-7001 DRAIN INLET CLEANING | 5 EA | $4,280.00 | $124.25 | 34.45x | $20,779 |
| 778-7002 CONCRETE RAIL REPAIR (MISC) | 30 LF | $642.00 | $113.22 | 5.67x | $15,863 |
| 735-7060 DRIFTWOOD REMOVAL | 85 CY | $214.00 | $72.46 | 2.95x | $12,031 |
| 7001-7003 BRIDGE BEAM END CLEANING | 2 EA | $5,350.00 | $95.20 | 56.20x | $10,510 |
| 7001-7002 BENT CAP/ABUTMENT CAP CLEANING | 2 EA | $5,350.00 | $475.41 | 11.25x | $9,749 |
| 401-7001 FLOWABLE BACKFILL | 14 CY | $856.00 | $298.77 | 2.87x | $7,801 |
| 500-7001 MOBILIZATION | 1 LS | $65,000.00 | $523,850.32 | 0.12x | -$458,850 |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 12 MO | $1.00 | $11,585.04 | 0.00x | -$139,009 |
| 734-7002 LITTER REMOVAL | 10 CYC | $428.00 | $1,937.87 | 0.22x | -$15,099 |
STRUCTURAL INTEGRITY GROUP LLC: unbalanced items
Placed 5| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 446-7020 CLEAN AND PAINT EXIST STR (REF NO. 1) | 1 EA | $92,500.00 | $28,146.70 | 3.29x | $64,353 |
| 480-7002 CLEAN EXIST CULVERTS | 175 CY | $230.00 | $42.86 | 5.37x | $32,750 |
| 785-7004 BRIDGE JOINT REPAIR (ARMOR) | 79 LF | $730.00 | $334.68 | 2.18x | $31,230 |
| 735-7060 DRIFTWOOD REMOVAL | 85 CY | $400.00 | $72.46 | 5.52x | $27,841 |
| 429-7007 CONC STR REPAIR (VERTICAL & OVERHEAD) | 125 SF | $308.00 | $150.68 | 2.04x | $19,665 |
| 401-7001 FLOWABLE BACKFILL | 14 CY | $1,650.00 | $298.77 | 5.52x | $18,917 |
| 438-7001 CLEANING AND SEALING EXISTING JOINTS | 494 LF | $45.00 | $15.92 | 2.83x | $14,367 |
| 503-7001 PORTABLE CHANGEABLE MESSAGE SIGN | 33 DAY | $500.00 | $87.82 | 5.69x | $13,602 |
| 500-7001 MOBILIZATION | 1 LS | $100,000.00 | $523,850.32 | 0.19x | -$423,850 |
| 505-7001 TMA (STATIONARY) | 100 DAY | $1.00 | $217.57 | 0.00x | -$21,657 |
| 788-7001 CONCRETE BEAM REPAIR | 4 EA | $1.00 | $4,623.25 | 0.00x | -$18,489 |
| 734-7002 LITTER REMOVAL | 10 CYC | $400.00 | $1,937.87 | 0.21x | -$15,379 |
| 784-7002 REP STL BRIDGE MEMBER (BEAM) | 1 EA | $1.00 | $9,648.10 | 0.00x | -$9,647 |