FM 46 F: Falls C/L T: SH 14 - SC FY 27
0049-14-015 · let Oct 7, 2026 · Robertson, Bryan · Seal Coat
$19,126,405Low bid: CLARK CONSTRUCTION OF TEXAS, INC.+5.1% vs estimate $18,203,777
$1,289,164Left on the table6.7% gap to the second bid
4BiddersSpread 16% low to high
615Items comparedAgainst statewide low-bid averages
The bids
| # | Bidder | Total | vs low | vs estimate | Gap to next | Loaded items | Cut items |
|---|---|---|---|---|---|---|---|
| 1 | CLARK CONSTRUCTION OF TEXAS, INC. | $19,126,405 | 5.1% | $1,289,164 | 2+$2,656,639 | 1-$650,619 | |
| 2 | HAYDEN PAVING, INC. | $20,415,569 | +6.7% | 12.2% | $1,252,468 | 2+$4,414,839 | 1-$650,619 |
| 3 | RONALD R. WAGNER & CO., LP | $21,668,037 | +13.3% | 19.0% | $458,573 | 2+$3,263,494 | 1-$650,619 |
| 4 | CK NEWBERRY, LLC | $22,126,611 | +15.7% | 21.5% | 2+$1,856,639 | 0 |
Loaded: priced 1.75x or more over the statewide average low bid. Cut: half of it or less. Only items worth at least $2,500 or 0.5% of the bid count. Checked for the top 4 bidders.
Where the job was won
CLARK CONSTRUCTION OF TEXAS, INC. vs HAYDEN PAVING, INC., biggest item swings| Item | Qty | Low | 2nd | Market | 2nd minus low |
|---|---|---|---|---|---|
| 500-7001 MOBILIZATION | 1 LS | $2,950,000.00 | $4,425,000.00 | $523,850.32 | $1,475,000 |
| 316-7023 ASPH (AC-20-5TR) | 11,095.27 TON | $605.00 | $560.00 | $696.11 | -$499,287 |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 6 MO | $50,000.00 | $97,200.00 | $11,585.04 | $283,200 |
| 316-7273 AGGR (TY PB OR PL, GR-3)(SAC-A) | 28,274 CY | $136.64 | $138.00 | $158.20 | $38,453 |
| 316-7241 AGGR (TY-PB OR PL, GR-4)(SAC-A) | 13,970 CY | $144.67 | $143.00 | $180.75 | -$23,330 |
| 316-7245 AGGR (TY-PB OR PL, GR-4)(SAC-B) | 9,781 CY | $145.90 | $148.00 | $165.18 | $20,540 |
| 503-7002 PORTABLE CHANGEABLE MESSAGE SIGN | 2 EA | $7,500.00 | $10.00 | $9,253.78 | -$14,980 |
| 672-7004 REFL PAV MRKR TY II-A-A | 39,958 EA | $3.10 | $3.20 | $3.97 | $3,996 |
| 666-7036 REFL PAV MRK TY I (W)24"(SLD)(100MIL) | 8,111 LF | $6.00 | $6.16 | $7.19 | $1,298 |
| 668-7091 PREFAB PM TY C (W)(ARROW) | 203 EA | $190.00 | $195.00 | $201.69 | $1,015 |
| 668-7103 PREFAB PM TY C (W)(WORD) | 168 EA | $225.00 | $231.00 | $249.54 | $1,008 |
| 666-7179 RE PM TY II (W) 8" (SLD) | 63,225 LF | $0.3800 | $0.3900 | $0.4127 | $632 |
| 672-7002 REFL PAV MRKR TY I-C | 4,575 EA | $3.60 | $3.70 | $4.04 | $458 |
| 668-7111 PREFAB PM TY C (W)(36")(YLD TRI) | 420 EA | $30.00 | $31.00 | $38.96 | $420 |
| 672-7006 REFL PAV MRKR TY II-C-R | 2,082 EA | $4.00 | $4.10 | $4.19 | $208 |
| 668-7001 PRFB RUMBLE STRIP (BLK)(4')(TRANSVERSE) | 480 LF | $12.00 | $12.31 | $10.44 | $149 |
| 668-7108 PREFAB PM TY C (W)(RR XING) | 10 EA | $555.00 | $569.00 | $602.94 | $140 |
| 668-7093 PREFAB PM TY C (W)(DBL ARROW) | 16 EA | $240.00 | $246.00 | $314.80 | $96 |
| 666-7117 REFL PAV MRK TY I (Y)12"(SLD)(100MIL) | 756 LF | $4.00 | $4.10 | $3.19 | $76 |
| 668-7110 PREFAB PM TY C (W)(18")(YLD TRI) | 34 EA | $30.00 | $31.00 | $25.92 | $34 |
Positive: the low bidder was cheaper on that item. These 20 items account for $1,289,125 of the $1,289,164 gap.