ABILENE FY 2027 BPM
6492-74-001 · let Sep 22, 2026 · Taylor, Abilene · Bridge Preventative Maintenance
$685,424Low bid: BLACKSMITH VENTURES LLC-26.9% vs estimate $937,100
$46,669Left on the table6.8% gap to the second bid
12BiddersSpread 103% low to high
19Items comparedAgainst statewide low-bid averages
The bids
| # | Bidder | Total | vs low | vs estimate | Gap to next | Loaded items | Cut items |
|---|---|---|---|---|---|---|---|
| 1 | BLACKSMITH VENTURES LLC | $685,424 | -26.9% | $46,669 | 3+$14,191 | 4-$591,803 | |
| 2 | MACIAS SPECIALTY CONTRACTING LLC | $732,093 | +6.8% | -21.9% | $88,107 | 0 | 2-$494,276 |
| 3 | ROAD DOCTORS LLC | $820,200 | +19.7% | -12.5% | $21,949 | 5+$122,466 | 3-$500,000 |
| 4 | REAR CONTRACTORS LLC | $842,149 | +22.9% | -10.1% | $41,581 | 4+$102,966 | 3-$525,631 |
| 5 | GARRET SHIELDS INFRASTRUCTURE | $883,730 | +28.9% | -5.7% | $6,980 | 0 | 2-$486,776 |
| 6 | TI-ZACK CONCRETE, LLC | $890,710 | +30.0% | -5.0% | $10,925 | ||
| 7 | STRUCTURAL INTEGRITY GROUP LLC | $901,634 | +31.5% | -3.8% | $34,441 | ||
| 8 | SCOTT TUCKER CONSTRUCTION COMPANY, LLC | $936,075 | +36.6% | -0.1% | $13,407 | ||
| 9 | CROSS PLUS CONSTRUCTION, LLC | $949,482 | +38.5% | 1.3% | $64,006 | ||
| 10 | MPB, INC. | $1,013,487 | +47.9% | 8.2% | $100,992 | ||
| 11 | PREMIER CONTRACTORS LLC | $1,114,479 | +62.6% | 18.9% | $279,915 | ||
| 12 | THE TRUESDELL CORPORATION | $1,394,394 | +103.4% | 48.8% |
Loaded: priced 1.75x or more over the statewide average low bid. Cut: half of it or less. Only items worth at least $2,500 or 0.5% of the bid count. Checked for the top 5 bidders.
Where the job was won
BLACKSMITH VENTURES LLC vs MACIAS SPECIALTY CONTRACTING LLC, biggest item swings| Item | Qty | Low | 2nd | Market | 2nd minus low |
|---|---|---|---|---|---|
| 500-7001 MOBILIZATION | 1 LS | $1.00 | $70,000.00 | $523,850.32 | $69,999 |
| 429-7003 CONC STR REPAIR(DECK REP(PART DEPTH)) | 810 SF | $115.00 | $65.00 | $95.74 | -$40,500 |
| 429-7007 CONC STR REPAIR (VERTICAL & OVERHEAD) | 2,760 SF | $127.00 | $135.00 | $150.68 | $22,080 |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 5 MO | $1.00 | $3,500.00 | $11,585.04 | $17,495 |
| 432-7043 RIPRAP (STONE PROTECTION)(18 IN) | 531 CY | $208.00 | $180.00 | $184.74 | -$14,868 |
| 420-7064 CL C CONC (COLUMN ENCASEMENT) | 47 CY | $1,500.00 | $1,300.00 | $1,935.90 | -$9,400 |
| 780-7002 CNC CRACK REPAIR (DISCRETE)(INJECT) | 80 LF | $5.00 | $97.00 | $76.83 | $7,360 |
| 735-7060 DRIFTWOOD REMOVAL | 60 CY | $1.00 | $105.00 | $72.46 | $6,240 |
| 104-7027 REMOV CONC (COPING) | 20 LF | $300.00 | $58.00 | $8.54 | -$4,840 |
| 505-7001 TMA (STATIONARY) | 64 DAY | $235.00 | $310.00 | $217.57 | $4,800 |
| 401-7001 FLOWABLE BACKFILL | 10 CY | $750.00 | $325.00 | $298.77 | -$4,250 |
| 104-7026 REMOV CONC (MSE PANELS) | 35 SF | $145.00 | $33.00 | $35.02 | -$3,920 |
| 420-7143 CL C CONC (COPING) | 20 LF | $300.00 | $190.00 | $239.41 | -$2,200 |
| 438-7001 CLEANING AND SEALING EXISTING JOINTS | 40 LF | $25.00 | $60.00 | $15.92 | $1,400 |
| 432-7005 RIPRAP (CONC)(CL B) | 3 CY | $1,200.00 | $800.00 | $556.52 | -$1,200 |
| 423-7010 RETAINING WALL (EXISTING MSE) (FASCIA) | 35 SF | $145.00 | $115.00 | $145.00 | -$1,050 |
| 104-7007 REMOV CONC (RIPRAP) | 3 CY | $500.00 | $395.00 | $26.91 | -$315 |
| 438-7004 CLEANING AND SEALING EXIST JOINTS (CL3) | 54 LF | $25.00 | $22.00 | $19.19 | -$162 |
| 438-7007 CLEANING AND SEALING EXIST JOINTS (CL7) | 328 LF | $25.00 | $25.00 | $38.57 | $0 |
Positive: the low bidder was cheaper on that item. These 19 items account for $46,669 of the $46,669 gap.
