FY '27 Palo Pinto MMC Flexible Base
6508-71-001 · let Oct 14, 2026 · Palo Pinto, Fort Worth · Material Maintenance Project
$101,350Low bid: GREEN DREAM INTERNATIONAL LLC-35.3% vs estimate $156,750
$18,875Left on the table18.6% gap to the second bid
4BiddersSpread 41% low to high
3Items comparedAgainst statewide low-bid averages
The bids
| # | Bidder | Total | vs low | vs estimate | Gap to next | Loaded items | Cut items |
|---|---|---|---|---|---|---|---|
| 1 | GREEN DREAM INTERNATIONAL LLC | $101,350 | -35.3% | $18,875 | 0 | 0 | |
| 2 | TRADERS INN LLC | $120,225 | +18.6% | -23.3% | $16,025 | 0 | 0 |
| 3 | TOUCHSTONE RESOURCES, LLC | $136,250 | +34.4% | -13.1% | $6,250 | 0 | 0 |
| 4 | NORTHEASTERN PAVERS, LLC | $142,500 | +40.6% | -9.1% | 0 | 0 |
Loaded: priced 1.75x or more over the statewide average low bid. Cut: half of it or less. Only items worth at least $2,500 or 0.5% of the bid count. Checked for the top 4 bidders.
Where the job was won
GREEN DREAM INTERNATIONAL LLC vs TRADERS INN LLC, biggest item swings| Item | Qty | Low | 2nd | Market | 2nd minus low |
|---|---|---|---|---|---|
| 8010-7059 FL BS(TY A GR 3)(DEL)(ST1) | 1,250 TON | $25.88 | $32.06 | $28.96 | $7,725 |
| 8010-7060 FL BS(TY A GR 3)(DEL)(ST2) | 1,250 TON | $26.45 | $32.06 | $28.57 | $7,013 |
| 8010-7061 FL BS(TY A GR 3)(DEL)(ST3) | 1,250 TON | $28.75 | $32.06 | $30.58 | $4,138 |
Positive: the low bidder was cheaper on that item. These 3 items account for $18,875 of the $18,875 gap.