Debris Removal (North) FY 2027
6509-69-001 · let Oct 22, 2026 · Bowie, Atlanta · Routine Maintenance Project
$204,500Low bid: HOLMES AND HOLMES CONTRACTING-8.6% vs estimate $223,850
$98,500Left on the table48.2% gap to the second bid
3BiddersSpread 223% low to high
2Items comparedAgainst statewide low-bid averages
The bids
| # | Bidder | Total | vs low | vs estimate | Gap to next | Loaded items | Cut items |
|---|---|---|---|---|---|---|---|
| 1 | HOLMES AND HOLMES CONTRACTING | $204,500 | -8.6% | $98,500 | 0 | 1-$522,850 | |
| 2 | ADVANCED BARRICADES OF AMERICA, LLC | $303,000 | +48.2% | 35.4% | $358,464 | 1+$147,812 | 1-$516,850 |
| 3 | SWEEPING CORPORATION OF AMERICA, LLC | $661,464 | +223.5% | 195.5% | 1+$498,276 | 1-$508,850 |
Loaded: priced 1.75x or more over the statewide average low bid. Cut: half of it or less. Only items worth at least $2,500 or 0.5% of the bid count. Checked for the top 3 bidders.
Where the job was won
HOLMES AND HOLMES CONTRACTING vs ADVANCED BARRICADES OF AMERICA, LLC, biggest item swings| Item | Qty | Low | 2nd | Market | 2nd minus low |
|---|---|---|---|---|---|
| 735-7014 DEBRIS REMOVAL (CNTR MEDIANS/MAINLANES) | 74 CYC | $2,750.00 | $4,000.00 | $2,002.54 | $92,500 |
| 500-7001 MOBILIZATION | 1 LS | $1,000.00 | $7,000.00 | $523,850.32 | $6,000 |
Positive: the low bidder was cheaper on that item. These 2 items account for $98,500 of the $98,500 gap.
HOLMES AND HOLMES CONTRACTING: unbalanced items
Placed 1| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 500-7001 MOBILIZATION | 1 LS | $1,000.00 | $523,850.32 | 0.00x | -$522,850 |