PHR_SL499_FY24
1137-02-044 · let Oct 7, 2026 · Cameron, Pharr · Safety Improvement Projects
$102,744Low bid: AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., LLC-2.3% vs estimate $105,184
$2,178Left on the table2.1% gap to the second bid
4BiddersSpread 32% low to high
34Items comparedAgainst statewide low-bid averages
The bids
| # | Bidder | Total | vs low | vs estimate | Gap to next | Loaded items | Cut items |
|---|---|---|---|---|---|---|---|
| 1 | AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., LLC | $102,744 | -2.3% | $2,178 | 2+$7,900 | 3-$551,251 | |
| 2 | THE LEVY COMPANY, LLC | $104,922 | +2.1% | -0.2% | $18,739 | 2+$14,806 | 5-$565,098 |
| 3 | TRAF-TEX, INC. | $123,660 | +20.4% | 17.6% | $11,738 | 4+$30,255 | 2-$553,863 |
| 4 | STRUCTURAL INTEGRITY GROUP LLC | $135,399 | +31.8% | 28.7% | 3+$28,017 | 3-$520,134 |
Loaded: priced 1.75x or more over the statewide average low bid. Cut: half of it or less. Only items worth at least $2,500 or 0.5% of the bid count. Checked for the top 4 bidders.
Where the job was won
AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., LLC vs THE LEVY COMPANY, LLC, biggest item swings| Item | Qty | Low | 2nd | Market | 2nd minus low |
|---|---|---|---|---|---|
| 540-7001 MTL W-BEAM GD FEN (TIM POST) | 100 LF | $75.00 | $114.54 | $25.60 | $3,954 |
| 505-7001 TMA (STATIONARY) | 29 DAY | $185.00 | $64.55 | $217.57 | -$3,493 |
| 680-7011 INSTALL HWY TRF SIG (UPGRADE) | 1 EA | $6,500.00 | $3,477.20 | $8,031.16 | -$3,023 |
| 544-7001 GUARDRAIL END TREATMENT (INSTALL) | 1 EA | $6,150.00 | $9,102.23 | $3,190.07 | $2,952 |
| 684-7012 TRF SIG CBL (TY A)(12 AWG)(7 CONDR) | 1,089 LF | $2.50 | $4.76 | $3.81 | $2,461 |
| 682-7018 PED SIG SEC (LED)(COUNTDOWN) | 8 EA | $550.00 | $849.52 | $800.00 | $2,396 |
| 416-7042 DRILL SHAFT (TRF SIG POLE) (24 IN) | 18 LF | $145.00 | $270.35 | $298.36 | $2,256 |
| 432-7013 RIPRAP (MOW STRIP)(4 IN) | 8 CY | $750.00 | $1,024.00 | $616.83 | $2,192 |
| 658-7001 INSTL DEL ASSM (D-SW)SZ 1(WFLX)GF2 | 6 EA | $350.00 | $21.55 | $29.24 | -$1,971 |
| 688-7001 PED DETECT PUSH BUTTON (APS) | 8 EA | $1,500.00 | $1,277.92 | $1,056.39 | -$1,777 |
| 687-7001 PED POLE ASSEMBLY | 3 EA | $1,850.00 | $1,311.48 | $2,930.76 | -$1,616 |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 4 MO | $2,800.00 | $2,441.26 | $11,585.04 | -$1,435 |
| 500-7001 MOBILIZATION | 1 LS | $10,500.00 | $9,177.05 | $523,850.32 | -$1,323 |
| 618-7030 CONDT (PVC) (SCH 40) (2") | 57 LF | $25.00 | $38.55 | $13.17 | $772 |
| 687-7006 REMOVE PED PUSH BUTTON POST ASSEM | 2 EA | $350.00 | $58.43 | $71.00 | -$583 |
| 540-7015 DOWNSTREAM ANCHOR TERMINAL SECTION | 1 EA | $3,250.00 | $3,792.60 | $1,297.32 | $543 |
| 636-7001 ALUMINUM SIGNS (TY A) | 12.5 SF | $75.00 | $43.70 | $51.10 | -$391 |
| 620-7007 ELEC CONDR (NO.8) BARE | 320 LF | $2.20 | $1.80 | $1.94 | -$128 |
| 682-7037 BACKPLATE W/REFL BRDR(4 SEC) | 2 EA | $225.00 | $266.27 | $193.06 | $83 |
| 682-7001 VEH SIG SEC (12")LED(GRN) | 8 EA | $350.00 | $358.82 | $326.91 | $71 |
Positive: the low bidder was cheaper on that item. These 20 items account for $1,941 of the $2,178 gap.
