Limestone Rock Asphalt 01 0926
6502-06-001 · let Sep 9, 2026 · Navarro, Dallas · Material Maintenance Project
$77,710Low bid: VULCAN CONSTRUCTION MATERIALS, LLC+11.0% vs estimate $70,000
$1,375Left on the table1.8% gap to the second bid
2BiddersSpread 2% low to high
2Items comparedAgainst statewide low-bid averages
The bids
| # | Bidder | Total | vs low | vs estimate | Gap to next | Loaded items | Cut items |
|---|---|---|---|---|---|---|---|
| 1 | VULCAN CONSTRUCTION MATERIALS, LLC | $77,710 | 11.0% | $1,375 | 0 | 0 | |
| 2 | MARTIN MARIETTA MATERIALS, INC. | $79,085 | +1.8% | 13.0% | 0 | 0 |
Loaded: priced 1.75x or more over the statewide average low bid. Cut: half of it or less. Only items worth at least $2,500 or 0.5% of the bid count. Checked for the top 2 bidders.
Where the job was won
VULCAN CONSTRUCTION MATERIALS, LLC vs MARTIN MARIETTA MATERIALS, INC., biggest item swings| Item | Qty | Low | 2nd | Market | 2nd minus low |
|---|---|---|---|---|---|
| 8001-7065 LRA (TY I GR CC) (DEL) (ST1) | 300 TON | $155.82 | $158.63 | $117.99 | $843 |
| 8001-7009 LRA (TY I GR AA) (DEL) (ST1) | 200 TON | $154.82 | $157.48 | $112.79 | $532 |
Positive: the low bidder was cheaper on that item. These 2 items account for $1,375 of the $1,375 gap.