MBGF REPAIR KRAO FY '27
6503-06-001 · let Sep 9, 2026 · Kaufman, Dallas · Routine Maintenance Project - Sealed
$406,546Low bid: FIREMAN EXCAVATING, INC.-29.3% vs estimate $575,225
$123,955Left on the table30.5% gap to the second bid
3BiddersSpread 68% low to high
12Items comparedAgainst statewide low-bid averages
The bids
| # | Bidder | Total | vs low | vs estimate | Gap to next | Loaded items | Cut items |
|---|---|---|---|---|---|---|---|
| 1 | FIREMAN EXCAVATING, INC. | $406,546 | -29.3% | $123,955 | 0 | 3-$359,385 | |
| 2 | TEXWAY WASTEWATER SERVICES, LLC | $530,501 | +30.5% | -7.8% | $154,494 | 1+$4,651 | 2-$288,112 |
| 3 | JE CASEY, LLC | $684,995 | +68.5% | 19.1% | 1+$5,111 | 0 |
Loaded: priced 1.75x or more over the statewide average low bid. Cut: half of it or less. Only items worth at least $2,500 or 0.5% of the bid count. Checked for the top 3 bidders.
Where the job was won
FIREMAN EXCAVATING, INC. vs TEXWAY WASTEWATER SERVICES, LLC, biggest item swings| Item | Qty | Low | 2nd | Market | 2nd minus low |
|---|---|---|---|---|---|
| 770-7035 REPLACE W-BEAM RAIL | 5,100 LF | $10.00 | $30.00 | $24.10 | $102,000 |
| 770-7038 REPLACE CURVED RAIL | 825 LF | $20.00 | $40.00 | $26.19 | $16,500 |
| 770-7026 REPLACE DOWNSTREAM ANCHOR TERMINAL | 10 EA | $500.00 | $1,000.00 | $534.87 | $5,000 |
| 770-7036 REPLACE THRIE-BEAM RAIL | 50 LF | $20.00 | $80.00 | $48.04 | $3,000 |
| 658-7001 INSTL DEL ASSM (D-SW)SZ 1(WFLX)GF2 | 50 EA | $20.00 | $0.0010 | $29.24 | -$1,000 |
| 770-7041 REPLACE GDRL END TREATMENT MRKR | 25 EA | $50.00 | $20.00 | $29.93 | -$750 |
| 500-7002 MOBILIZATION (CALLOUT) | 385 EA | $1.00 | $0.0010 | $600.85 | -$385 |
| 505-7001 TMA (STATIONARY) | 261 DAY | $1.00 | $0.0010 | $217.57 | -$261 |
| 658-7002 INSTL DEL ASSM (D-SW)SZ 1(WFLX)GF2(BI) | 50 EA | $1.00 | $0.0010 | $27.13 | -$50 |
| 658-7021 INSTL DEL ASSM (D-SY)SZ 1(YFLX)GF2 | 50 EA | $1.00 | $0.0010 | $31.47 | -$50 |
| 658-7022 INSTL DEL ASSM (D-SY)SZ 1(YFLX)GF2(BI) | 50 EA | $1.00 | $0.0010 | $10.08 | -$50 |
| 770-7037 REPLACE GUARDRAIL END TREATMENT SYSTEM | 75 EA | $4,400.00 | $4,400.00 | $3,116.90 | $0 |
Positive: the low bidder was cheaper on that item. These 12 items account for $123,955 of the $123,955 gap.
FIREMAN EXCAVATING, INC.: unbalanced items
Placed 1TEXWAY WASTEWATER SERVICES, LLC: unbalanced items
Placed 2JE CASEY, LLC: unbalanced items
Placed 3| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 770-7026 REPLACE DOWNSTREAM ANCHOR TERMINAL | 10 EA | $1,046.00 | $534.87 | 1.96x | $5,111 |