Bid Tab X-ray: 6506-33-001

Oct 7, 2026 · Jasper Sign up free
Set your company to personalize scores

FY 27 Ditch Cleaning and Reshaping

6506-33-001 · let Oct 7, 2026 · Jasper, Beaumont · Routine Maintenance Project

$2,396,085Low bid: TEXAS DRAINAGE INC.-11.6% vs estimate $2,711,299
$1,090,515Left on the table45.5% gap to the second bid
2BiddersSpread 46% low to high
10Items comparedAgainst statewide low-bid averages

The bids

#BidderTotalvs lowvs estimateGap to nextLoaded itemsCut items
1TEXAS DRAINAGE INC. $2,396,085-11.6% $1,090,515 1+$264,558 2-$394,305
2GROD CONSTRUCTION LLC $3,486,600+45.5%28.6% 3+$299,120 0

Loaded: priced 1.75x or more over the statewide average low bid. Cut: half of it or less. Only items worth at least $2,500 or 0.5% of the bid count. Checked for the top 2 bidders.

Where the job was won

TEXAS DRAINAGE INC. vs GROD CONSTRUCTION LLC, biggest item swings
ItemQtyLow2ndMarket2nd minus low
760-7001 DITCH CLEANING AND RESHAPING (FOOT)1,000,000 LF $1.98$2.60$1.96 $620,000
480-7001 CLEAN EXIST CULVERTS200 EA $250.00$2,000.00$1,712.97 $350,000
505-7001 TMA (STATIONARY)490 DAY $10.00$450.00$217.57 $215,600
500-7002 MOBILIZATION (CALLOUT)49 EA $6,000.00$4,000.00$600.85 -$98,000
503-7001 PORTABLE CHANGEABLE MESSAGE SIGN88 DAY $100.00$300.00$87.82 $17,600
472-7004 REMOV & RE - LAY PIPE (18 IN)140 LF $99.99$60.00$59.22 -$5,599
472-7006 REMOV & RE - LAY PIPE (24 IN)140 LF $109.99$75.00$90.86 -$4,899
467-7308 SET (TY II) (18 IN) (RCP) (6: 1) (P)6 EA $1,999.00$1,300.00$1,176.76 -$4,194
467-7328 SET (TY II) (24 IN) (RCP) (6: 1) (P)6 EA $1,999.00$2,000.00$1,883.43 $6
496-7004 REMOV STR (SET)10 EA $500.00$500.00$514.07 $0

Positive: the low bidder was cheaper on that item. These 10 items account for $1,090,515 of the $1,090,515 gap.

TEXAS DRAINAGE INC.: unbalanced items

Placed 1
ItemQtyTheir priceMarketx market$ vs market
500-7002 MOBILIZATION (CALLOUT)49 EA $6,000.00$600.859.99x$264,558
480-7001 CLEAN EXIST CULVERTS200 EA $250.00$1,712.970.15x-$292,595
505-7001 TMA (STATIONARY)490 DAY $10.00$217.570.05x-$101,710

GROD CONSTRUCTION LLC: unbalanced items

Placed 2
ItemQtyTheir priceMarketx market$ vs market
500-7002 MOBILIZATION (CALLOUT)49 EA $4,000.00$600.856.66x$166,558
505-7001 TMA (STATIONARY)490 DAY $450.00$217.572.07x$113,890
503-7001 PORTABLE CHANGEABLE MESSAGE SIGN88 DAY $300.00$87.823.42x$18,672