US 67 AT LAKE RIDGE PKWY.
0261-01-041 · let Mar 4, 2026 · Ellis, Dallas · Interchange (New or Reconstructed)
$63,703,074Low bid: HIGHWAY 19 CONSTRUCTION LLC-0.1% vs estimate $63,765,204
$1,055,934Left on the table1.7% gap to the second bid
9BiddersSpread 35% low to high
425Items comparedAgainst statewide low-bid averages
The bids
| # | Bidder | Total | vs low | vs estimate | Gap to next | Loaded items | Cut items |
|---|---|---|---|---|---|---|---|
| 1 | HIGHWAY 19 CONSTRUCTION LLC | $63,703,074 | -0.1% | $1,055,934 | 3+$7,387,983 | 3-$2,603,095 | |
| 2 | RPM XCONSTRUCTION, LLC | $64,759,007 | +1.7% | 1.6% | $1,579,008 | 1+$5,876,150 | 2-$1,312,493 |
| 3 | HARPER BROTHERS CONSTRUCTION LLC | $66,338,016 | +4.1% | 4.0% | $1,102,030 | 2+$4,114,303 | 1-$1,123,405 |
| 4 | WEBBER, LLC | $67,440,046 | +5.9% | 5.8% | $1,419,591 | 4+$12,115,661 | 2-$862,424 |
| 5 | GRANITE CONSTRUCTION COMPANY | $68,859,637 | +8.1% | 8.0% | $4,500,668 | 3+$11,681,194 | 2-$1,176,409 |
| 6 | MARIO SINACOLA & SONS EXCAVATING, INC. | $73,360,305 | +15.2% | 15.0% | $500,770 | ||
| 7 | ZACHRY CONSTRUCTION CORPORATION | $73,861,075 | +15.9% | 15.8% | $1,128,310 | ||
| 8 | SEMA CONSTRUCTION, INC. | $74,989,385 | +17.7% | 17.6% | $11,109,885 | ||
| 9 | AUSTIN BRIDGE & ROAD SERVICES, LP | $86,099,270 | +35.2% | 35.0% |
Loaded: priced 1.75x or more over the statewide average low bid. Cut: half of it or less. Only items worth at least $2,500 or 0.5% of the bid count. Checked for the top 5 bidders.
Where the job was won
HIGHWAY 19 CONSTRUCTION LLC vs RPM XCONSTRUCTION, LLC, biggest item swings| Item | Qty | Low | 2nd | Market | 2nd minus low |
|---|---|---|---|---|---|
| 132-7008 EMBANK (FNL)(DC)(TY C1) | 341,039.83 CY | $11.00 | $19.50 | $17.39 | $2,898,839 |
| 360-7007 CONC PVMT (CRCP) (13") | 77,416 SY | $104.00 | $87.00 | $97.71 | -$1,316,072 |
| 403-7001 TEMPORARY SPL SHORING | 41,080 SF | $55.00 | $28.00 | $25.56 | -$1,109,160 |
| 100-7002 PREPARING ROW | 125 STA | $300.00 | $9,000.00 | $6,072.92 | $1,087,500 |
| 360-7005 CONC PVMT (CRCP) (11") | 89,247 SY | $95.00 | $85.00 | $94.72 | -$892,470 |
| 104-7001 REMOV CONC (PAV) | 59,167 SY | $13.00 | $2.50 | $11.85 | -$621,254 |
| 512-7005 PORT CTB (FUR & INST)(F-SHAPE)(TY 1) | 18,316 LF | $79.00 | $49.00 | $40.65 | -$549,480 |
| 476-7023 JACK BOR OR TUN PIPE(36 IN)(RC)(CL IV) | 466 LF | $350.00 | $1,445.00 | $852.92 | $510,270 |
| 422-7002 REINF CONC SLAB (HPC) | 55,308 SF | $19.00 | $28.00 | $26.91 | $497,772 |
| 423-7001 RETAINING WALL (MSE) | 45,663 SF | $80.00 | $71.00 | $74.07 | -$410,967 |
| 260-7008 LIME TRT (EXIST MATL)(10") | 97,228 SY | $7.00 | $2.80 | $5.92 | -$408,358 |
| 500-7001 MOBILIZATION | 1 LS | $6,000,000.00 | $6,400,000.00 | $523,850.32 | $400,000 |