AUSTIN TRAFFIC SIGNAL CONSTRUCTION CO., LLC: unbalanced items
Placed 1| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 540-7001 MTL W-BEAM GD FEN (TIM POST) | 100 LF | $75.00 | $25.60 | 2.93x | $4,940 |
| 544-7001 GUARDRAIL END TREATMENT (INSTALL) | 1 EA | $6,150.00 | $3,190.07 | 1.93x | $2,960 |
| 500-7001 MOBILIZATION | 1 LS | $10,500.00 | $523,850.32 | 0.02x | -$513,350 |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 4 MO | $2,800.00 | $11,585.04 | 0.24x | -$35,140 |
| 416-7042 DRILL SHAFT (TRF SIG POLE) (24 IN) | 18 LF | $145.00 | $298.36 | 0.49x | -$2,760 |
THE LEVY COMPANY, LLC: unbalanced items
Placed 2| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 540-7001 MTL W-BEAM GD FEN (TIM POST) | 100 LF | $114.54 | $25.60 | 4.47x | $8,894 |
| 544-7001 GUARDRAIL END TREATMENT (INSTALL) | 1 EA | $9,102.23 | $3,190.07 | 2.85x | $5,912 |
| 500-7001 MOBILIZATION | 1 LS | $9,177.05 | $523,850.32 | 0.02x | -$514,673 |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 4 MO | $2,441.26 | $11,585.04 | 0.21x | -$36,575 |
| 687-7001 PED POLE ASSEMBLY | 3 EA | $1,311.48 | $2,930.76 | 0.45x | -$4,858 |
| 680-7011 INSTALL HWY TRF SIG (UPGRADE) | 1 EA | $3,477.20 | $8,031.16 | 0.43x | -$4,554 |
| 505-7001 TMA (STATIONARY) | 29 DAY | $64.55 | $217.57 | 0.30x | -$4,438 |
TRAF-TEX, INC.: unbalanced items
Placed 3| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 680-7011 INSTALL HWY TRF SIG (UPGRADE) | 1 EA | $25,200.00 | $8,031.16 | 3.14x | $17,169 |
| 432-7013 RIPRAP (MOW STRIP)(4 IN) | 8 CY | $1,361.00 | $616.83 | 2.21x | $5,953 |
| 540-7015 DOWNSTREAM ANCHOR TERMINAL SECTION | 1 EA | $5,000.00 | $1,297.32 | 3.85x | $3,703 |
| 544-7001 GUARDRAIL END TREATMENT (INSTALL) | 1 EA | $6,620.00 | $3,190.07 | 2.08x | $3,430 |
| 500-7001 MOBILIZATION | 1 LS | $11,307.00 | $523,850.32 | 0.02x | -$512,543 |
| 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLING | 4 MO | $1,255.00 | $11,585.04 | 0.11x | -$41,320 |
STRUCTURAL INTEGRITY GROUP LLC: unbalanced items
Placed 4| Item | Qty | Their price | Market | x market | $ vs market |
|---|---|---|---|---|---|
| 432-7013 RIPRAP (MOW STRIP)(4 IN) | 8 CY | $2,073.42 | $616.83 | 3.36x | $11,653 |
| 680-7011 INSTALL HWY TRF SIG (UPGRADE) | 1 EA | $17,729.01 | $8,031.16 | 2.21x | $9,698 |
| 684-7012 TRF SIG CBL (TY A)(12 AWG)(7 CONDR) | 1,089 LF | $9.93 | $3.81 | 2.61x | $6,667 |
| 500-7001 MOBILIZATION | 1 LS | $15,852.21 | $523,850.32 | 0.03x | -$507,998 |
| 505-7001 TMA (STATIONARY) | 29 DAY | $1.00 | $217.57 | 0.00x | -$6,281 |
| 687-7001 PED POLE ASSEMBLY | 3 EA | $978.94 | $2,930.76 | 0.33x | -$5,855 |