US90 MILL & FILL (S JEFF D CL | SH17)
0020-07-032 · let Mar 4, 2026 · Presidio, El Paso · Restoration
$4,176,256Low bid: ELITE KINGS CONSTRUCTION, LLC-13.1% vs estimate $4,806,126
$73,571Left on the table1.8% gap to the second bid
3BiddersSpread 12% low to high
29Items comparedAgainst statewide low-bid averages
The bids
| # | Bidder | Total | vs low | vs estimate | Gap to next | Loaded items | Cut items |
|---|---|---|---|---|---|---|---|
| 1 | ELITE KINGS CONSTRUCTION, LLC | $4,176,256 | -13.1% | $73,571 | 3+$927,158 | 1-$274,850 | |
| 2 | REECE ALBERT, INC. | $4,249,827 | +1.8% | -11.6% | $417,525 | 2+$165,346 | 1-$264,355 |
| 3 | DAN WILLIAMS COMPANY | $4,667,352 | +11.8% | -2.9% | 1+$868,686 | 1-$388,850 |
Loaded: priced 1.75x or more over the statewide average low bid. Cut: half of it or less. Only items worth at least $2,500 or 0.5% of the bid count. Checked for the top 3 bidders.
Where the job was won
ELITE KINGS CONSTRUCTION, LLC vs REECE ALBERT, INC., biggest item swings| Item | Qty | Low | 2nd | Market | 2nd minus low |
|---|---|---|---|---|---|
| 351-7005 FLEXIBLE PAVEMENT STRUCTURE REPAIR(6") | 21,221 SY | $89.00 | $78.15 | $49.06 | -$230,248 |
| 341-7023 D-GR HMA TY-C SAC-A PG70-22 | 8,950 TON | $175.00 | $196.93 | $143.32 | $196,274 |
| 354-7052 PLANE ASPH CONC PAV(3") | 48,048 SY | $5.00 | $5.79 | $2.92 | $37,958 |
| 315-7006 FOG SEAL (SS-1H OR CSS-1H) | 7,392 GAL | $10.00 | $5.06 | $2.38 | -$36,516 |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 2 MO | $1,500.00 | $19,222.92 | $11,585.04 | $35,446 |
| 3005-7001 MEMBRANE UNDERSEAL | 9,610 GAL | $4.00 | $7.21 | $4.76 | $30,848 |
| 644-7001 IN SM RD SN SUP&AM TY10BWG(1)SA(P) | 12 EA | $100.00 | $1,655.00 | $696.14 | $18,660 |
| 510-7002 ONE-WAY TRAF CONT (PILOT CAR) | 180 HR | $200.00 | $131.78 | $98.78 | -$12,280 |
| 500-7001 MOBILIZATION | 1 LS | $249,000.00 | $259,495.34 | $523,850.32 | $10,495 |
| 666-7410 REFL PAV MRK TY I (W)6"(SLD)(090MIL) | 45,672 LF | $1.00 | $1.09 | $0.4886 | $4,110 |
| 662-7114 WK ZN PAV MRK SHT TERM (TAB)TY Y-2 | 2,505 EA | $1.00 | $2.53 | $0.5715 | $3,833 |
| 479-7001 ADJUSTING MANHOLES | 1 EA | $500.00 | $3,718.73 | $1,510.21 | $3,219 |
| 505-7003 TMA (MOBILE OPERATION) | 3 DAY | $200.00 | $1,194.82 | $229.60 | $2,984 |
| 672-7004 REFL PAV MRKR TY II-A-A | 280 EA | $1.00 | $11.03 | $3.97 | $2,808 |
| 666-7035 REFL PAV MRK TY I (W)24"(SLD)(090MIL) | 182 LF | $1.00 | $15.94 | $7.10 | $2,719 |
| 505-7001 TMA (STATIONARY) | 32 DAY | $200.00 | $268.82 | $217.57 | $2,202 |
| 506-7041 TEMP SEDMT CONT FENCE (REMOVE) | 500 LF | $5.00 | $1.82 | $1.02 | -$1,590 |
| 666-7422 REFL PAV MRK TY I (Y)6"(SLD)(090MIL) | 5,842 LF | $1.00 | $1.15 | $0.5014 | $876 |
| 666-7419 REFL PAV MRK TY I (Y)6"(BRK)(090MIL) | 5,709 LF | $1.00 | $1.15 | $0.5412 | $856 |
| 503-7001 PORTABLE CHANGEABLE MESSAGE SIGN | 14 DAY | $150.00 | $92.68 | $87.82 | -$802 |
Positive: the low bidder was cheaper on that item. These 20 items account for $71,853 of the $73,571 gap.
ELITE KINGS CONSTRUCTION, LLC: unbalanced items
Placed 1| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 351-7005 FLEXIBLE PAVEMENT STRUCTURE REPAIR(6") | 21,221 SY | $89.00 | $49.06 | 1.81x | $847,465 |
| 315-7006 FOG SEAL (SS-1H OR CSS-1H) | 7,392 GAL | $10.00 | $2.38 | 4.20x | $56,337 |
| 666-7410 REFL PAV MRK TY I (W)6"(SLD)(090MIL) | 45,672 LF | $1.00 | $0.4886 | 2.05x | $23,357 |
| 500-7001 MOBILIZATION | 1 LS | $249,000.00 | $523,850.32 | 0.48x | -$274,850 |