FY 2027 Guardrail
0902-00-368 · let Sep 2, 2026 · Parker, Fort Worth · Safety Improvement Projects
$3,643,031Low bid: ODUM SERVICES, LLC-26.8% vs estimate $4,975,541
$163,201Left on the table4.5% gap to the second bid
11BiddersSpread 61% low to high
29Items comparedAgainst statewide low-bid averages
The bids
| # | Bidder | Total | vs low | vs estimate | Gap to next | Loaded items | Cut items |
|---|---|---|---|---|---|---|---|
| 1 | ODUM SERVICES, LLC | $3,643,031 | -26.8% | $163,201 | 1+$31,293 | 2-$542,381 | |
| 2 | 3LW CIVIL LLC | $3,806,232 | +4.5% | -23.5% | $531,801 | 3+$84,538 | 7-$1,017,690 |
| 3 | GARRET SHIELDS INFRASTRUCTURE | $4,338,033 | +19.1% | -12.8% | $9,466 | 2+$79,170 | 2-$192,554 |
| 4 | T&L CLEANING SERVICES LLC | $4,347,498 | +19.3% | -12.6% | $9,291 | 1+$42,719 | 1-$74,024 |
| 5 | HJC FARMS, INC. | $4,356,790 | +19.6% | -12.4% | $121,368 | 0 | 4-$298,616 |
| 6 | DIGG COMMERCIAL, LLC | $4,478,158 | +22.9% | -10.0% | $119,979 | ||
| 7 | SHORT-LINE, LLC | $4,598,137 | +26.2% | -7.6% | $27,385 | ||
| 8 | ICOS MANAGEMENT, LLC | $4,625,522 | +27.0% | -7.0% | $185,773 | ||
| 9 | ALTUS CONSTRUCTION LLC | $4,811,296 | +32.1% | -3.3% | $450,457 | ||
| 10 | ROADWAY SPECIALTIES, INC. | $5,261,753 | +44.4% | 5.8% | $610,677 | ||
| 11 | RAGLE CONSTRUCTION, INC. | $5,872,430 | +61.2% | 18.0% |
Loaded: priced 1.75x or more over the statewide average low bid. Cut: half of it or less. Only items worth at least $2,500 or 0.5% of the bid count. Checked for the top 5 bidders.
Where the job was won
ODUM SERVICES, LLC vs 3LW CIVIL LLC, biggest item swings| Item | Qty | Low | 2nd | Market | 2nd minus low |
|---|---|---|---|---|---|
| 432-7013 RIPRAP (MOW STRIP)(4 IN) | 2,309.1 CY | $585.00 | $917.27 | $616.83 | $767,245 |
| 540-7001 MTL W-BEAM GD FEN (TIM POST) | 38,705 LF | $22.50 | $16.00 | $25.60 | -$251,583 |
| 506-7039 TEMP SEDMT CONT FENCE (INSTALL) | 36,419 LF | $3.50 | $0.1000 | $3.92 | -$123,825 |
| 505-7001 TMA (STATIONARY) | 346 DAY | $250.00 | $0.1000 | $217.57 | -$86,465 |
| 542-7001 REMOVE METAL BEAM GUARD FENCE | 40,162.5 LF | $2.00 | $0.1000 | $2.84 | -$76,309 |
| 500-7001 MOBILIZATION | 1 LS | $100,000.00 | $54,000.00 | $523,850.32 | -$46,000 |
| 503-7002 PORTABLE CHANGEABLE MESSAGE SIGN | 4 EA | $10,000.00 | $0.1000 | $9,253.78 | -$40,000 |
| 540-7005 MTL BEAM GD FEN TRANS (THRIE-BEAM) | 73 EA | $1,700.00 | $2,210.00 | $2,218.70 | $37,230 |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 18 MO | $5,000.00 | $3,087.53 | $11,585.04 | -$34,424 |
| 506-7041 TEMP SEDMT CONT FENCE (REMOVE) | 36,419 LF | $1.00 | $0.1000 | $1.02 | -$32,777 |
| 132-7003 EMBANK (FNL)(OC)(TY B) | 259 CY | $35.00 | $133.59 | $16.96 | $25,535 |
| 104-7005 REMOV CONC (MOWSTRIP) | 1,050 LF | $10.00 | $30.00 | $9.49 | $21,000 |
| 542-7003 REMOVE DOWNSTREAM ANCHOR TERMINAL | 153 EA | $150.00 | $255.33 | $216.49 | $16,115 |