BLACKSMITH VENTURES LLC: unbalanced items
Placed 1| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 104-7027 REMOV CONC (COPING) | 20 LF | $300.00 | $8.54 | 35.15x | $5,829 |
| 401-7001 FLOWABLE BACKFILL | 10 CY | $750.00 | $298.77 | 2.51x | $4,512 |
| 104-7026 REMOV CONC (MSE PANELS) | 35 SF | $145.00 | $35.02 | 4.14x | $3,849 |
| 500-7001 MOBILIZATION | 1 LS | $1.00 | $523,850.32 | 0.00x | -$523,849 |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 5 MO | $1.00 | $11,585.04 | 0.00x | -$57,920 |
| 780-7002 CNC CRACK REPAIR (DISCRETE)(INJECT) | 80 LF | $5.00 | $76.83 | 0.07x | -$5,746 |
| 735-7060 DRIFTWOOD REMOVAL | 60 CY | $1.00 | $72.46 | 0.01x | -$4,288 |
MACIAS SPECIALTY CONTRACTING LLC: unbalanced items
Placed 2ROAD DOCTORS LLC: unbalanced items
Placed 3| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 429-7003 CONC STR REPAIR(DECK REP(PART DEPTH)) | 810 SF | $200.00 | $95.74 | 2.09x | $84,448 |
| 438-7007 CLEANING AND SEALING EXIST JOINTS (CL7) | 328 LF | $100.00 | $38.57 | 2.59x | $20,149 |
| 735-7060 DRIFTWOOD REMOVAL | 60 CY | $200.00 | $72.46 | 2.76x | $7,652 |
| 780-7002 CNC CRACK REPAIR (DISCRETE)(INJECT) | 80 LF | $150.00 | $76.83 | 1.95x | $5,854 |
| 438-7004 CLEANING AND SEALING EXIST JOINTS (CL3) | 54 LF | $100.00 | $19.19 | 5.21x | $4,364 |
| 500-7001 MOBILIZATION | 1 LS | $80,000.00 | $523,850.32 | 0.15x | -$443,850 |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 5 MO | $2,500.00 | $11,585.04 | 0.22x | -$45,425 |
| 505-7001 TMA (STATIONARY) | 64 DAY | $50.00 | $217.57 | 0.23x | -$10,725 |
REAR CONTRACTORS LLC: unbalanced items
Placed 4| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 429-7003 CONC STR REPAIR(DECK REP(PART DEPTH)) | 810 SF | $200.00 | $95.74 | 2.09x | $84,448 |
| 423-7010 RETAINING WALL (EXISTING MSE) (FASCIA) | 35 SF | $350.00 | $145.00 | 2.41x | $7,175 |
| 401-7001 FLOWABLE BACKFILL | 10 CY | $1,000.00 | $298.77 | 3.35x | $7,012 |
| 432-7005 RIPRAP (CONC)(CL B) | 3 CY | $2,000.00 | $556.52 | 3.59x | $4,330 |
| 500-7001 MOBILIZATION | 1 LS | $70,000.00 | $523,850.32 | 0.13x | -$453,850 |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 5 MO | $1.00 | $11,585.04 | 0.00x | -$57,920 |
| 505-7001 TMA (STATIONARY) | 64 DAY | $1.00 | $217.57 | 0.00x | -$13,861 |