Bid Tab X-ray: 6503-01-001

Oct 14, 2026 · Ellis Sign up free
Set your company to personalize scores

Limestone Rock Asphalt 09 1026

6503-01-001 · let Oct 14, 2026 · Ellis, Dallas · Material Maintenance Project

$197,064Low bid: VULCAN CONSTRUCTION MATERIALS, LLC+8.0% vs estimate $182,400
$11,034Left on the table5.6% gap to the second bid
2BiddersSpread 6% low to high
4Items comparedAgainst statewide low-bid averages

The bids

#BidderTotalvs lowvs estimateGap to nextLoaded itemsCut items
1VULCAN CONSTRUCTION MATERIALS, LLC $197,0648.0% $11,034 0 0
2MARTIN MARIETTA MATERIALS, INC. $208,098+5.6%14.1% 0 0

Loaded: priced 1.75x or more over the statewide average low bid. Cut: half of it or less. Only items worth at least $2,500 or 0.5% of the bid count. Checked for the top 2 bidders.

Where the job was won

VULCAN CONSTRUCTION MATERIALS, LLC vs MARTIN MARIETTA MATERIALS, INC., biggest item swings
ItemQtyLow2ndMarket2nd minus low
8001-7094 LRA (TY II GR CS) (DEL) (ST2)300 TON $165.68$175.38$127.06 $2,910
8001-7093 LRA (TY II GR CS) (DEL) (ST1)300 TON $163.76$173.45$104.61 $2,907
8001-7010 LRA (TY I GR AA) (DEL) (ST2)300 TON $164.68$173.38$124.75 $2,610
8001-7009 LRA (TY I GR AA) (DEL) (ST1)300 TON $162.76$171.45$112.79 $2,607

Positive: the low bidder was cheaper on that item. These 4 items account for $11,034 of the $11,034 gap.