| 162-7002 BLOCK SODDING | 1,869 SY | $8.00 | $0.1000 | $4.39 | -$14,765 |
| 544-7001 GUARDRAIL END TREATMENT (INSTALL) | 139 EA | $2,875.00 | $2,965.00 | $3,190.07 | $12,510 |
| 168-7001 VEGETATIVE WATERING | 223 TGL | $50.00 | $0.1000 | $8.43 | -$11,128 |
| 540-7029 MTL BM GD FEN TRANS (ANCHOR PLATE) | 65 EA | $650.00 | $768.24 | $757.97 | $7,686 |
| 542-7004 RM MTL BM GD FENCE TRANS (THRIE-BEAM) | 52 EA | $150.00 | $273.10 | $284.77 | $6,401 |
| 540-7015 DOWNSTREAM ANCHOR TERMINAL SECTION | 54 EA | $1,525.00 | $1,430.86 | $1,297.32 | -$5,084 |
| 164-7004 BROADCAST SEED (PERM_URBAN_CLAY) | 3,588 SY | $1.50 | $0.1000 | $0.5051 | -$5,023 |
Positive: the low bidder was cheaper on that item. These 20 items account for $166,340 of the $163,201 gap.
ODUM SERVICES, LLC: unbalanced items
Placed 13LW CIVIL LLC: unbalanced items
Placed 2| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 540-7039 TL-3 31" SHORT RADIUS (COMPLETE) | 3 EA | $24,000.00 | $13,068.91 | 1.84x | $32,793 |
| 132-7003 EMBANK (FNL)(OC)(TY B) | 259 CY | $133.59 | $16.96 | 7.88x | $30,206 |
| 104-7005 REMOV CONC (MOWSTRIP) | 1,050 LF | $30.00 | $9.49 | 3.16x | $21,538 |
| 500-7001 MOBILIZATION | 1 LS | $54,000.00 | $523,850.32 | 0.10x | -$469,850 |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 18 MO | $3,087.53 | $11,585.04 | 0.27x | -$152,955 |
| 506-7039 TEMP SEDMT CONT FENCE (INSTALL) | 36,419 LF | $0.1000 | $3.92 | 0.03x | -$138,971 |
| 542-7001 REMOVE METAL BEAM GUARD FENCE | 40,162.5 LF | $0.1000 | $2.84 | 0.04x | -$110,170 |
| 505-7001 TMA (STATIONARY) | 346 DAY | $0.1000 | $217.57 | 0.00x | -$75,245 |
| 503-7002 PORTABLE CHANGEABLE MESSAGE SIGN | 4 EA | $0.1000 | $9,253.78 | 0.00x | -$37,015 |
| 506-7041 TEMP SEDMT CONT FENCE (REMOVE) | 36,419 LF | $0.1000 | $1.02 | 0.10x | -$33,484 |
GARRET SHIELDS INFRASTRUCTURE: unbalanced items
Placed 3| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 542-7003 REMOVE DOWNSTREAM ANCHOR TERMINAL | 153 EA | $500.00 | $216.49 | 2.31x | $43,377 |
| 540-7039 TL-3 31" SHORT RADIUS (COMPLETE) | 3 EA | $25,000.00 | $13,068.91 | 1.91x | $35,793 |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 18 MO | $5,000.00 | $11,585.04 | 0.43x | -$118,531 |
| 542-7001 REMOVE METAL BEAM GUARD FENCE | 40,162.5 LF | $1.00 | $2.84 | 0.35x | -$74,024 |
T&L CLEANING SERVICES LLC: unbalanced items
Placed 4HJC FARMS, INC.: unbalanced items
Placed 5| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 18 MO | $2,500.00 | $11,585.04 | 0.22x | -$163,531 |
| 540-7015 DOWNSTREAM ANCHOR TERMINAL SECTION | 54 EA | $17.50 | $1,297.32 | 0.01x | -$69,110 |
| 540-7039 TL-3 31" SHORT RADIUS (COMPLETE) | 3 EA | $1,000.00 | $13,068.91 | 0.08x | -$36,207 |
| 540-7029 MTL BM GD FEN TRANS (ANCHOR PLATE) | 65 EA | $300.00 | $757.97 | 0.40x | -$29,768 |