Bid Tab X-ray: 6506-43-001

Oct 14, 2026 · Denton Sign up free
Set your company to personalize scores

04 Winter Weather Material - Brine 11/26

6506-43-001 · let Oct 14, 2026 · Denton, Dallas · Material Maintenance Project

$130,000Low bid: TOUCHSTONE RESOURCES, LLC+18.7% vs estimate $109,500
$6,024Left on the table4.6% gap to the second bid
2BiddersSpread 5% low to high
2Items comparedAgainst statewide low-bid averages

The bids

#BidderTotalvs lowvs estimateGap to nextLoaded itemsCut items
1TOUCHSTONE RESOURCES, LLC $130,00018.7% $6,024 0 0
2NSG LOGISTICS, LLC $136,024+4.6%24.2% 0 0

Loaded: priced 1.75x or more over the statewide average low bid. Cut: half of it or less. Only items worth at least $2,500 or 0.5% of the bid count. Checked for the top 2 bidders.

Where the job was won

TOUCHSTONE RESOURCES, LLC vs NSG LOGISTICS, LLC, biggest item swings
ItemQtyLow2ndMarket2nd minus low
8032-7458 CAT 8C-B BRINE SALT (DEL)(SITE 1)500 TON $200.00$209.02$165.45 $4,510
8032-7477 CAT 8C-B BRINE SALT (DEL)(SITE 1)(EXP)150 TON $200.00$210.09$155.21 $1,514

Positive: the low bidder was cheaper on that item. These 2 items account for $6,024 of the $6,024 gap.