| 110-7001 EXCAV (ROADWAY) | 168,119.08 CY | $4.52 | $6.80 | $11.68 | $383,312 |
| 512-7053 PORT CTB (REMOVE)(F-SHAPE)(TY 1) | 18,316 LF | $25.00 | $4.80 | $13.39 | -$369,983 |
| 260-7009 LIME TRT (EXIST MATL)(12") | 87,218 SY | $7.00 | $3.20 | $3.88 | -$331,428 |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 32 MO | $5,000.00 | $15,000.00 | $11,585.04 | $320,000 |
| 508-7001 CONSTRUCTING DETOURS | 23,650 SY | $75.00 | $88.00 | $83.58 | $307,450 |
| 533-7007 FILL MILLED CONCR RUMBLE STRIPS (SHLDR) | 23,539 LF | $1.00 | $14.00 | $6.86 | $306,007 |
| 423-7029 RETAINING WALL (SPECIAL) | 4,586 SF | $92.00 | $157.00 | $142.60 | $298,090 |
| 132-7010 EMBANK (FNL)(DC)(TY C2) | 18,515.52 CY | $11.00 | $27.00 | $22.38 | $296,248 |
Positive: the low bidder was cheaper on that item. These 20 items account for $1,296,316 of the $1,055,934 gap.
HIGHWAY 19 CONSTRUCTION LLC: unbalanced items
Placed 1| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 500-7001 MOBILIZATION | 1 LS | $6,000,000.00 | $523,850.32 | 11.45x | $5,476,150 |
| 403-7001 TEMPORARY SPL SHORING | 41,080 SF | $55.00 | $25.56 | 2.15x | $1,209,371 |
| 512-7005 PORT CTB (FUR & INST)(F-SHAPE)(TY 1) | 18,316 LF | $79.00 | $40.65 | 1.94x | $702,463 |
| 110-7001 EXCAV (ROADWAY) | 168,119.08 CY | $4.52 | $11.68 | 0.39x | -$1,204,102 |
| 100-7002 PREPARING ROW | 125 STA | $300.00 | $6,072.92 | 0.05x | -$721,615 |
| 168-7001 VEGETATIVE WATERING | 91,122.55 TGL | $1.00 | $8.43 | 0.12x | -$677,378 |
RPM XCONSTRUCTION, LLC: unbalanced items
Placed 2HARPER BROTHERS CONSTRUCTION LLC: unbalanced items
Placed 3WEBBER, LLC: unbalanced items
Placed 4| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 500-7001 MOBILIZATION | 1 LS | $6,744,000.00 | $523,850.32 | 12.87x | $6,220,150 |
| 100-7002 PREPARING ROW | 125 STA | $27,609.00 | $6,072.92 | 4.55x | $2,692,010 |
| 132-7010 EMBANK (FNL)(DC)(TY C2) | 18,515.52 CY | $149.00 | $22.38 | 6.66x | $2,344,463 |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 32 MO | $38,430.00 | $11,585.04 | 3.32x | $859,039 |
| 423-7029 RETAINING WALL (SPECIAL) | 4,586 SF | $41.00 | $142.60 | 0.29x | -$465,927 |
| 512-7005 PORT CTB (FUR & INST)(F-SHAPE)(TY 1) | 18,316 LF | $19.00 | $40.65 | 0.47x | -$396,497 |
GRANITE CONSTRUCTION COMPANY: unbalanced items
Placed 5| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 500-7001 MOBILIZATION | 1 LS | $6,000,000.00 | $523,850.32 | 11.45x | $5,476,150 |
| 100-7002 PREPARING ROW | 125 STA | $49,400.00 | $6,072.92 | 8.13x | $5,415,885 |
| 132-7010 EMBANK (FNL)(DC)(TY C2) | 18,515.52 CY | $65.00 | $22.38 | 2.90x | $789,159 |
| 168-7001 VEGETATIVE WATERING | 91,122.55 TGL | $0.1000 | $8.43 | 0.01x | -$759,388 |
| 104-7001 REMOV CONC (PAV) | 59,167 SY | $4.80 | $11.85 | 0.41x | -$417,021 |